Skip to content
PlanIndex Get alerts
Menu

Planning application

26/00596/DOC

Capitol Centre Queen Street Cardiff CF10 2HQ

Decided Cardiff Discharge of Condition(s)

Proposal

Discharge of Condition 3 (Construction Environmental Management Plan) of 24/01042/FUL.

As published by the council, reference 26/00596/DOC

Timeline

Dates from the published record

  1. 24 Mar 2026

    Received by Cardiff

  2. 22 May 2026

    Decision issued: Full Discharge of Condition

  3. 22 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within five years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • 26/00556/NMA Granted

    Capitol Centre Queen Street Cardiff CF10 2HQ

    Proposed Non-Material Amendment to Planning Permission 24/01042/FUL - 1) Reconfiguration of the approved layout.

    19 Mar 2026 0m away Amendments
  • 25/02024/FUL Awaiting decision

    Unit Nsu7 Capitol Arcade Cathays Cardiff CF10 2HQ

    Change of Use from Class A1 (Retail Shop) to Class D2 (Multipurpose events space).

    2 Sep 2025 39m away Full applications
  • 26/01330/ADV Awaiting decision

    Easygym The Capitol Centre Station Terrace Cathays Cardiff CF10 2HQ

    FASCIA SIGN, GOAL POST SIGN, PROJECTING CUBE, CANOPY SIGN 2NO, WINDOW GRAPHICS

    25 Jun 2026 66m away Advertising
  • 26/01106/VAR Granted

    15 Churchill Way Cathays Cardiff CF10 2HD

    Change of use from shop (use class A1) to office (use class B1). (Approved 20 January 2026- 25/02922/FUL):- Variation of Condition 2 (Approved Plans) of 25/02922/FUL to amend the approved scheme as follows: 1) Revise ground floor and mezzanine layouts; 2) Reconfigure retail floor space, office lounge accommodation and end-of-trip facilities; and 3) Associated Internal Alterations.

    28 May 2026 77m away Amendments
  • 25/02922/FUL Granted

    15 Churchill Way Cathays Cardiff CF10 2HD

    Change of use from shop (use class A1) to office (use class B1)

    12 Dec 2025 77m away Full applications
  • 26/00807/FUL Granted

    15 Churchill Way Cathays Cardiff CF10 2HD

    Development of roof terrace and installation of solar photovoltaics.

    23 Apr 2026 77m away Full applications

In Cardiff

  • 26/01139/DOC Decided

    Merchant Place And Corys Buildings 3 Bute Place And 57 Bute Street Butetown Cardiff CF10 5AD

    Discharge of Condition 6 (Imported Soil) of 24/01422/VAR.

    2 Jun 2026 Conditions
  • 26/01140/DOC Decided

    Merchant Place And Corys Buildings 3 Bute Place And 57 Bute Street Butetown Cardiff CF10 5AD

    Discharge of Condition 7 (Imported Aggregates) of 24/01422/VAR.

    2 Jun 2026 Conditions
  • 26/01077/DOC Decided

    Part Of Land At 22 Brandreth Road Penylan Cardiff CF23 5NW

    Discharge of Condition 14 (Topsoil/Subsoil Investigation Scheme) of 18/01432/MNR

    26 May 2026 Conditions
  • 26/00565/DOC Decided

    Land At Former Youth Hostel 2 Wedal Road Roath Cardiff CF14 3QX

    Discharge of Condition 9 (Sound Insulation Measures) of 22/00820/MJR.

    20 Mar 2026 Conditions
  • 26/00432/DOC Decided

    Parcel M2 Plasdwr North West Cardiff

    Discharge of Conditions 45 (Powerlines, Pylons, and High Pressure Gas Pipes), 48 (Trees), 62 (Archaeology), and 64 (Detailed Foul Drainage Scheme) of 14/02733/MJR in respect of the development of temporary drainage infrastructure to serve Parcel M2.

    3 Mar 2026 Conditions