Planning application
Flat 18 Hillfield Mansions Haverstock Hill London NW3 4QR
Works: Loft or dormer Windows or glazing
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of enlarged rear dormer window and repositioning of existing rooflight, following removal of existing circular dormer and vent.
As published by the council, reference 2026/3255/P
Application record
- Reference
- 2026/3255/P
- Type
- Full Planning Permission
- Status
- Registered
- Received
- 30 Jul 2026
- Validated
- 4 Aug 2026
- Ward
- Belsize
- Postcode
- NW3 4QR
Timeline
Dates from the published record
-
30 Jul 2026
Received by Camden
-
4 Aug 2026
Validated
Checked as complete and ready for consideration.
-
9 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 29 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Camden took a median of 42 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Camden for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
211 Haverstock Hill London NW3 4QG
Display of 1x facia sign with projecting, backlit lettering; 1x externally illuminated hanging sign; replacement awning and window vinyl displays.
Granted Windows or glazing -
205-207 Haverstock Hill London NW3 4QG
Retention of 2 x Air Condenser Units located to rear of property for ground floor resteraunt.
Granted Full applications -
205-207 Haverstock Hill London NW3 4QG
Installation of internally illuminated powder coated aluminium fascia sign and retractable awning signs at existing restaurant (Class A3).
Granted -
205-207 Haverstock Hill London NW3 4QG
Alterations to replace existing shopfront, including the installation of new retractable awnings to existing restaurant (Class A3).
Granted Full applications Windows or glazing -
205-207 Haverstock Hill London Camden NW3 4QG
Display of 1x halo illuminated fascia sign, 1x externally illuminated projecting sign and 2 x branded awnings.
Granted -
Rear of 205-207 Haverstock Hill London NW3 4QG
Ventilation duct at rear of property for use as extraction for ground floor restaurant.
Granted Full applications
Other full applications applications
In Camden
-
2026/2516/P Withdrawn
31 Loveridge Road London Camden NW6 2DU
Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.
-
2026/3830/P Awaiting decision
Euston Tower 286 Euston Road London NW1 3DP
Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.
-
2026/3282/P Granted
5 Berkley Road London NW1 8XX
Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)
-
2026/0483/P Granted
100 Avenue Road London NW3 3HF
Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”
-
2026/2697/P Awaiting decision
Flat 1, 73 Eton Avenue London NW3 3EU
Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.