Planning application
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
Relates to 2024/4292/P
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Amendments to planning permission ref 2024/4292/P dated 17/01/2025 (for: Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works) NAMELY, increase in height of canopies and wifi access points
As published by the council, reference 2025/5064/P
Application record
- Reference
- 2025/5064/P
- Type
- Non Material Amendments
- Status
- Final Decision
- Decision
- Granted
- Received
- 10 Nov 2025
- Validated
- 10 Nov 2025
- Decided
- 12 Dec 2025
- Ward
- Bloomsbury
- Decision by
- Delegated
- Postcode
- WC1H 0AJ
Site history
Applications at this address on the Camden register
This site has had 6 applications since 2025: 4 approved, 0 refused.
-
2026/0718/P Granted
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
Installation of artwork on the facade of the Christopher Ingold Building
-
2025/3316/P Granted
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
Details of columns and paving slabs (Condition 6) of planning permission 2024/4292/P dated 17/01/2025 (for:Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works)
-
2024/4292/P Granted
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works
-
2025/2955/P Awaiting decision
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
Details submitted in relation to condition 3 (blue/green roof) of approved application 2024/4292/P dated 17th January 2025 (for: Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works).
-
2025/2956/P Awaiting decision
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
Details submitted in relation to condition 4 (green wall) of approved application 2024/4292/P dated 17th January 2025 (for: Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works).
Timeline
Dates from the published record
-
10 Nov 2025
Received by Camden
-
12 Dec 2025
Decision issued: Granted
-
9 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
2024/4292/P Granted
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works
Documents
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Camden granted permission on 12 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works
Granted Full applications -
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
92% historically approved
Details submitted in relation to condition 3 (blue/green roof) of approved application 2024/4292/P dated 17th January 2025 (for: Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works).
Awaiting decision Full applications -
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
92% historically approved
Details submitted in relation to condition 4 (green wall) of approved application 2024/4292/P dated 17th January 2025 (for: Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works).
Awaiting decision Full applications -
UCL Christopher Ingold Building 20 Gordon Street London WC1H 0AJ
Erection of an external staircase at roof level (levels 4-6) and the creation of an external door on level 6.
Granted Full applications -
UCL New Chemistry Building 20 Gordon Street London WC1H 0AJ
Details of columns and paving slabs (Condition 6) of planning permission 2024/4292/P dated 17/01/2025 (for:Installation of a green wall on the facade of the Christopher Ingold Building and installation of canopy structures with a green roof and associated works)
Granted Full applications -
Christopher Ingold Building 20 Gordon Street London WC1H 0AJ
Installation of external plant equipment (1x AHU; 10x condensers; associated piping) and external alterations to rear of university building (D1) at ground and lower ground floor levels to facilitate refurbishment of chemistry labs
Granted Full applications 15 docs
Other amendment applications
In Camden
-
2026/1139/P Granted
25 John Street London WC1N 2BS
Alterations to design of conservatory, windows and doors approved under planning permission 2024/0312/P dated 06/08/2024.
-
2026/4266/P Awaiting decision
Unit 3A Camden Wharf London 28 Jamestown Road NW1 7BY
Variation of the planning permission dated 15.3.1999 (Registered No PE9700702R3) for the redevelopment of the eastern part of the site by the erection of a four-storey building for mixed A1, A3 and B1 and the retention of the lock-keepers cottage as a Canal Information Centre with ancillary retail/ cafe comprising alterations to the elevations, fenestration, shopfront, balustrading, terraces, roof plant and the omission of the approved canopy over the pedestrian area as well as the discharging of part of condition 1 of the said planning permission relating to approval of details of balustrades, shopfronts, the canopy attached to the commercial building and any structure related to it.
-
2026/3366/P Granted
Flat Lower Ground Floor 133 King Henry's Road London NW3 3RD
Variation of condition 2 (approved plans) of planning permission 2025/1032/P dated 23/04/2025 (which amended 2023/5117/P dated 22/03/2024 (for: Erection of single storey rear extension at lower ground floor, new windows to front and side elevations and new front door) NAMELY, changes to front elevation window and materials
-
2026/4223/P Awaiting decision
6 Conybeare London NW3 3SD
Variation of Condition 2 (approved plans) of planning permission ref. 2022/2870/P, dated 13/12/2022, for the erection of a single-storey roof extension and internal roof terrace to the front part of the building, namely to regularise amendments to the approved scheme.
-
2026/4045/P Granted
234 - 240 Grafton Road London NW5 4NS
Non-material amendment to planning permission 2024/4574/P granted 21/01/2026 for 'Erection of mansard roof extension to accommodate 1 x one bedroom and 1 x two bedroom dwellings; erection of a part one part two storey semi-detached one bedroom dwelling within rear garden to Dale Road; new cycle storage within rear garden, installation of 1 x ASHP in rear garden and 2 x ASHP on mansard roof of terrace, alterations to front boundary treatment.' namely to amend windows on the rear elevation of the existing building.