Planning application
Blacksole Farm Margate Road North Of Thanet Way Herne Bay Kent
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 67 dwellings with associated open space, parking, amenity and vehicular access
As published by the council, reference CA/22/02513
Application record
- Reference
- CA/22/02513
- Type
- Full Application
- Status
- Decided
- Decision
- GRANTED
- Received
- 28 Nov 2022
- Validated
- 28 Nov 2022
- Decided
- 21 Apr 2023
- Ward
- Beltinge
- Decision by
- Committee
- Postcode
- CT6 6LA
Timeline
Dates from the published record
-
28 Nov 2022
Received by Canterbury
-
21 Apr 2023
Decision issued: GRANTED
-
22 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Cobham
506 applications on PlanIndex · across 114 councils · 97% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
106 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Blacksole Farm Margate Road North Of Thanet Way Herne Bay Kent
Details submitted pursuant to condition 25 (materials) of planning permission CA/22/02513/FUL
Granted Full applications 5 docs -
Margate Road Herne Bay Kent CT6 6LA
97% historically approved · decision due ~22 May
Installation of two internally illuminated aluminium freestanding totem signs.
Awaiting decision Advertising 15 docs -
Margate Road Herne Bay Kent CT6 6LA
97% historically approved · decision due ~22 May
Installation of 2no. white acrylic internally illuminated fascia signs.
Awaiting decision Advertising 14 docs -
Herne Bay Table Table The Boulevard Herne Bay Kent CT6 6GZ
96% historically approved · decision due ~20 Mar
Proposed alterations to fenestrations at ground and first floor levels of existing restaurant; replacement cladding; installation of new and replacement plant to first floor flat roof; erection of rear refuse service enclosure following demolition of existing single storey rear extension; alterations to parking, landscaping and boundary treatments.
Awaiting decision Full applications Extension Demolition 112 docsSmall domestic -
Unit 1 And 2 The Boulevard Herne Bay Kent CT6 6LA
97% historically approved · decision due ~28 Oct
Application for lawful development certificate for existing use as MOT testing centre.
Awaiting decision -
14 Reculver Road Herne Bay Kent CT6 6LD
Single-storey detached outbuilding.
Granted Full applications 6 docsSmall domestic
Other full applications applications
In Canterbury
-
CA/26/00870 Granted
Kingdom Hall Of Jehovahs Witnesses Albert Street Whitstable Kent CT5 1HT
Details submitted pursuant to conditions 6 (materials), 7 (external facade), 9 (brickwork) and 21 (biodiversity) of appeal decision APP/J2210/W 25/3374628.
-
CA/25/01543 Granted
Land At Altira Park Herne Bay Kent
Details submitted pursuant to condition 12 (travel plan) of planning permission CA/24/00631/FUL.
-
CA/26/00660 Granted
Rose End St John's Road Whitstable Kent CT5 2QT
Single-storey rear extension.
-
CA/26/00348 Granted
43 High Street Herne Bay Kent CT6 5LN
Replacement of windows from steel to uPVC together with door from timber to composite at front elevation and door from steel to uPVC at first-floor side elevation.
-
CA/25/01355 Granted
16 Singer Avenue Herne Bay Kent CT6 8ED
Single-storey dwelling and single-storey detached annexe following demolition of single-storey dwelling.