Planning application
PENBANK, VELINDRE, LLANDYSUL, SA44 5XE
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
PROPOSED CHANGE OF USE OF HALF OF EXISTING AGRICULTURAL POLE BARN APPROVED UNDER PLANNING APPROVAL W/35136 FROM AGRICULTURAL TO ASSEMBLY USE
As published by the council, reference W/36323
Application record
- Reference
- W/36323
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Full Granted
- Received
- 11 Oct 2017
- Validated
- 23 Oct 2017
- Decided
- 18 Dec 2017
- Ward
- Llangeler (Historic)
- Parish
- Llangeler
- Decision by
- Delegated
- Postcode
- SA44 5XE
Timeline
Dates from the published record
-
11 Oct 2017
Received by Carmarthenshire
-
23 Oct 2017
Validated
Checked as complete and ready for consideration.
-
18 Dec 2017
Decision issued: Full Granted
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Carmarthenshire granted permission on 18 December 2017, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
LAND AT PEN-Y-BANC FARM, VELINDRE, LLANDYSUL, SA44 5XE
DEVELOPMENT OF A MOUNTAIN BIKE SKILLS AND TRAINING CENTRE. THIS WILL BE ONE OF THE FIRST OF IT'S KIND IN WALES. THE DEVELOPMENT WILL NEED CHANGE OF USE FOR 1 ACRE (0.4 HECTARE) AGRICULTURAL LAND. THIS WILL BE FENCED OFF FROM THE CURRENT FIELD AREA AND WILL USE THE SAME ROAD ENTRANCE
Granted Full applications 10 docs -
Land at Penbanc, Velindre, Llandysul, SA44 5XE
Proposed rural enterprise dwelling (second dwelling) comprising a single bedroom off grid Carbon Neutral Cabin
Refused Full applications 13 docsDomestic -
PENYBANC FARM, DREFELIN, DREFACH FELINDRE, LLANDYSUL, SA44 5XE
PROPOSED ERECTION OF TIPIS AS WEDDING RECEPTION SPACE, GAZEBO AS COVERED WEDDING AND LEARNING COURSE SPACE AND APPROVAL OF SMALL CAMPING SITE OF 3 YURTS
Granted Full applications 6 docs -
Troed Y Rhiw, Velindre, Llandysul, SA44 5XD
Removal of two existing outbuildings, to be replaced by a new outbuilding incorporating annex accommodation
Granted Householder 19 docsSmall domestic -
Troed Y Rhiw, Velindre, Llandysul, SA44 5XD
Non-Material Amendment to PL/09968 (Move position of development 1250mm to 2200mm away from house)
Granted Amendments 4 docs -
Land to west of Pant Teg, Velindre, Llandysul, SA44 5XB
78% historically approved · decision due ~31 Aug
Construction of new two storey dwelling house including access onto a private land and associated works (Resubmission of PL/10382 Refused on 17.06.26)
Awaiting decision Full applications 23 docsDomestic
Other full applications
In Carmarthenshire
-
PL/11198 Granted
Towy Retail Park, Old Llangunnor Road, Carmarthen
Installation of solar panels on the building’s low-pitched, barrel-shaped
-
PL/11000 Granted
Pantymaen, Gellywen, Carmarthen, SA33 6DR
Erection of a portal framed agricultural building for cattle housing and associated works
-
PL/10493 Granted
Capel Farm, Carmarthen, SA33 5ED
Construction of concrete silage store and effluent tank built to SSAFO regs and associated works
-
PL/10577 Withdrawn
Bryngwyn, Talley, Llandeilo, SA19 7DQ
Change of use of land for the siting of a static caravan for farm workers accommodation and associated works (retrospective)
-
PL/10989 Granted
Land adjacent to the Tywi Valley Path, Nantgaredig, SA32 7LG
A mobility hub comprising 19 car parking spaces, including for 8 spaces designated for EV charging, cycle parking and associated infrastructure including a canopy over the EV chargers