Skip to content
PlanIndex Get alerts
Menu

Planning application

99a Baranailt Road, Limavady

Granted Causeway Coast and Glens LA01/2024/0894/F Full

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from vacant public house to 2 storey dwelling incorporating 2 storey rear extension.

As published by the council, reference LA01/2024/0894/F

Application record

Reference
LA01/2024/0894/F
Type
Full
Status
Determined
Decision
Granted
Received
5 Aug 2024
Validated
8 Aug 2024
Decided
29 Oct 2024
Ward
Ballykelly

Timeline

Dates from the published record

  1. 5 Aug 2024

    Received by Causeway Coast and Glens

  2. 8 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 29 Oct 2024

    Decision issued: Granted

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Land Approximately 75m South East of 94 Baranailt Road, Limavady

    LA01/2025/0804/F Submitted 8 Aug 2025 225m away

    Proposed Retention of a Livestock Installation for Pig Rearing including 2No. Feed Bins and all Associated Site Works

    Granted Full applications 23 docs
  • Approx 300m North East of 83 Highlands Road, Limavady

    LA01/2026/0828/F Submitted 22 Jul 2026 307m away

    98% historically approved · decision due ~5 Oct

    Proposed 2 no broiler houses (housing 55000 birds in total) with concrete apron to front New free standing silo meal bins (4no), amenity building, extension of existing laneway and new access unto Highland Road to include for bridge over stream, wall support to bridge providing underground washings tanks with slatted covers and discharge pipes to sheugh for storm water.

    Awaiting decision Full applications Extension 25 docs

In Causeway Coast and Glens

  • Directly adjacent to the North of 24 Atlantic Road, Coleraine.

    Proposed Dwelling and Domestic Garage.

    9 Jun 2026 Full applications
  • 263 Corkey Road, Cloughmills, Ballymena

    Internal alterations, new patio door at ground floor and extension at first floor to create additional bedroom suite.

    21 May 2026 Full applications
  • Lands immediately NW of 2 Princess Gardens, Cloughmills

    Proposed new dwelling (Amended Plans and 3D Montage)

    8 Apr 2026 Full applications
  • 37 Parklands, Ballymoney

    Proposed rear and side extension to existing dwelling and alterations to side elevation to add new ground floor window

    31 Mar 2026 Full applications
  • 2 The Hawthorns, Ballysally, Coleraine

    Proposed single-storey rear extension, internal alterations to existing dwelling and conversion of garage to provide additional space for the dwelling.

    18 Jun 2026 Full applications