Planning application

2025/1624/HS2

28 Park Village East London NW1 7PZ

Granted Camden

Proposal

Heritage Agreement Method Statement for installation of equipment for monitoring and conservation management of ground movements due to below ground construction of HS2 railway north of Euston Station.

As published by the council, reference 2025/1624/HS2

Timeline

Dates from the published record

  1. 19 Jun 2025

    Decision issued: Approval

  2. 22 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About this record

Reading the register

This page mirrors an entry on the statutory planning register that Camden is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.

Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.

Nearby applications

Within 500 metres

  • 2021/2850/L Granted

    28 Park Village East London NW1 7PZ

    Installation of temporary internal secondary glazing to six windows at the basement, ground floor, and first-floor levels of the building for noise mitigation works during construction of the HS2 railway.

    6 Aug 2021 0m away Heritage and listed buildings
  • 2026/1942/L Granted

    28 Park Village East London NW1 7PZ

    Installation of 5 solar panels to the roof of the main building and 5 solar panels on the roof of the outbuilding with associated cabling and battery.

    13 Mar 2026 0m away Heritage and listed buildings
  • 2026/1016/P Granted

    28 Park Village East London NW1 7PZ

    Installation of 5 solar panels to the roof of the main building and 5 solar panels on the roof of the outbuilding with associated cabling and battery.

    13 Mar 2026 0m away Householder
  • 2024/0101/T Granted

    28 Park Village East London NW1 7PZ

    REAR GARDEN: Trees overhanging barracks (G1) - Prune back all trees and vegetation over hanging barracks to clear security fence by removing laterals and or sub-laterals to appropriate growth points to create a 0.5m clearance.

    13 Feb 2024 0m away Trees
  • 2019/2204/P Granted

    28 Park Village East London NW1 7PZ

    Installation of external secondary glazing to four windows on the east elevation and one window on the north elevation.

    30 Jul 2019 0m away Full applications
  • 2011/6095/L Granted

    28 Park Village East London England NW1 7PZ

    Internal alterations including removal and replacement of dining room fireplace surround and mantelpiece, hearth and slips.

    7 Feb 2012 0m away Heritage and listed buildings