Planning application
Electricity Sub Station At Junction Of Woodman Close And South Street, Woodman Close, Leighton Buzzard, LU7 3NU
Works: Extension
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Electricity Works - Permitted Development of a proposed extension
As published by the council, reference CB/21/03881/EPD
Application record
- Reference
- CB/21/03881/EPD
- Type
- Electricity works -Permitted Development
- Status
- Decided
- Decision
- Comments Released
- Received
- 20 Aug 2021
- Validated
- 20 Aug 2021
- Decided
- 8 Sep 2021
- Postcode
- LU7 3NU
Timeline
Dates from the published record
-
20 Aug 2021
Received by Central Bedfordshire
-
8 Sep 2021
Decision issued: Comments Released
-
3 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsAfter the decision
Central Bedfordshire has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
86 Hockliffe Road, Leighton Buzzard, LU7 3FN
Removal of existing single storey rear extension and construction of new two-storey rear extension
Granted Full applications Extension 8 docsSmall domestic -
51 Waterdell, Leighton Buzzard, LU7 3PH
Single-storey side extension
Granted Full applications Extension 6 docsSmall domestic -
23 South Street, Leighton Buzzard, LU7 3NT
Single storey rear extension.
Granted Full applications Extension 10 docsSmall domestic -
11 Regent Street, Leighton Buzzard, LU7 3JY
Single storey rear extension
Granted Full applications Extension 8 docsSmall domestic -
63 Regent Street, Leighton Buzzard, LU7 3JY
Erection of a single storey rear extension, new bicycle shed to the front, new front bay window, garage conversion with new lean to roof and new front gate
Withdrawn Full applications Extension Windows or glazing 18 docsSmall domestic -
63 Regent Street, Leighton Buzzard, LU7 3JY
Conversion of front garage, single storey rear extension and associated changes
Granted Full applications Extension 22 docsSmall domestic
Other prior approval applications
In Central Bedfordshire
-
CB/26/02527/EPD Decided
Land at Oakwell Park, LU5 6GU
Electricity Works Permitted Development: To relocate an existing substation
-
CB/26/02449/EPD Decided
Biggleswade Eastern ELC Sub Station, Holme Crescent, Biggleswade, Bedfordshire. SG18 8DF
Electricity Works Permitted Development (Install a new 10kVA generator on new concrete foundation. Install power duct from source to genny. Install wide cable trunking on concrete base. Install AMF panel on a new pole fixed to concrete base. Retain the Eltek PSU cabinet)
-
CB/26/02429/EPD Withdrawn
Four Fields, Tebworth Road, Tebworth, Leighton Buzzard, LU7 9PZ
Electricity Works Permitted Development related to an overhead line.
-
CB/26/02317/EPD Awaiting decision
Four Fields, Tebworth Road, Tebworth, Leighton Buzzard, LU7 9PZ
Electricity Works Permitted Development, disconnection of existing O/H to U/G single phase service and connection of a new three phase O/H service with a new pole installation.
-
CB/26/01178/EPD Granted
7 Water End, Wrestlingworth, Sandy, SG19 2HA
Electricity Board Notification: To rectify an existing safety compliance issue with the current low voltage overhead service to the property No 7 Water End, SG19 2HA. The proposal is to install a new intermediate pole and install new underground cable. The existing low voltage overhead service will then be removed.