Skip to content
PlanIndex Get alerts
Menu

Planning application

75 Warren Road Leigh-on-sea Essex SS9 3TT

Granted Castle Point 21/0297/FUL Full Application

Works: Extension Loft or dormer Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolish existing conservatory and construct single storey rear extension and loft conversion with pitched roof dormer to rear elevation

As published by the council, reference 21/0297/FUL

Application record

Reference
21/0297/FUL
Type
Full Application
Status
Decided
Decision
Approval
Received
29 Mar 2021
Validated
7 Apr 2021
Decided
25 May 2021
Ward
St. James'
Decision by
Delegated Planning Officer
Postcode
SS9 3TT

Timeline

Dates from the published record

  1. 29 Mar 2021

    Received by Castle Point

  2. 7 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 25 May 2021

    Decision issued: Approval

  4. 9 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 66 Warren Road Leigh-on-sea Essex SS9 3TS

    23/0120/FUL Submitted 27 Feb 2023 64m away

    Garage conversion and single storey rear extension

    Granted Full applications Extension 8 docs
    Small domestic
  • 60 Warren Road Leigh-on-Sea Essex SS9 3TS

    21/0403/FUL Submitted 22 Apr 2021 88m away

    Part garage conversion and single storey side/rear extension

    Granted Full applications Extension 8 docs
    Small domestic
  • 51 Woodlands Park Leigh-on-sea Essex SS9 3TP

    23/0005/FUL Submitted 3 Jan 2023 93m away

    Part one, part two storey front/side/rear extension incorporating a semi-integral garage, raised ridge and other roof alterations, and removal of chimney

    Granted Full applications Extension Roofing 11 docs
  • 92 Warren Road Leigh-on-sea Essex SS9 3TS

    24/0549/CDN Submitted 23 Sep 2024 96m away

    Submission of details pursuant to the discharge of condition 3 (Construction Management Plan) of permission 24/0465/FUL

    Granted Conditions 5 docs
  • 92 Warren Road Leigh-on-sea Essex SS9 3TS

    24/0465/FUL Submitted 13 Aug 2024 96m away

    Demolition of existing side extensions and erection of first floor front extension, part single/part two storey rear and side extensions, new basement floor and other alterations

    Granted Full applications Extension Demolition 20 docs
  • 69 Woodlands Park Leigh-on-sea Essex SS9 3TP

    21/0432/FUL Submitted 27 Apr 2021 139m away

    Demolish existing conservatory and rear dormer and construct part single/part two storey rear extension and fenestration alterations

    Granted Full applications Extension Loft or dormer +2 8 docs

In Castle Point

  • 26/0184/FUL Granted

    514 London Road Benfleet Essex SS7 1AA

    Construction of 1No. five bed detached house

    1 Apr 2026 Full applications
  • 26/0417/FUL Granted

    53 Grove Road Benfleet Essex SS7 1JH

    Construct single-storey rear extension with flat roof, front and rear flat-roof dormers and porch extension

    23 Jul 2026 Full applications
  • 26/0400/FUL Refused

    33 Watlington Road Benfleet Essex SS7 5DS

    Demolish garage and construct two storey side extension, single storey rear extension, front dormer, rear dormer extension, front porch and relocation of front door and external alterations

    10 Jul 2026 Full applications
  • 26/0361/FUL Granted

    317 Church Road Thundersley Benfleet Essex SS7 3HJ

    Construct infill extension and convert existing garage/games room into residential dwelling with new porch, rear gable projection, removal of chimney and extension of patio/retaining wall. Provide new vehicular crossover to original house with parking facilities.

    26 Jun 2026 Full applications
  • 26/0397/FUL Granted

    4 Buren Avenue Canvey Island Essex SS8 8NN

    Demolish existing detatched bungalow and garage, and construct two semi-detached two bedroom houses with associated facilities

    9 Jul 2026 Full applications