Planning application
122 Cedar Road Canvey Island Essex SS8 9HS
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Insert dropped kerb and hardstanding
As published by the council, reference 26/0432/FUL
Application record
- Reference
- 26/0432/FUL
- Type
- Full Application
- Status
- Registered
- Received
- 3 Aug 2026
- Validated
- 10 Aug 2026
- Ward
- Canvey Island Central
- Decision by
- Delegated Decision
- Postcode
- SS8 9HS
Site history
Applications at this address on the Castle Point register
This site has had 2 applications since 2024: 0 approved, 1 refused.
-
24/0510/FUL Refused
122 Cedar Road Canvey Island Essex SS8 9HS
Single storey front extension
Timeline
Dates from the published record
-
3 Aug 2026
Received by Castle Point
-
10 Aug 2026
Validated
Checked as complete and ready for consideration.
-
14 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 5 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Castle Point took a median of 55 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Castle Point for determination, against a statutory target of eight weeks. Over the last year Castle Point decided full applications in a median of 57 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
122 Cedar Road Canvey Island Essex SS8 9HS
Single storey front extension
Refused Full applications Extension 16 docsSmall domestic -
Land Adjacent To 134 Cedar Road Canvey Island Essex SS8 9HS
Lawful commencement of planning permission 18/0219/FUL in October 2021, with operations including but not limited to foundations and floor to the double garage, level reduction and associated works
Granted Lawful development 8 docs -
Site Adjacent To 45 Linden Way Canvey Island SS8 9JB
Submission of details pursuant to conditions 3 (Materials), 5 (Landscaping), 6 (Hydrostatic/Hydrodynamic Pressures) and 10 (Flood Response Plan) of permission 23/0764/FULCLC
Granted Conditions 11 docs -
Site Adjacent To 45 Linden Way Canvey Island SS8 9JB
Submission of details pursuant to condition 4 (Drainage), condition 9 (Parking Bollards) and condition 11 (Cycle Storage) of permission 23/0764/FULCLC
Granted Conditions 10 docs -
Site Adjacent To 45 Linden Way Canvey Island SS8 9JB
Submission of details pursuant to condition 4 (Drainage) and condition 9 (Parking Bollards) of permission 23/0764/FULCLC
Granted Conditions 11 docs -
19 Almond Walk Canvey Island Essex SS8 9JD
Single storey rear extension and loft conversion with front and rear dormers
Refused Full applications Extension Loft or dormer 8 docsSmall domestic
Other full applications
In Castle Point
-
26/0439/FUL Granted
43 Burlington Gardens Hadleigh Benfleet Essex SS7 2JJ
Construct hip to gable roof extension, rear dormer and external alterations
-
26/0452/FUL Granted
41 Woodcote Way Thundersley Benfleet Essex SS7 4ND
Construct two storey rear extension
-
26/0457/FUL Granted
58 Furtherwick Road Canvey Island Essex SS8 7AE
External alterations including new windows and doors
-
26/0419/FUL Granted
378 Daws Heath Road Hadleigh Benfleet Essex SS7 2UA
Demolish part rear extension and construct single storey rear extension and external alterations including rear raised platform and steps to garden
-
26/0401/FUL Granted
33 The Driveway Canvey Island Essex SS8 0AB
Demolition of rear extension, raising of roof and construction of a hip-to-gable loft extension, 1.5-storey rear extension with rear balcony, and associated external alterations