Planning application
Phase 6B Stratton Business Park, East of Pegasus Drive, Biggleswade
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Non-material amendment to planning permission CB/20/01520/FULL (The erection of 4 no. B8 distribution units, together with associated energy centre, balancing pond, landscaping and all other ancillary works) amendment sought to Changing to the wording of condition 12 to read as follows: "Prior to occupation of the development, details of charging plug-in points and other ultra low emission vehicles shall be submitted to and approved in writing by the Local Planning Authority (discharged 11th October 2022 by 6425 -1999 Rev C03 Overall Masterplan-RC-EG-LT-52, Rolec Car Chargers and EVC DESIGN) , in accordance with the sustainability statement . The scheme shall indicate where visitor parking may contain such charging facilities. The approved details shall be fully installed within three months of the first occupation of the development."
As published by the council, reference CB/22/04839/NMA
Application record
- Reference
- CB/22/04839/NMA
- Type
- Non-material Change to Permission
- Status
- Decided
- Decision
- Granted As published: Non-Material Amendment - Granted
- Received
- 15 Dec 2022
- Validated
- 16 Dec 2022
- Decided
- 20 Dec 2022
- Parish
- Biggleswade
- Decision by
- Officer Delegated
Timeline
Dates from the published record
-
15 Dec 2022
Received by Central Bedfordshire
-
16 Dec 2022
Validated
Checked as complete and ready for consideration.
-
20 Dec 2022
Decision issued: Non-Material Amendment - Granted
-
9 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Central Bedfordshire granted permission on 20 December 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Other amendment applications
In Central Bedfordshire
-
CB/26/02843/NMA Awaiting decision
Land at Sundon Sub Station, Luton Road, Charlton, LU4 9UJ
Non-material amendment to planning permission CB/25/03193/VOC. Amendment sought, updates to the layout in terms of arrangement of equipment on site
-
CB/26/02473/NMA Granted
Land Southeast of Greenway, Campton SG17 5BN
Non-material amendment to planning permission CB/23/02702/RM. Amendment sought to update approved plans for compliance with planned development
-
CB/26/02557/VOC Withdrawn
4 Monks Close, Dunstable, LU5 4JR
Variation or Removal of condition number 2 of planning permission CB/26/00856/FULL. Variation Sought Original drawing numbers replaced with new drawing numbers showing changes to the extension.
-
CB/26/02220/NMA Granted
Former Vauxhall Motors, Luton Road, Chalton, Luton, LU4 9TT
Non-material amendment to planning permission CB/25/01112/RM. Amendment sought to the wording of condition 7 to enable parts of the development unrelated to water supply to be progressed in advance of discharging the condition
-
CB/26/02756/VOC Awaiting decision
40 Becketts Close, Maulden, Bedford, MK45 2JL
Variation of condition number 3 of planning permission CB/19/00536/FULL: Variation sought to approved plans - insertion of larger window to the side elevation