Skip to content
PlanIndex Get alerts
Menu

Archive · Central Bedfordshire · 2020

Planning applications in Central Bedfordshire, February 2020

Central Bedfordshire recorded 9 planning applications in February 2020, listed newest first. Dates are as received, or as decided where the council publishes no submission date.

Applications, February 2020

Newest first

  • CB/20/00710/DOC Granted

    Lane Farm, The Lane, Tebworth, Leighton Buzzard, LU7 9QB

    Discharge of Conditions 3, 4, 5, 6, 7, 8, 9, 10, 12, 13, 14 & 18 against planning permission CB/19/01311/FULL (Demolition and replacement of existing farmhouse with two dwellings)

    Submitted 26 Feb 2020 Conditions
  • CB/20/00530/DOC Granted

    Land at Station Road, Harlington

    Discharge of Condtion 3, 5, 6, 8, 9, 12 & 14 to Planning Permission CB/14/02348/OUT (Outline: Redevelopment up to 45 residential units with associated amenity space, landscaping and parking provision. Demolition of existing bungalow)

    Submitted 13 Feb 2020 Conditions
  • Land adjacent to Ashridge, Pepsal End Road, Pepperstock, Luton, LU1 4LJ

    Erection of six affordable key worker cottages

    Submitted 13 Feb 2020 Full applications
  • CB/20/00543/DOC Granted

    Pear Tree Farm, Northwood End Road, Haynes, Bedford, MK45 3QD

    Discharge of Condition 4: Tree protection and 5: Landscaping scheme, against planning permission CB/18/02853/FULL (Proposed replacement dwelling)

    Submitted 13 Feb 2020 Conditions
  • CB/20/00529/NMA Granted

    Land Off Bedford Road to North of Gold Furlong Marston Moretaine

    Non-material amendment to planning permission CB/16/01373/RM Reserved Matters: Permission is being sought for the Access, Appearance, Landscaping, Layout and Scale following Outline application CB/14/2084/OUT Development of up to 50 dwellings (falling within use class C3) circa 1.23 hectares of employment related development for uses falling in use classes B1, D1 and D2; a local centre of circa 0.13 hectares to include a range of retail and commercial uses falling within use classes A1/A2/A3/A4/A5, 0.3 hectares of school playing field land; associated infrastructure including the principle of access from gold furlong (the primary street serving the existing Marston Park development), and its approved access road spur; internal access roads, pedestrian footpaths and cycle routes including improvements to the pedestrian connection linking through to Stewartby Lake, car and cycle parking, utilities and drainage, landscape works and ground remodelling. Amendment sought to change the position of the Local Centre by 1.2m in westerly direction from the position approved. Consequently this will remove first and second floor windows serving the bedroom in the western elevation of the building.

    Submitted 13 Feb 2020 Amendments
  • CB/20/00499/DOC Granted

    27 Bedford Road, Henlow, SG16 6DR

    Discharge of Condition 5 to Planning Permission CB/18/02190/Full (Erection of a two bedroom bungalow, car parking and Access Drive) Condition 5 - Flood Risk and Drainage Assessment Drawing IHL/WD04A

    Submitted 12 Feb 2020 Conditions
  • CB/20/00475/DOC Granted

    Leedon Service Station, Hockliffe Road, Leighton Buzzard, LU7 3JU

    Discharge of Conditions 10 and 13 against planning permission CB/18/02600/FULL (Leedon Service Station, Hockliffe Road, Leighton Buzzard, LU7 3JU)

    Submitted 10 Feb 2020 Conditions
  • CB/20/00422/DOC Granted

    8 Hazelwood Lane, Ampthill, Bedford, MK45 2HA

    Discharge of Condtion Condition 2 (K1229-Materials) & Condition 4 (B18055 Ecology Impact Assessment) To Planning Permission CB/18/03144/Full (Demolition of existing dwelling and the erection of two dwellings with improvements to the existing access, car parking and other associated works)

    Submitted 6 Feb 2020 Conditions
  • CB/20/00432/DOC Withdrawn

    Land On The West Side Of, Astwick Road, Stotfold

    Discharge of Condition 8 to Planning Permission CB/16/04161/OUT (Outline planning permission for up to 100 residential dwellings (including up to 35% affordable housing), demolition of buildings, introduction of structured planting and landscaping, informal public open space and children's play area, surface water flood mitigation and attenuation, vehicular access point from Astwick Road and associated ancillary works. All matters to be reserved except for main site access onto Astwick Road.)

    Submitted 6 Feb 2020 Conditions

Other months in 2020

All of 2020