Planning application
4 Capital Quarter Tyndall Street Butetown Cardiff CF10 4BZ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of additional plant at roof level
As published by the council, reference 26/01679/FUL
Application record
- Reference
- 26/01679/FUL
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 6 Aug 2026
- Validated
- 7 Aug 2026
- Ward
- BUTETOWN
- Postcode
- CF10 4BZ
Timeline
Dates from the published record
-
6 Aug 2026
Received by Cardiff
-
7 Aug 2026
Validated
Checked as complete and ready for consideration.
-
13 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Cardiff took a median of 55 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file
1,953 applications on PlanIndex · across 33 councils · 98% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Cardiff for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Unit 1 4 Capital Quarter Tyndall Street Butetown Cardiff CF10 4BZ
Use as flexible Class A1, A2, A3, B1 and/or D1
Granted Full applications 7 docs -
3-7 Columbus Walk Butetown Cardiff CF10 4SD
Change of Use to also allow education provision in addition to the existing office space
Granted Full applications 6 docs -
Unit K Capital Quarter Tyndall Street Butetown Cardiff
Change of use to class D1 Wellbeing Centre.
Granted Full applications 6 docs -
Advertising Hoarding Bus Shelter 1074 Tyndall Street Butetown Cardiff
Replace existing double-sided digital Advertising Unit featuring single digital display and an internally illuminated 6-sheet display with a advertising unit featuring double-sided digital displays.
Granted Advertising 9 docs -
Former Ibis Budget Tyndall Street Butetown Cardiff CF10 4BE
94% historically approved · decision due ~17 Jul
Discharge of Condition 3 (Operational Management Plan) of 25/02406/FUL
Awaiting decision Conditions 4 docs -
Former Ibis Budget Tyndall Street Butetown Cardiff CF10 4BE
91% historically approved · decision due ~12 Dec
Change of Use from 157 bedroom hotel (Class C1) to a residential institution (Class C2) providing 98 bedrooms with communal kitchen, dining and lounge facilities, as temporary supported accommodation for persons who are homeless, for a period of three years.
Awaiting decision Full applications 25 docs
Other full applications applications
In Cardiff
-
26/00351/FUL Granted
202 Cathedral Road Pontcanna Cardiff CF11 9JF
Side dormer roof extension, erection of railings and gate over front boundary walls, replacement of windows in existing openings at the front elevation, further external alterations to other elevations, new canopy alongside elevation, removal of rear & side boundary wall and erection of gate to rear alleyway. Demolition of existing garage and rear lean-to extension.
-
26/01606/FUL Granted
BBC Roath Lock Studios Heol Porth Teigr Butetown Cardiff CF10 4GA
External alterations to existing studio buildings including a new entrance canopy, rooftop set and associated operational development.
-
26/00649/FUL Granted
434 Cowbridge Road East Canton Cardiff CF5 1JN
Rear extensions, side dormer loft conversion, and additional two residential units with other associated works.
-
26/01673/FUL Granted
4 Mackintosh Place Roath Cardiff CF24 4RQ
Alterations to existing shopfront with associated external alterations
-
26/01848/FUL Awaiting decision
Ty Mawr Farm Graig Road Lisvane Cardiff CF14 0UF
Completion of existing, part built stables with change of for part of the completed building for pet crematorium with change of use of existing log cabin to provide reception/chapel of rest