Planning application
Cardiff Metropolitan University Cyncoed Campus Cyncoed Road Cyncoed Cardiff CF23 6XD
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Installation of Video Assistant Referee (VAR) Infrastructure comprising the construction of 1no. timber kiosk (Video Operations Room) and associated development.
As published by the council, reference 25/01443/FUL
Application record
- Reference
- 25/01443/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Permission Granted
- Received
- 20 Jun 2025
- Validated
- 23 Jun 2025
- Decided
- 12 Aug 2025
- Ward
- CYNCOED
- Decision by
- Delegated to Group Leader
- Postcode
- CF23 6XD
Site history
Applications at this address on the Cardiff register
This site has had 4 applications since 2025: 3 approved, 0 refused.
-
26/01821/FUL Awaiting decision
Cardiff Metropolitan University Cyncoed Campus Cyncoed Road Cyncoed Cardiff CF23 6XD
Installation of PV panels to NIAC building, two Battery Energy Storage Systems (BESS) and associated national grid infrastructure
-
26/00839/VAR Granted
Cardiff Metropolitan University Cyncoed Campus Cyncoed Road Cyncoed Cardiff CF23 6XD
Erection of single storey strength and conditioning facility with associated plant. (Approved 26 June 2023 - 23/00803/FUL):- Variation of Condition 2 (Temporary Structure Time Period) of 23/00803/FUL (as amended by 23/02288/NMA) to amend the approved scheme as follows: 1) Allow the continued use of the temporary structure for a further five years.
-
26/00100/NMA Granted
Cardiff Metropolitan University Cyncoed Campus Cyncoed Road Cyncoed Cardiff CF23 6XD
Proposed Non-Material Amendment to Planning Permission 24/00352/FUL- Amendment to conditions 2 and 3 to reflect updated plans which show the installation of replacement 16m high columns and 28 luminaires.
Timeline
Dates from the published record
-
20 Jun 2025
Received by Cardiff
-
23 Jun 2025
Validated
Checked as complete and ready for consideration.
-
12 Aug 2025
Decision issued: Permission Granted
-
13 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Wardell Armstrong LLP Agent
82 applications on PlanIndex · across 35 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Cardiff granted permission on 12 August 2025, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Cardiff Metropolitan University Cyncoed Campus Cyncoed Road Cyncoed Cardiff CF23 6XD
Erection of single storey strength and conditioning facility with associated plant. (Approved 26 June 2023 - 23/00803/FUL):- Variation of Condition 2 (Temporary Structure Time Period) of 23/00803/FUL (as amended by 23/02288/NMA) to amend the approved scheme as follows: 1) Allow the continued use of the temporary structure for a further five years.
Granted Amendments 7 docsSmall domestic -
Cardiff Metropolitan University Cyncoed Campus Cyncoed Road Cyncoed Cardiff CF23 6XD
90% historically approved · decision due ~5 Nov
Installation of PV panels to NIAC building, two Battery Energy Storage Systems (BESS) and associated national grid infrastructure
Awaiting decision Full applications 8 docs -
Land At Junction Of Circle Way West And Ael-Y-Bryn Llanedeyrn
PROPOSED 5G TELECOMS INSTALLATION: 18M HIGH 'SLIM LINE' PHASE 8 H3G STREET POLE C/W WRAP AROUND CABINET AND 3NO. CABINETS WITH ANCILLARY WORKS
Refused Telecoms Extension 11 docs -
8 Brynderwen Close Cyncoed Cardiff CF23 6BR
Proposed replacement of the existing single storey rear extension, with a new single storey extension occupying the same footprint.
Granted Lawful development Extension 6 docsSmall domestic -
62 Ael-y-bryn Llanedeyrn Cardiff CF23 9LH
Retrospective application for the installation of an automated teller machine
Granted Full applications 13 docs -
62 Ael-y-bryn Llanedeyrn Cardiff CF23 9LH
Retrospective installation of 1no non-illuminated top sign and 1no non-illuminated logo panel
Granted Advertising 13 docs
Other full applications
In Cardiff
-
26/01337/FUL Granted
37 Wyeverne Road Cathays Cardiff CF24 4BG
Extensions and alterations and change of use from dwelling (C3) to House in Multiple Occupation (C4) (HMO).
-
26/01728/FUL Granted
Unit 7b Cardiff Industrial Park Pennine Close Llanishen Cardiff CF14 5DN
Installation of 5 no. external air source heat pump units
-
26/01729/FUL Granted
Unit 7b Cardiff Industrial Park Pennine Close Llanishen Cardiff CF14 5DN
Replacement roller shutter.
-
26/01216/FUL Granted
4 Callaghan Square Butetown Cardiff CF10 5BT
Internal and external alterations to an existing office building at ground floor and part first floor
-
26/02099/FUL Awaiting decision
20 Janet Street Splott Cardiff CF24 2BD
Proposed conversion of dwelling to form two flats