Planning application
Lands 550m SW of 38 Mullaghmeash Road and.800m NW of Feeny
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Proposed installation of up to 100MW (200MWh) Battery Energy Storage System (BESS), which will consist of the construction of BESS enclosures, Twin MV Skids, substation, auxiliary transformer, storage containers, generator, monitoring house, new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, and all ancillary grid infrastructure and associated works.
As published by the council, reference LA01/2025/0175/F
Application record
- Reference
- LA01/2025/0175/F
- Type
- Full
- Status
- Site Inspection Complete
- Decision
- Granted As published: Permitted
- Received
- 17 Feb 2025
- Validated
- 28 Feb 2025
- Ward
- Park (Derry and Strabane)
Timeline
Dates from the published record
-
17 Feb 2025
Received by Causeway Coast and Glens
-
28 Feb 2025
Validated
Checked as complete and ready for consideration.
-
7 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
83 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Causeway Coast and Glens granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
c. 250m east of 574 Glenshane Rd and 1.1km west of Feeny Village in the townland of Ballyhanedin, Co. Derry/Londonderry, BT47 4TG
Proposed construction of additional and upgraded access tracks extending from an existing access off the B74 (Glenshane Road) to serve the associated Battery Energy Storage System (BESS), underground cabling, ducting and all ancillary works.
Granted Full applications 83 docs
Other full applications
In Causeway Coast and Glens
-
LA01/2026/1075/F Awaiting decision
13 Cappagh Grove, Portstewart
Addition of single storey flat roof extension to rear of property.
-
LA01/2026/0501/F Granted
250m South West of No. 8 Straid Road, Ballycastle
Retrospective Farm Diversification Scheme for a Camp Site & Alpaca Walking Tours and Occasional Open Farm Days (maximum 6 per annum) and associated facilities and amenities, Toilet Block, Reception Hut, Craft Barn, Children's Play Area & Parking.
-
LA01/2026/1012/F Granted
27 Main Street, Limavady
Change of use of the first-floor premises to provide 4no. self-contained residential apartments, comprising of 2no. 1 bedroom apartments to the front (within the existing residential accommodation) and 2no. 2 bedroom apartments to the rear (within the existing storage accommodation serving to the ground floor shop), including alterations to the roof, fenestration and internal layout.
-
LA01/2026/1063/F Awaiting decision
Public footpath approximately 64 metres East of 10 Moyle Road, Ballycastle
Proposed installation of telephone kiosk on public footpath
-
LA01/2026/1055/F Awaiting decision
182 Agivey Road, Aghadowey, Coleraine
Replacment Dwelling (Existing Dwelling to remain as Outhouse/Store)