Planning application
O'KEIP, OCEAN VIEW, BURRY PORT, CARMARTHENSHIRE, SA16 0DW
Works: New dwelling Demolition Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
RESIDENTIAL DEVELOPMENT - DEMOLITION OF EXISTING BUNGALOW & REPLACE WITH 3 BEDROOM RESIDENTIAL DWELLING
As published by the council, reference S/35440
Application record
- Reference
- S/35440
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Full Granted
- Received
- 13 Feb 2017
- Validated
- 24 Apr 2017
- Decided
- 27 Jul 2017
- Ward
- Pembrey (Historical)
- Parish
- Pembrey and Burry Port Town
- Decision by
- Planning Committee
- Postcode
- SA16 0DW
Timeline
Dates from the published record
-
13 Feb 2017
Received by Carmarthenshire
-
24 Apr 2017
Validated
Checked as complete and ready for consideration.
-
27 Jul 2017
Decision issued: Full Granted
-
2 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Carmarthenshire granted permission on 27 July 2017, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
DEVONIA, OCEAN VIEW, BURRY PORT, SA16 0DW
SINGLE STOREY EXTENSION TO SIDE OF PROPERTY
Granted Householder Extension 9 docsSmall domestic -
Elm House, Burry Port, SA16 0DG
Fully restore the deteriorated property and create a sustainable home. Alongside major renovation works, a modest rear extension is proposed to provide essential additional space, including a third bedroom, an improved bathroom, shower room and utility and better living and working areas, addressing the limitations of the existing layout and significantly improving comfort, functionality, aesthetics and energy performance
Refused Householder Extension 18 docsDomestic -
BRYNAMLWG, OCEAN VIEW, BURRY PORT, SA16 0DW
DEMOLITION OF THE EXISTING CONSERVATORY AND CONSTRUCTION OF A TWO STOREY EXTENSION TO THE REAR OF THE EXISTING PROPERTY
Granted Householder Extension Demolition 8 docsSmall domestic -
Farmers Arms, Burry Port, SA16 0DB
88% historically approved · decision due ~14 Aug
Discharge of Condition 5 on PL/09934 (Ground Investigation Technical Note)
Awaiting decision Conditions 6 docs -
Farmers Arms, Burry Port, SA16 0DB
Variation of Conditions 5, 7 and 8 on PL/09934 (Change of use of redundant public house to offices)
Refused Amendments 6 docs -
Farmers Arms, Burry Port, SA16 0DB
Change of use of redundant public house to offices
Granted Full applications 36 docs
Other full applications
In Carmarthenshire
-
PL/11198 Granted
Towy Retail Park, Old Llangunnor Road, Carmarthen
Installation of solar panels on the building’s low-pitched, barrel-shaped
-
PL/11000 Granted
Pantymaen, Gellywen, Carmarthen, SA33 6DR
Erection of a portal framed agricultural building for cattle housing and associated works
-
PL/10493 Granted
Capel Farm, Carmarthen, SA33 5ED
Construction of concrete silage store and effluent tank built to SSAFO regs and associated works
-
PL/10577 Withdrawn
Bryngwyn, Talley, Llandeilo, SA19 7DQ
Change of use of land for the siting of a static caravan for farm workers accommodation and associated works (retrospective)
-
PL/10989 Granted
Land adjacent to the Tywi Valley Path, Nantgaredig, SA32 7LG
A mobility hub comprising 19 car parking spaces, including for 8 spaces designated for EV charging, cycle parking and associated infrastructure including a canopy over the EV chargers