Planning application
ROBINS OAK, COED RHYAL, PINGED, PEMBREY, BURRY PORT, SA16 0JS
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
RESIDENTIAL CONVERSION OF FORESTRY BUILDING INTO A DWELLING, OFFICE AND PREPARATION ROOM. TEMPORARY RESIDENTIAL USE OF CARAVAN ON SITE. NEW LIVESTOCK HOUSING TO BE BUILT TO HOUSE GOATS, TURKEYS AND CHICKENS. TWO POLYTUNNELS TO BE ERECTED FOR PRODUCE, FRUIT, VEG AND HERBS. PROPOSED BEEHIVES ON LAND FOR PRODUCTION OF HONEY. CONVERSION OF SOLAR KILN TO SALES SHOP
As published by the council, reference S/36317
Application record
- Reference
- S/36317
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Full Granted
- Received
- 26 Sep 2017
- Validated
- 20 Oct 2017
- Decided
- 21 Dec 2017
- Ward
- Pembrey (Historical)
- Parish
- Pembrey and Burry Port Town
- Decision by
- Delegated
- Postcode
- SA16 0JS
Timeline
Dates from the published record
-
26 Sep 2017
Received by Carmarthenshire
-
20 Oct 2017
Validated
Checked as complete and ready for consideration.
-
21 Dec 2017
Decision issued: Full Granted
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
51 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Carmarthenshire granted permission on 21 December 2017, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Meldan Stables, Pembrey, Burry Port, SA16 0JS
Variation of Condition 2, 4 and 5 on PL/06147 (Amend condition 2 of PL/06147 to provide a larger dayroom/teaching room & deletion of conditions 4 and 5 to allow occupation by any traveller/gypsy family and need of restoration condition as need of pitches exceeds delivery)
Granted Amendments 20 docs -
Meldan Stables, Pembrey, Burry Port, SA16 0JS
Provision of multi-purpose shed for storage of vintage cars, tools, mowers, carriages and childrens play equipment (Retrospective)
Refused Full applications 14 docsSmall domestic -
MELDAN STABLE YARD, PEMBREY, BURRY PORT, LLANELLI, SA16 0JS
REPAIR OF EXISTING ROAD IN ORDER TO ENABLE CATTLE LORRY TO DRIVE ON IT
Granted Prior approval 1 doc -
MELDAN STABLE YARD, PINGED, BURRY PORT, LLANELLI, SA16 0JS
PROPOSED AGRICULTURAL ROAD TO DRIVE CATTLE LORRY TO LOAD LIVESTOCK SAFELY
Granted Prior approval 2 docs -
FFRWD COTTAGE, PEMBREY ROAD, PINGED, BURRY PORT, SA16 0JS
DOUBLE STORY REAR GRANNY ANNEX EXTENSION
Granted Householder Extension 7 docsDomestic -
6, WAUNRHEDYMAEN, PEMBREY, BURRY PORT, SA16 0JU
DEMOLITION OF EXISTING SIDE PORCH AND CONSTRUCTION OF NEW SIDE PORCH EXTENSION
Granted Householder Extension Demolition 9 docsSmall domestic
Other full applications
In Carmarthenshire
-
PL/11198 Granted
Towy Retail Park, Old Llangunnor Road, Carmarthen
Installation of solar panels on the building’s low-pitched, barrel-shaped
-
PL/11000 Granted
Pantymaen, Gellywen, Carmarthen, SA33 6DR
Erection of a portal framed agricultural building for cattle housing and associated works
-
PL/10493 Granted
Capel Farm, Carmarthen, SA33 5ED
Construction of concrete silage store and effluent tank built to SSAFO regs and associated works
-
PL/10577 Withdrawn
Bryngwyn, Talley, Llandeilo, SA19 7DQ
Change of use of land for the siting of a static caravan for farm workers accommodation and associated works (retrospective)
-
PL/10989 Granted
Land adjacent to the Tywi Valley Path, Nantgaredig, SA32 7LG
A mobility hub comprising 19 car parking spaces, including for 8 spaces designated for EV charging, cycle parking and associated infrastructure including a canopy over the EV chargers