Planning application
Centre for the Magic Arts 12 Stephenson Way London NW1 2HD
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of an end wall to the eastern facade; minor alteration to the north facade with partial render and roof cornice.
As published by the council, reference 2025/5474/HS2
Application record
- Reference
- 2025/5474/HS2
- Type
- Schedule 17 - Conditions of Deemed Planning Permission
- Status
- Final Decision
- Decision
- Approval
- Received
- 2 Dec 2025
- Validated
- 3 Dec 2025
- Decided
- 27 Jan 2026
- Ward
- Regents Park
- Decision by
- Delegated
- Postcode
- NW1 2HD
Timeline
Dates from the published record
-
2 Dec 2025
Received by Camden
-
3 Dec 2025
Validated
Checked as complete and ready for consideration.
-
27 Jan 2026
Decision issued: Approval
-
9 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
17 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Camden granted permission on 27 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Site of the Replacement London Underground Traction Substation and Vent Shaft Building
94% historically approved
Amendment to condition 3 (Details of an external lighting strategy) of Schedule 17 consent 2019/0162/HS2 dated 14/08/2019 (as amended by 2021/3798/HS2 dated 9/09/2021) for Submission under Schedule 17 of High Speed Rail (London - West Midlands) Act 2017 for plans and specifications for the erection of the replacement London Underground Traction Substation and Vent Shaft, to amend the trigger for approval of the external lighting strategy.
Awaiting decision -
Wolfson House 2-10 Stephenson Way NW1 2HE
94% historically approved
Bringing into Use of replacement London Underground Traction Substation and Vent Shaft as specified in Scheduled Work No. 1/1 of the High Speed Rail (London to West Midlands) Act 2017.
Awaiting decision -
Wolfson House 2-10 Stephenson Way NW1 2HE
94% historically approved
Scheme of Mitigation (Painting) for replacement London Underground Traction Substation and Vent Shaft as specified in Scheduled Work No. 1/1 of the High Speed Rail (London to West Midlands) Act 2017.
Awaiting decision -
18 Stephenson Way London NW1 2HD
Display of non-illuminated projecting sign to front elevation.
Granted -
18 Stephenson Way London NW1 2HD
Erection of roof extension at fourth floor level with plant enclosure at roof level and associated alterations to include new front entrance and the enlargement of 2 x existing windows to front elevation, replacement of windows to north and south elevations and creation of new rear entrance in connection with offices (Class B1).
Granted Full applications Extension Windows or glazing -
The Royal College of Opthamologists 18 Stephenson Way London NW1 2HD
Discharge of condition 5 (acoustic assessment) and condition 6 (acoustic isolation of plant/equipment) granted under reference 2013/0666/P dated 05/04/13.
Granted Full applications
Other condition discharge and variation applications
In Camden
-
2025/5635/HS2 Granted
Park Village East NW1 2DU
Reinstatement of parts of the Park Village East Parapet wall and Planter wall, between Granby Terrace Bridge in the south, and the location for the Euston Cavern Shaft Headhouse and Compound in the north.
-
2025/5472/HS2 Granted
Royal College of General Practitioners 30 Euston Square London NW1 2FB
Erection of two end walls to the north facing gable end facades.
-
2024/1945/HS2 Granted
Park Village East NW1 2DU
Non-material amendment to Schedule 17 - Conditions of Deemed Planning Permission Approval 2023/4585/HS2 dated 19/12/2023 (which itself amended 2021/0126/HS2, dated 17/03/2021) for; installation of Wall Berm and Upstand Support Strucure to structurally support the existing Park Village East retaining wall. The berm will be located in the railway cutting, adjacent to the existing Park Village East retaining wall and extending from Euston Scissor Box (open section) to Parkway Tunnel; and the installation of Euston Scissor Box (open section) - structurally supporting the portal between the Euston Tunnels and Scissor Cut, located within the railway cutting bound by Mornington Street and Granby terrace Bridge and forming part of the portal for the new HS2 tunnels.
-
2024/1734/HS2 Granted
Land to the North of Exmouth Arms, fronting Coburg Street 1 Starcross Street London NW1 2HR
Construction of a UKPN Substation building comprising two permanent transformers and a Transition Field Upgrade (TFU) unit, with a masonry facade finish fronting Coburg Street.
-
2024/0309/HS2 Granted
Hampstead Road Bridge
Construction of an extension to the existing Hampstead Road Bridge comprising a bridge structure with parapets; associated earthworks