Planning application
Land adjacent to Silverdene, North Road, Whitland, SA34 0BH
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Construction of two detached dwellings
As published by the council, reference PL/01327
Application record
- Reference
- PL/01327
- Type
- Full planning permission
- Status
- Decision Made
- Decision
- Full Granted
- Received
- 11 Feb 2021
- Validated
- 10 Mar 2021
- Decided
- 18 Jun 2021
- Ward
- Whitland (Historical)
- Parish
- Whitland (Historic)
- Postcode
- SA34 0BH
Site history
Applications at this address on the Carmarthenshire register
This site has had 2 applications since 2021: 2 approved, 0 refused.
-
PL/02292 Granted
Land adjacent to Silverdene, North Road, Whitland, SA34 0BH
Variation of Conditions 3 & 4 on PL/01327 (Landscape Design Scheme & boundary treatments)
Timeline
Dates from the published record
-
11 Feb 2021
Received by Carmarthenshire
-
10 Mar 2021
Validated
Checked as complete and ready for consideration.
-
18 Jun 2021
Decision issued: Full Granted
-
25 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Carmarthenshire granted permission on 18 June 2021, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land adjacent to Silverdene, North Road, Whitland, SA34 0BH
Variation of Conditions 3 & 4 on PL/01327 (Landscape Design Scheme & boundary treatments)
Granted Amendments 6 docs -
LAND AT, THE VICARAGE, NORTH ROAD, WHITLAND, SA34 0BH
ERECTION OF A DWELLING
Granted Outline New dwelling 5 docsDomestic -
Cartref, North Road, Whitland, SA34 0AY
Construction of a new conservatory to the rear of the property
Granted Householder Extension 5 docsSmall domestic -
PLOT BETWEEN THE CEMETERY AND BRYNTEG, NORTH ROAD, WHITLAND, CARMS, SA34 0BH
PROPOSED DWELLING AND DOUBLE GARAGE
Refused Full applications 7 docsDomestic -
LAND AT PLOT BETWEEN THE CEMETERY AND BRYNTEG, NORTH ROAD, WHITLAND, SA34 0BH
PROPOSED DWELLING AND DOUBLE GARAGE
Granted Full applications 10 docsDomestic -
LAND ADJ TO SILVERDENE, NORTH ROAD, WHITLAND, SA34 0BH
NON-MATERIAL AMENDMENT TO W/28042 - MINOR AMENDMENTS TO EXISTING APPROVED PLANS TO BOTH PLOTS 1 & 2, AND AMEND CONDITION 6 TO READ - 'NO DEVELOPMENT SHALL TAKE PLACE, OTHER THAN FOUNDATION WORKS UP TO SLAB LEVEL OF THE DEVELOPMENT HEREBY APPROVED, UNTIL THE TRAFFIC CALMING MEASURES SHOWN ON THE AMENDED PLANS REFERENCE S278-1190 REVISION B SHEET 1 AND S278-1190 REV B SHEET 2, RECEIVED 21 MAY 2013, SHALL BE FULLY IMPLEMENTED'
Granted Amendments 6 docs
Other full applications
In Carmarthenshire
-
PL/11198 Granted
Towy Retail Park, Old Llangunnor Road, Carmarthen
Installation of solar panels on the building’s low-pitched, barrel-shaped
-
PL/11000 Granted
Pantymaen, Gellywen, Carmarthen, SA33 6DR
Erection of a portal framed agricultural building for cattle housing and associated works
-
PL/10493 Granted
Capel Farm, Carmarthen, SA33 5ED
Construction of concrete silage store and effluent tank built to SSAFO regs and associated works
-
PL/10577 Withdrawn
Bryngwyn, Talley, Llandeilo, SA19 7DQ
Change of use of land for the siting of a static caravan for farm workers accommodation and associated works (retrospective)
-
PL/10989 Granted
Land adjacent to the Tywi Valley Path, Nantgaredig, SA32 7LG
A mobility hub comprising 19 car parking spaces, including for 8 spaces designated for EV charging, cycle parking and associated infrastructure including a canopy over the EV chargers