Skip to content
PlanIndex Get alerts
Menu

Planning application

SITE 8, SOUTH OF BURROWS TERRACE, BURRY PORT, CARMARTHENSHIRE

Granted Carmarthenshire S/33849 Full planning permission

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

TEMPORARY STORAGE OF SOIL FOR A 12 MONTH PERIOD TO BE UTILISED AS PART OF THE ENABLING WORKS IN ASSOCIATION WITH PLANNING PERMISSION S/30600 FOR THE CONSTRUCTION OF A 330 PLACE WELSH MEDIUM PRIMARY SCHOOL WITH ASSOCIATED 45 PLACE NURSERY

As published by the council, reference S/33849

Application record

Reference
S/33849
Type
Full planning permission
Status
Decision Made
Decision
Full Granted
Received
29 Apr 2016
Validated
23 May 2016
Decided
20 Jul 2016
Ward
Burry Port (Historical)
Parish
Pembrey and Burry Port Town
Decision by
Delegated

Site history

Applications at this address on the Carmarthenshire register

This site has had 4 applications since 2014: 4 approved, 0 refused.

  • S/34262 Granted

    SITE 8, SOUTH OF BURROWS TERRACE, BURRY PORT, CARMARTHENSHIRE.

    APPROVAL OF RESERVED MATTERS IS SOUGHT FOR SITE ACCESS AND ANCILLARY ACCESS TO LLANELLI SAND DREDGING LTD, APPEARANCE, SCALE, LAYOUT, LANDSCAPING OF PROPOSED PRIMARY SCHOOL DEVELOPMENT WITH ASSOCIATED INFRASTRUCTURE AND ENABLING WORKS. TOGETHER WITH THE DISCHARGE OF CONDITION NOS. 2, 6,7,11,12,13,15,17,18 AND 22 ATTACHED TO OUTLINE PLANNING PERMISSION S/30600 GRANTED ON THE 25/11/2015

    Decided 18 Nov 2016 Reserved matters
  • S/33890 Granted

    SITE 8, SOUTH OF BURROWS TERRACE, BURRY PORT, CARMARTHENSHIRE

    DISCHARGE OF CONDITION 5 ON S/30600 (ECOLOGICAL MITIGATION ENHANCEMENT AND MONITORING STRATEGY)

    Decided 21 Nov 2016 Conditions
  • S/30600 Granted

    SITE 8, SOUTH OF BURROWS TERRACE, BURRY PORT, CARMARTHENSHIRE

    CONSTRUCTION OF A 330 PLACE WELSH MEDIUM PRIMARY SCHOOL WITH ASSOCIATED 45 PLACE NURSERY

    Decided 25 Nov 2015 Outline

Timeline

Dates from the published record

  1. 29 Apr 2016

    Received by Carmarthenshire

  2. 23 May 2016

    Validated

    Checked as complete and ready for consideration.

  3. 20 Jul 2016

    Decision issued: Full Granted

  4. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Carmarthenshire granted permission on 20 July 2016, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Carmarthenshire

  • PL/11198 Granted

    Towy Retail Park, Old Llangunnor Road, Carmarthen

    Installation of solar panels on the building’s low-pitched, barrel-shaped

    27 Jul 2026 Full applications
  • PL/11000 Granted

    Pantymaen, Gellywen, Carmarthen, SA33 6DR

    Erection of a portal framed agricultural building for cattle housing and associated works

    8 Jun 2026 Full applications
  • PL/10493 Granted

    Capel Farm, Carmarthen, SA33 5ED

    Construction of concrete silage store and effluent tank built to SSAFO regs and associated works

    9 Feb 2026 Full applications
  • PL/10577 Withdrawn

    Bryngwyn, Talley, Llandeilo, SA19 7DQ

    Change of use of land for the siting of a static caravan for farm workers accommodation and associated works (retrospective)

    23 Feb 2026 Full applications
  • PL/10989 Granted

    Land adjacent to the Tywi Valley Path, Nantgaredig, SA32 7LG

    A mobility hub comprising 19 car parking spaces, including for 8 spaces designated for EV charging, cycle parking and associated infrastructure including a canopy over the EV chargers

    5 Jun 2026 Full applications