Planning application
LAND OPPOSITE THE PRIVATE GARAGE 'HARBOUR TYRES AND EXHAUSTS', WEST OF SEAVIEW TERRACE, OFF B4311, BURRY PORT, CARMS
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
PROPOSED ACCESS HARDSTANDING OFF THE B4311 (ASHBURNHAM ROAD). THE ACCESS HARDSTANDING IS TO PROVIDE PERMANENT ACCESS FOR DWR CYMRU WELSH WATER (DCWW) VEHICLES FOR SEWER ASSET MAINTANANCE. THIS WILL INCLUDE COLLAPSIBLE BOLLARDS TO PREVENT THE SITE BEING USED FOR PUBLIC/PRIVATE GARAGE PARKING.THE PROPOSED SEWER ASSET IS A NEW STORM WATER SEWER (DRAINING STORM WATER RUNOFF ONLY) CONVEYING FLOWS FROM THE GORS ROAD/CARWAY STREET CATCHMENT INTO AN EXISTING DRAINAGE PIPE SOUTH OF THE B4311. THE SCHEME IS DESIGNED TO SEPARATE STORM FLOWS FROM THE EXISTING COMBINED SEWER (A SINGLE SEWER ASSET SERVING BOTH FOUL AND STORM FLOWS) AND IN DOING SO RELIEVEING SEWER RELATED FLOODING FOR 8NO. PROPERTIES IN CARWAY STREET, PEMBERTON AVENUE AND GORS ROAD
As published by the council, reference S/27630
Application record
- Reference
- S/27630
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Granted As published: Full Granted
- Received
- 20 Dec 2012
- Validated
- 16 Jan 2013
- Decided
- 26 Apr 2013
- Ward
- Burry Port (Historical)
- Parish
- Pembrey and Burry Port Town
- Decision by
- Delegated
Timeline
Dates from the published record
-
20 Dec 2012
Received by Carmarthenshire
-
16 Jan 2013
Validated
Checked as complete and ready for consideration.
-
26 Apr 2013
Decision issued: Full Granted
-
17 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Carmarthenshire granted permission on 26 April 2013, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Carmarthenshire
-
PL/11180 Refused
Land at Waunhwyad Farm, Glanamman, Ammanford, SA18 2YH
Retention of Workshop
-
PL/10883 Granted
Car Park to the north of Building 14 Parc Dewi Sant, Carmarthen, SA31 3BJ
The proposed development of 6 no. electric vehicle charging point upstands and associated charging infrastructure, electrical cabinet and all associated works
-
PL/10614 Granted
Castle Motors, Station Road, Newcastle Emlyn, SA38 9BX
Proposed erection of a portal frame building adjoining the existing workshop and van sales offices building to form separate storage and distribution units for rental purposes and all associated works
-
PL/11389 Awaiting decision
Ysgubor Mair, Meinciau, Kidwelly, SA17 5LH
Groundworks to form new menage
-
PL/10975 Granted
To the front of Nationwide, 47 Stepney Street, Llanelli, SA15 3QQ
Installation of stand alone frame with defibrillator and bleed kit cabinets for community use, in the vicinity a Nationwide Building Society branch