Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Museum Street London WC1A 1JR

Granted Camden 2024/5747/P Full applications

Works: Demolition

Relates to 2023/2510/P

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details to discharge Condition 43 (Rainwater Greywater) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

As published by the council, reference 2024/5747/P

Application record

Reference
2024/5747/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
16 Jun 2025
Postcode
WC1A 1JR

Site history

Applications at this address on the Camden register

This site has had 8 applications since 2024: 8 approved, 0 refused.

  • 2024/5745/P Granted

    1 Museum Street London WC1A 1JR

    Details to discharge Condition 28 (Piling) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Decided 15 Jul 2025 Full applications
  • 2024/5746/P Granted

    1 Museum Street London WC1A 1JR

    Details to discharge Condition 40 (Waste Water Heat) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Decided 16 Jun 2025 Full applications
  • 2024/5374/P Granted

    1 Museum Street London WC1A 1JR

    Details to discharge Condition 39 (Circular Economy Statement) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Decided 22 May 2025 Full applications
  • 2025/0560/P Granted

    1 Museum Street London WC1A 1JR

    Details to discharge Condition 45, part 3 (Air Quality Baseline Monitoring Report) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Decided 5 Mar 2025 Full applications
  • 2024/5676/P Granted

    1 Museum Street London WC1A 1JR

    Details to discharge Condition 12 (Suitable Qualified Engineer) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Decided 5 Feb 2025 Full applications
  • 2024/5282/P Granted

    1 Museum Street London WC1A 1JR

    Details to part discharge Condition 23 (Arboricultural Method Statement) - pre-demolition, of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Decided 3 Jan 2025 Full applications
  • 2024/4505/P Granted

    1 Museum Street London WC1A 1JR

    Details to discharge Condition 45 part 1 (Air Quality Monitoring Implementation) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Decided 22 Nov 2024 Full applications

Timeline

Dates from the published record

  1. 16 Jun 2025

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2023/2510/P Granted

    Selkirk House, 166 High Holborn, 1 Museum Street, 10-12 Museum Street, 35-41 New Oxford Street and 16A-18 West Central Street, London WC1A 1JR

    Redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Decided 7 Mar 2024 Full applications

What this grant of permission means

Camden granted permission on 16 June 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 1 Museum Street London WC1A 1JR

    2024/5746/P 0m away

    Details to discharge Condition 40 (Waste Water Heat) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Granted Full applications Demolition
  • 1 Museum Street London WC1A 1JR

    2024/5282/P 0m away

    Details to part discharge Condition 23 (Arboricultural Method Statement) - pre-demolition, of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Granted Full applications Demolition
  • Selkirk House 166 High Holborn 1 Museum Street 10-12 Museum Street 35-41 New Oxford Street and 16A-18 West Central Street London WC1A 1JR

    2024/4662/P 0m away

    Variation of Condition 2 (Approved Plans) of planning permission reference 2023/2510/P dated 07/03/24, namely: to reflect proposed changes to the ground floor and basement (levels 1 and 2) layout, including a revised servicing strategy and associated alterations to entrances; alterations to core layout at upper floors; and changes to the elevations across the upper floors of 1 Museum Street including changes to the floor levels, additional glazing to the facade, introduction of inset terraces at levels 7, 10 and 15 and openable vent panels and revised BMU layout at roof level.

    Granted Full applications Windows or glazing
  • Selkirk House 166 High Holborn 1 Museum Street 10-12 Museum Street 35-41 New Oxford Street and 16A-18 West Central Street London WC1A 1JR

    2025/4874/P Submitted 29 Oct 2025 0m away

    Details to discharge Condition 24 (Bird & Bat Box Locations) of planning reference 2024/4662/P dated 06/08/25 for variation of Condition 2 (Approved Plans) of planning permission reference 2023/2510/P dated 07/03/24, namely: to reflect proposed changes to the ground floor and basement (levels 1 and 2) layout, including a revised servicing strategy and associated alterations to entrances; alterations to core layout at upper floors; and changes to the elevations across the upper floors of 1 Museum Street including changes to the floor levels, additional glazing to the facade, introduction of inset terraces at levels 7, 10 and 15 and openable vent panels and revised BMU layout at roof level.

    Granted Full applications Windows or glazing 7 docs
  • 1 Museum Street London WC1A 1JR

    2024/5745/P 0m away

    Details to discharge Condition 28 (Piling) of planning reference 2023/2510/P dated 07/03/24 for redevelopment of Selkirk House, 166 High Holborn and 1 Museum Street following the substantial demolition of the existing NCP car park and former Travelodge Hotel to provide a mixed-use scheme, providing office, residential, and town centre uses at ground floor level. Works of part-demolition and refurbishment to 10-12 Museum Street, 35-41 New Oxford Street, and 16A-18 West Central Street to provide further town centre ground floor uses and residential floorspace, including affordable housing provision. Provision of new public realm including a new pedestrian route through the site to link West Central Street with High Holborn. Relocation of cycle hire docking stations on High Holborn.

    Granted Full applications Demolition
  • Selkirk House 166 High Holborn 1 Museum Street 10-12 Museum Street 35-41 New Oxford Street and 16A-18 West Central Street London WC1A 1JR

    2025/4826/P Submitted 27 Oct 2025 0m away

    Details to discharge Condition 23 (Arboricultural Method Statement) of planning reference 2024/4662/P dated 06/08/25 for variation of Condition 2 (Approved Plans) of planning permission reference 2023/2510/P dated 07/03/24, namely: to reflect proposed changes to the ground floor and basement (levels 1 and 2) layout, including a revised servicing strategy and associated alterations to entrances; alterations to core layout at upper floors; and changes to the elevations across the upper floors of 1 Museum Street including changes to the floor levels, additional glazing to the facade, introduction of inset terraces at levels 7, 10 and 15 and openable vent panels and revised BMU layout at roof level.

    Granted Full applications Windows or glazing 4 docs

In Camden

  • 2026/2516/P Withdrawn

    31 Loveridge Road London Camden NW6 2DU

    Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.

    16 Jun 2026 Full applications
  • 2026/3830/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    4 Sep 2026 Full applications
  • 2026/3282/P Granted

    5 Berkley Road London NW1 8XX

    Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)

    31 Jul 2026 Full applications
  • 2026/0483/P Granted

    100 Avenue Road London NW3 3HF

    Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”

    9 Feb 2026 Full applications
  • 2026/2697/P Awaiting decision

    Flat 1, 73 Eton Avenue London NW3 3EU

    Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.

    3 Sep 2026 Full applications