Skip to content
PlanIndex Get alerts
Menu

Planning application

2b Circular Road, Castlerock

Awaiting decision Causeway Coast and Glens LA01/2026/0850/F Full

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Proposed wall mounted Heat Pump

As published by the council, reference LA01/2026/0850/F

Application record

Reference
LA01/2026/0850/F
Type
Full
Status
Consultation Open
Received
12 Aug 2026
Validated
17 Aug 2026
Ward
Castlerock

Timeline

Dates from the published record

  1. 12 Aug 2026

    Received by Causeway Coast and Glens

  2. 17 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 25 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 12 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Causeway Coast and Glens took a median of 86 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Causeway Coast and Glens for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 Sea Road, Castlerock

    LA01/2025/0380/DC Submitted 24 Apr 2025 98m away

    Discharge of Condition 9 of LA01/2020/0335/F

    Decided Conditions 4 docs
  • 10 Main Street, Castlerock

    LA01/2025/1022/F Submitted 29 Sep 2025 108m away

    Proposed rear extension to include new first floor balcony and covered outdoor kitchen area

    Granted Full applications Extension 15 docs
  • 13 Circular Road Castlerock BT51 4XA

    LA01/2023/0185/F Submitted 16 Feb 2023 134m away

    Replacement of rear 1970s return comprising garage, utility and cloakroom on ground floor and sunroom on first floor, with kitchen/diner, utility on ground floor, sunroom on first floor and detached garage.

    Granted Full applications 9 docs
  • 23 Main Street, Castlerock

    LA01/2025/1283/NMC Submitted 2 Dec 2025 184m away

    The changes to be made are an overall scale back of the approved design to be: a loft conversion within the existing roof and internal alterations to the floor plans. The west side is to be extended to a gable end as in the original approved design, following the existing ridge height, with velux roof lights to the north and south elevation. On the lower and upper ground floors existing bay windows to be removed and glazed areas extended. Two ramps have been added externally (Previous Application - LA01/2025/0194/F)

    Granted Amendments Loft or dormer Roofing +1 11 docs
  • 23 Main Street, Castlerock, Coleraine

    LA01/2026/0730/NMC Submitted 1 Jul 2026 184m away

    The changes to be made are an overall scale back of the approved design as per approved applications for Full application LA01/2025/0194/F and Non Material Change application LA01/2025/1283/NMC to be: a rationalisation of the lower section of roof to create a single ridge height with the existing roofline. The west side is to be extended to a gable end as in the original approved design with an additional extended area to the north of the site with a flat roof that butts into the roof, following the existing ridge height, with velux roof lights to the north elevation. On the lower and upper ground floors existing bay windows to be removed and glazed areas extended. Two ramps have been added externally

    Refused Amendments Loft or dormer Roofing +1 4 docs
  • 16 Castle Walk, Castlerock

    LA01/2026/0142/F Submitted 9 Feb 2026 228m away

    Demolition of the existing sunroom and alterations to the rear return. Internal and external alterations, including new window openings to the existing dwelling. Proposed installation of a ramp to the front elevation.

    Granted Full applications Demolition Windows or glazing 11 docs
    Domestic

In Causeway Coast and Glens

  • Directly adjacent to the North of 24 Atlantic Road, Coleraine.

    Proposed Dwelling and Domestic Garage.

    9 Jun 2026 Full applications
  • 263 Corkey Road, Cloughmills, Ballymena

    Internal alterations, new patio door at ground floor and extension at first floor to create additional bedroom suite.

    21 May 2026 Full applications
  • Lands immediately NW of 2 Princess Gardens, Cloughmills

    Proposed new dwelling (Amended Plans and 3D Montage)

    8 Apr 2026 Full applications
  • 37 Parklands, Ballymoney

    Proposed rear and side extension to existing dwelling and alterations to side elevation to add new ground floor window

    31 Mar 2026 Full applications
  • 2 The Hawthorns, Ballysally, Coleraine

    Proposed single-storey rear extension, internal alterations to existing dwelling and conversion of garage to provide additional space for the dwelling.

    18 Jun 2026 Full applications