Skip to content
PlanIndex Get alerts
Menu

Planning application

23 Eyre Street Splott Cardiff CF24 2JS

Granted Cardiff 21/01292/MNR Full Planning Permission

Works: New dwelling Extension Loft or dormer

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

CHANGE OF USE FROM A 3 BED HOUSE, INTO 3 X 1 BED FLATS. INCLUDING A SINGLE STORY REAR EXTENSION, AND REAR DORMER/LOFT CONVERSION

As published by the council, reference 21/01292/MNR

Application record

Reference
21/01292/MNR
Type
Full Planning Permission
Status
Decided
Decision
Permission Granted
Received
20 May 2021
Validated
20 May 2021
Decided
25 Jun 2021
Ward
SPLOTT
Decision by
Delegated Decision
Postcode
CF24 2JS

Timeline

Dates from the published record

  1. 20 May 2021

    Received by Cardiff

  2. 25 Jun 2021

    Decision issued: Permission Granted

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within five years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 106 Railway Street Splott Cardiff CF24 2NF

    22/02527/HSE Submitted 25 Oct 2022 136m away

    Single storey rear extension and associated alterations

    Granted Householder Extension 15 docs
    Small domestic
  • 108B Railway Street Splott Cardiff CF24 2NF

    24/00894/FUL Submitted 17 Apr 2024 137m away

    The conversion of existing dilapidated garage into a habitable space designed for one bedroom, en suite and additional kitchen/dining space. External alterations to the property.

    Granted Full applications 16 docs
  • 32 Splott Road Splott Cardiff CF24 2DA

    26/01573/FUL Submitted 27 Jul 2026 179m away

    91% historically approved · decision due ~21 Sep

    Change of Use of the Existing Building to a Community Office and Teaching Facility, Construction of a Single-Storey Rear Extension and Associated External Alterations.

    Awaiting decision Full applications Extension 10 docs
    Small domestic
  • 32 Splott Road Splott Cardiff CF24 2DA

    26/00803/FUL Submitted 22 Apr 2026 179m away

    Single Storey Rear Extension and Associated External Alterations

    Withdrawn Full applications Extension 8 docs
    Small domestic
  • 20 Splott Road Splott Cardiff CF24 2BZ

    26/01445/FUL Submitted 10 Jul 2026 180m away

    Change of Use of Ground Floor Retail Unit (Class A1) to a Self-Service Launderette (Sui Generis) and Installation of New Shopfront and Flue

    Granted Full applications Windows or glazing 17 docs
  • Land Outside The Cardiff And Vale Therapy Centre Splott Road Splott Cardiff CF24 2BZ

    26/00888/PRAP Submitted 5 May 2026 186m away

    Installation of 17.5m monopole, 6 no. antennas, 2 no. transmission dishes, 2 no. equipment cabinets and ancillary development thereto.

    Refused Prior approval 13 docs

In Cardiff

  • 26/00351/FUL Granted

    202 Cathedral Road Pontcanna Cardiff CF11 9JF

    Side dormer roof extension, erection of railings and gate over front boundary walls, replacement of windows in existing openings at the front elevation, further external alterations to other elevations, new canopy alongside elevation, removal of rear & side boundary wall and erection of gate to rear alleyway. Demolition of existing garage and rear lean-to extension.

    19 Feb 2026 Full applications
  • 26/00649/FUL Granted

    434 Cowbridge Road East Canton Cardiff CF5 1JN

    Rear extensions, side dormer loft conversion, and additional two residential units with other associated works.

    30 Mar 2026 Full applications
  • 26/01673/FUL Granted

    4 Mackintosh Place Roath Cardiff CF24 4RQ

    Alterations to existing shopfront with associated external alterations

    5 Aug 2026 Full applications
  • 26/01831/FUL Awaiting decision

    Unit 23B Ely Distribution Centre Argyle Way Caerau Cardiff CF5 5NP

    CHANGE OF USE OF EXISTING INDUSTRIAL UNIT TO MOT TESTING STATION AND MOTOR VEHICLE REPAIR WORKSHOP

    28 Aug 2026 Full applications
  • 26/01704/FUL Withdrawn

    Ysgol Gynradd Groes-wen Primary School Rhodfa Plasdwr St Fagans Cardiff Cardiff CF5 2FG

    Development of a green corridor, including childrens play area and kick about area with associated hard and soft landscaping, drainage, engineering and infrastructure works.

    11 Aug 2026 Full applications