Planning application
Hayle Steli Avenue Canvey Island Essex SS8 9QF
Works: Extension Demolition Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Demolish existing garage and construct single storey front extension and fenestration alteration
As published by the council, reference 21/0770/FUL
Application record
- Reference
- 21/0770/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Refused As published: Refusal
- Received
- 4 Aug 2021
- Validated
- 6 Aug 2021
- Decided
- 1 Oct 2021
- Ward
- Canvey Island Winter Gardens
- Decision by
- Delegated Decision
- Postcode
- SS8 9QF
Timeline
Dates from the published record
-
4 Aug 2021
Received by Castle Point
-
6 Aug 2021
Validated
Checked as complete and ready for consideration.
-
1 Oct 2021
Decision issued: Refusal
-
30 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
11 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this refusal means
Castle Point refused this application for the reasons on the decision notice; only the applicant can appeal, and refused schemes often return in revised form. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
65 Steli Avenue Canvey Island Essex SS8 9QF
Demolition of existing conservatory, construction of single story rear extension with roof light, loft conversion with side wraparound dormers and garage conversion with fenestration alterations
Refused Lawful development Extension Loft or dormer +2 9 docs -
12 Steli Avenue Canvey Island Essex SS8 9QF
Garage conversion and single storey rear extension with Sukkah light on roof
Granted Full applications Extension 19 docsSmall domestic -
1 Summerlands Canvey Island Essex SS8 9QU
Construct ground floor rear/side wrap around extension
Granted Full applications Extension 18 docs -
65 Steli Avenue Canvey Island Essex SS8 9QF
Demolition of existing conservatory and construction of single storey rear extension with roof light, loft conversion with side dormers and garage conversion with fenestration alterations
Granted Lawful development Extension Loft or dormer +2 15 docsSmall domestic -
Land Adjoining 14 Station Approach Canvey Island Essex SS8 9RB
Non-material amendment following approval 18/0991/FUL to amend Plots 2 & 3: with addition of a staircase on first floor level to loft floor level to add a bedroom, bathroom and storage area and ground Floor W/C to be moved and addition of 4x Skylights (front and rear)
Granted Amendments 6 docs -
Land Adjoining 14 Station Approach Canvey Island Essex SS8 9RB
Redesign and relocation of plot 1 to avoid strategic mains pipe & extinguishment of footpath No.30 (in relation to original approved plan ref: 18/0991/FUL)
Granted Full applications 24 docs
Other full applications
In Castle Point
-
26/0439/FUL Granted
43 Burlington Gardens Hadleigh Benfleet Essex SS7 2JJ
Construct hip to gable roof extension, rear dormer and external alterations
-
26/0452/FUL Granted
41 Woodcote Way Thundersley Benfleet Essex SS7 4ND
Construct two storey rear extension
-
26/0457/FUL Granted
58 Furtherwick Road Canvey Island Essex SS8 7AE
External alterations including new windows and doors
-
26/0419/FUL Granted
378 Daws Heath Road Hadleigh Benfleet Essex SS7 2UA
Demolish part rear extension and construct single storey rear extension and external alterations including rear raised platform and steps to garden
-
26/0401/FUL Granted
33 The Driveway Canvey Island Essex SS8 0AB
Demolition of rear extension, raising of roof and construction of a hip-to-gable loft extension, 1.5-storey rear extension with rear balcony, and associated external alterations