The Courtyard Building 1 Alfred Place London WC1E 7EB

Granted Camden 2026/0301/P Non Material Amendments

Works: Extension

Relates to 2024/4840/P

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Non-material amendments to planning permission ref. 2024/4840/P dated 20 August 2025 for commercial refurbishment and extension of the building, to secure minor internal layout, plant, riser and fire-strategy amendments, and minor external elevation amendments.

As published by the council, reference 2026/0301/P

Application record

Reference
2026/0301/P
Type
Non Material Amendments
Status
Final Decision
Decision
Granted
Received
26 Jan 2026
Validated
28 Jan 2026
Decided
20 Mar 2026
Ward
Bloomsbury
Decision by
Delegated
Postcode
WC1E 7EB

Site history

Applications at this address on the Camden register

This site has had 13 applications since 2025: 11 approved, 0 refused.

  • 2026/3352/P Awaiting decision

    The Courtyard Building 1 Alfred Place London WC1E 7EB

    Non-material amendments to planning permission ref. 2024/4840/P dated 20 August 2025 for commercial refurbishment and extension of the building, to amend the wording of Condition 15 (Green Roof Details) to correct a discrepancy between the figures set out in the decision notice and those contained within the approved Urban Greening Factor Report.

    Submitted 6 Aug 2026 Amendments
  • 2026/3179/P Granted

    The Courtyard Building 1 Alfred Place London WC1E 7EB

    Details of brick materials as required by condition 3(c) (brick details only) of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Decided 25 Aug 2026 Full applications
  • 2026/0818/P Awaiting decision

    The Courtyard Building, 1 Alfred Place London WC1E 7EB

    Details as required by condition 6 (Crossrail 2 design and construction method statement) and condition 23b (London Underground safeguarding - detailed design and method statements) of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Submitted 2 Mar 2026 Full applications
  • 2026/0823/P Granted

    The Courtyard Building, 1 Alfred Place London WC1E 7EB

    Details of sustainable drainage required by condition 17 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Decided 21 Apr 2026 Full applications
  • 2025/5369/P Granted

    The Courtyard Building 1 Alfred Place London WC1E 7EB

    Details of finishing materials required by condition 3 (all parts) of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Decided 29 Apr 2026 Full applications
  • 2025/5370/P Granted

    The Courtyard Building 1 Alfred Place London WC1E 7EB

    Details of landscaping required by condition 13 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Decided 4 Feb 2026 Full applications
  • 2025/4036/P Granted

    The Courtyard Building 1 Alfred Place London WC1E 7EB

    Details of solar photovoltaics feasbility study required by condition 19 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Decided 13 Mar 2026 Full applications
  • 2025/3911/P Granted

    The Courtyard Building 1 Alfred Place London WC1E 7EB

    Details of rainwater recycling required by condition 20 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Decided 31 Oct 2025 Full applications
  • 2025/3905/P Granted

    The Courtyard Building 1 Alfred Place London WC1E 7EB

    Details of demolition and construction waste management required by condition 18 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Decided 31 Oct 2025 Full applications
  • 2025/3904/P Granted

    The Courtyard Building 1 Alfred Place London WC1E 7EB

    Details of air quality monitoring required by condition 9 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Decided 13 Oct 2025 Full applications

Timeline

Dates from the published record

  1. 26 Jan 2026

    Received by Camden

  2. 28 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 20 Mar 2026

    Decision issued: Granted

  4. 9 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2024/4840/P Granted

    The Courtyard 1-7 Alfred Place, 22 Store Street and 220-226 Tottenham Court Road London WC1E 7EB

    Refurbishment and extension of the building to provide commercial, business and service use (Class E) including infill extension, roof extension and replacement facades to Alfred Place, reconfiguration of entrances and servicing arrangements, rooftop plant equipment, PV panels, new landscaping, provision of cycle parking and other ancillary works.

    Decided 20 Aug 2025 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Camden granted permission on 20 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • The Courtyard Building 1 Alfred Place London WC1E 7EB

    2025/4036/P Submitted 12 Sep 2025 0m away

    Details of solar photovoltaics feasbility study required by condition 19 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Granted Full applications Extension 4 docs
  • The Courtyard Building, 1 Alfred Place London WC1E 7EB

    2026/0818/P Submitted 2 Mar 2026 0m away

    91% historically approved · decision due ~30 Apr

    Details as required by condition 6 (Crossrail 2 design and construction method statement) and condition 23b (London Underground safeguarding - detailed design and method statements) of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Awaiting decision Full applications Extension 13 docs
  • The Courtyard Building 1 Alfred Place London WC1E 7EB

    2026/3179/P Submitted 28 Jul 2026 0m away

    Details of brick materials as required by condition 3(c) (brick details only) of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Granted Full applications Extension 6 docs
  • The Courtyard Building, 1 Alfred Place London WC1E 7EB

    2026/0823/P Submitted 2 Mar 2026 0m away

    Details of sustainable drainage required by condition 17 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Granted Full applications Extension 3 docs
  • The Courtyard Building 1 Alfred Place London WC1E 7EB

    2025/3911/P Submitted 5 Sep 2025 0m away

    Details of rainwater recycling required by condition 20 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Granted Full applications Extension 4 docs
  • The Courtyard Building 1 Alfred Place London WC1E 7EB

    2025/3905/P Submitted 5 Sep 2025 0m away

    Details of demolition and construction waste management required by condition 18 of planning permission 2024/4840/P dated 20/8/2025 for refurbishment and extension of the host building.

    Granted Full applications Extension Demolition 5 docs

In Camden

  • 2026/3509/P Awaiting decision

    Flat A 55 Leverton Street London NW5 2NX

    Non-material amendment to planning permission 2026/0413/P dated 12/05/2026 (Erection of a single storey side and rear extension, re-construction of rear garden boundary wall, replacement of a ground floor rear window with an access door, replacement of a side door with a window, insertion of two rooflights and reinstatement of front sash windows), namely to reduce the depth of the side element of the approved extension.

    4 Sep 2026 Amendments
  • 2026/2540/P Granted

    50-51 Russell Square London WC1B 4JP

    Non-material amendment to planning permission ref. 2023/5470/P (dated 13/03/2025) for: Deep refurbishment of existing building including new facades; erection of replacement roof extension with terrace to rear; reopening of lightwell to front and reconfiguration of entrance area; demolition of two storey outrigger and replacement with three storeys plus plant enclosure; single storey rear infill extension to existing car park with terrace above; erection of full height stair rear core extension. NAMELY for alterations to the front lightwell, ground floor entrances, fifth floor fenestration, plant enclosure, and rear terrace.

    18 Jun 2026 Amendments
  • 2026/3341/P Granted

    Flat A 71 Fitzjohn's Avenue London NW3 6PD

    Non-material amendment to planning permission 2025/2351/P dated 30/07/2025 (Various external works including refurbishment and alterations to rear elevation fenestration and entrance door, replacement of existing single glazed windows with double glazed windows and alterations to side elevation fenestration, and re-landscaping works to rear garden), namely to alter the design of the rear doors and replace an existing timber louvre with brickwork to side elevation.

    6 Aug 2026 Amendments
  • 2026/3097/P Awaiting decision

    7 Belsize Park Gardens London NW3 4LB

    Non-material amendment to planning permission ref. 2025/5424/P dated 06/05/2026 for 'front alterations including reduction of length of metal railings and widening of opening for access to bins, installation of tiling to new entrance steps, installation of door to storage area & handrail to Flat A, and alterations to side boundary doorway', namely, to change the material for the new entrance steps and front paving.

    3 Sep 2026 Amendments
  • 2026/2606/P Granted

    Chester Road Hostel 2 Chester Road London N19 5BP

    Non-material amendments to planning permission 2020/3461/P dated 11/05/2021 (for: Redevelopment of the site to include demolition of existing hostel building and the erection of a new hostel building (sui generis) formed of 3 x part 3, part 4 storey blocks with 2 x external stairwells arranged around a central courtyard. Associated works include installation of plant equipment, access arrangements and tree and landscaping works) NAMELY re-design and re-positioning of the boundary treatment near the site entrance and erection of retaining wall and balustrade in connection with revisions to ramp access to bin store

    22 Jun 2026 Amendments