Proposal
Installation of 1no. air-conditioning unit at roof level..
As published by the council, reference 2025/1376/P
Timeline
Dates from the published record
-
25 Jul 2025
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2025/1796/L Granted
53 Gordon Square London WC1H 0PD
Installation of air-conditioning unit at roof level and associated internal alteration including; new services within roof space and ceiling grilles; removal of internal partitions and doors; removing current kitchen and bathroom fittings and installing replacements; renewal of finishes throughout; reinstatement of a chimneypiece; new lighting and sockets and associated works all at fourth floor level.
-
2025/1156/L Granted
53 Gordon Square London WC1H 0PD
Discharge of condition 4b of listed consent application 2024/4483/L regarding door architraves and mouldings.
-
2025/1138/L Granted
53 Gordon Square London Camden WC1H 0PD
Discharge of condition 4 of listed buildings consent application 2024/4483/L regarding fireplaces.
-
2012/2151/P Withdrawn
53 Gordon Square London WC1H 0PD
Installation of an external ramp and steps with balustrade to provide an accessible entrance to building in education use (Class D1).
-
2025/4229/L Awaiting decision
53 Gordon Square London Camden WC1H 0PD
Discharge of condition 4 of listed building consent application 2025/1796/L relating to joinery details.
-
2024/4483/L Granted
53 Gordon Square & 45 Tavistock Square London WC1H 0PD
The reconfiguration of internal spaces comprising: Removal of partition walls; construction of new partition walls; installation of platform lift and refurbishment of toilets.
Other full applications applications
In Camden
-
2026/0743/P Granted
34-42 Middlesex House Cleveland Street London W1T 4JE
Details pursuant to Condition 6 (Living Roof) of planning permission 2024/2020/P granted on 12/09/2024 "(Minor refurbishment and rooftop works including: upgraded entrance and reception area; new cycle storage and associated end of trip facilities; new/replaced rooftop plant and plant enclosures; creation of a rooftop amenity area with pavilion structure; hard and soft rooftop landscaping; and all associated and ancillary works)."
-
2026/3202/P Awaiting decision
Flat 1 94 Goldhurst Terrace London NW6 3HS
Erection of a single storey rear extension.
-
2026/0335/P Granted
216A West End Lane London NW6 1UX
Conversion of 1 x 7 bedroom flat (C3) and 1 x 2 bedroom flat (C3) to 1 x 7 bedroom House in Multiple Occupation (Sui-generis) and 1 x 1 bedroom flat (C3) and installation of four rooflights
-
2026/3229/P Awaiting decision
52 Neal Street London WC2H 9PA
Alterations to the shopfront and installation of awnings.
-
2026/2160/P Granted
120 College Place London NW1 0DJ
Erection of a rear roof extension, formation of a rear roof terrace and installation of 2x rooflights to front roof slope, and associated works.