Central Bedfordshire recorded 11 planning applications in February 2022, listed newest first. Dates are as received, or as decided where the council publishes no submission date.

Applications, February 2022

Newest first

  • Land within the former Fullers Earth Quarry, Ampthill Road, Clophill, Beds

    Full Application for Planning Permission for the construction of a visitors centre with staff office; workshop and storage area; food service area; toilets; and covered eating area, and for a play area with covered area.

    Submitted 28 Feb 2022 Full applications
  • CB/22/00763/VOC Granted

    Land Adjoining Dunstable Road And To The Rear Of My Folly And The Scout Hut, Dunstable Road, Caddington

    Variation of condition number 8 of planning permission CB/17/05679/OUT (Residential development and associated infrastructure) Variation of the condition is required to resolve conflict between conditions 1 and 8, for layout, landscape & trees and to allow flexibility within the condition as part of bringing forward a reserved matters application.

    Submitted 23 Feb 2022 Amendments
  • CB/22/00768/OUT Granted

    Land to the East of Leighton Road and off Russell Road, Toddington

    Outline Application: Erection of up to 61 dwellings. All matters reserved except access off Russell Road.

    Submitted 23 Feb 2022 Outline
  • CB/22/00762/LDCP Withdrawn

    Clock House, 17 Wavendon Road, Salford, Milton Keynes, MK17 8BB

    Lawful Development Certificate Proposed -Erection of single storey double garage and store

    Submitted 23 Feb 2022 Lawful development
  • CB/22/00777/DOC Granted

    Former Sand Quarry Chamberlains Barn, Heath Road, Leighton Buzzard LU7 3AD

    Discharge of Conditions 2,3 & 4 against planning permission CB/20/00447/FULL (Installation of four Electric Vehicle (EV) charging bays, including two DC rapid chargers, 1 AC fast charger, a GRP switchgear and metering cabinet, sedum roof shelter, associated infrastructure, and for the road section between Kemsley Drive and the charging area)

    Submitted 23 Feb 2022 Conditions
  • CB/22/00760/EB Awaiting decision

    LU1 4GB / E: 508341 N: 219023

    Electricity Board Notification:New connections to existing tower

    Submitted 22 Feb 2022 Other
  • CB/22/00731/EB Granted

    Newlands Road Pepperstock LU1 4GB

    Electricity Board Notification: Proposed network alterations

    Submitted 21 Feb 2022 Other
  • CB/22/00684/VOC Withdrawn

    Land at 3 Grove Road and 15 Park Road, Dunstable, LU5 4BY

    Removal of condition numbers 10 and 16 of planning permission CB/21/04123/FULL (Demolition of factory building. New build 5 family dwellings) Remove condition 10 obscured glazing not required as neighbouring property is more than 21 metres and condition 16 no vehicular gates are proposed.

    Submitted 18 Feb 2022 Amendments
  • CB/22/00644/SCN Decided

    London Road Industrial Estate, Georgetown Road, Sandy, SG19 2UB

    SCN EIA Screening Opinion

    Submitted 16 Feb 2022 Outline
  • CB/22/00571/VOC Withdrawn

    Land to the rear of Hilldene Close, Steppingley Road, Flitwick, Bedford, MK45 1AQ

    Variation of condition number 25 of planning permission CB/15/04675/FULL (Demolition of three residential units and the erection of 56 dwellings comprising, pumping station, access, boundary fence and associated works) Variation sought to move Block B.

    Submitted 11 Feb 2022 Amendments
  • Unit 1, Church Farm, High Street, Eyeworth, Sandy, SG19 2HH

    Change of use from agricultural use to flexible Class E (g), B2 and B8 uses, including removal of corrugated steel structure (building 7) and alterations to access road, including new access road (Part retrospective).

    Submitted 10 Feb 2022 Full applications