Planning application

Lands adjacent and 10 metres east of no 9 Letterloan Road, Letterloan Business Park, Macosquin

Granted Causeway Coast and Glens LA01/2024/1351/S54 Section 54

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of Condition 5 (Barrier Height) of C/2014/0153/F (End of Life Vehicle Facilities). Original text for this condition: Within two months of the grant of planning permission, an acoustic barrier of height above ground level of not less than 1.8 m, as indicated on Drawing 03D, received 04-NOV-2014, shall be erected and maintained along the SW boundary of the proposed development site, contiguous with the landscaping buffer outlined in this approved Drawing. The barrier shall be constructed of either masonry, timber panelling (close boarded with no gaps) or of earth and shall have a minimum self weight of 25kg/m2. Proposed amended text for this condition: The acoustic barrier erected on site comprising timber panelling (close boarded with no gaps) shall be retained at a height above ground level of not less than 1.74m and a minimum self weight of 10.3kg/m2 in accordance with the Irwin Carr Memo dated 21 November 2024 (Project No.: 2024405). The acoustic barrier shall be retained insitu in perpetuity unless otherwise agreed in writing by the Council.

As published by the council, reference LA01/2024/1351/S54

Application record

Reference
LA01/2024/1351/S54
Type
Section 54
Status
Determined
Decision
Granted
Received
9 Dec 2024
Validated
10 Dec 2024
Decided
29 Jan 2025
Ward
Macosquin

Timeline

Dates from the published record

  1. 9 Dec 2024

    Received by Causeway Coast and Glens

  2. 10 Dec 2024

    Validated

    Checked as complete and ready for consideration.

  3. 29 Jan 2025

    Decision issued: Granted

  4. 7 Oct 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Causeway Coast and Glens granted permission on 29 January 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.