Skip to content
PlanIndex Get alerts
Menu

Planning application

Holiday Inn Merthyr Road Tongwynlais Cardiff CF15 7LD

Granted Cardiff 22/02633/FUL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

First and second floor extension to the existing hotel providing an additional 22 bedrooms and associated reconfiguration of the car-park including the addition of 1 car parking space.

As published by the council, reference 22/02633/FUL

Application record

Reference
22/02633/FUL
Type
Full Planning Permission
Status
Decided
Decision
Permission Granted
Received
4 Nov 2022
Validated
16 Nov 2022
Decided
16 Feb 2023
Ward
WHITCHURCH AND TONGWYNLAIS
Decision by
Delegated Decision
Postcode
CF15 7LD

Timeline

Dates from the published record

  1. 4 Nov 2022

    Received by Cardiff

  2. 16 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 16 Feb 2023

    Decision issued: Permission Granted

  4. 13 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Farnham

430 applications on PlanIndex · across 90 councils · 96% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

37 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Cardiff

  • 26/00351/FUL Granted

    202 Cathedral Road Pontcanna Cardiff CF11 9JF

    Side dormer roof extension, erection of railings and gate over front boundary walls, replacement of windows in existing openings at the front elevation, further external alterations to other elevations, new canopy alongside elevation, removal of rear & side boundary wall and erection of gate to rear alleyway. Demolition of existing garage and rear lean-to extension.

    19 Feb 2026 Full applications
  • 26/00649/FUL Granted

    434 Cowbridge Road East Canton Cardiff CF5 1JN

    Rear extensions, side dormer loft conversion, and additional two residential units with other associated works.

    30 Mar 2026 Full applications
  • 26/01673/FUL Granted

    4 Mackintosh Place Roath Cardiff CF24 4RQ

    Alterations to existing shopfront with associated external alterations

    5 Aug 2026 Full applications
  • 26/01831/FUL Awaiting decision

    Unit 23B Ely Distribution Centre Argyle Way Caerau Cardiff CF5 5NP

    CHANGE OF USE OF EXISTING INDUSTRIAL UNIT TO MOT TESTING STATION AND MOTOR VEHICLE REPAIR WORKSHOP

    28 Aug 2026 Full applications
  • 26/01704/FUL Withdrawn

    Ysgol Gynradd Groes-wen Primary School Rhodfa Plasdwr St Fagans Cardiff Cardiff CF5 2FG

    Development of a green corridor, including childrens play area and kick about area with associated hard and soft landscaping, drainage, engineering and infrastructure works.

    11 Aug 2026 Full applications