Planning application
2024/1478/L
9 Northington Street London WC1N 2ES
Proposal
Listed building consent is being sought to block/remove the existing connection between the application site and 9 John Street.
As published by the council, reference 2024/1478/L
Timeline
Dates from the published record
-
10 Sep 2024
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About heritage and listed buildings applications
How this application type works
Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.
More on heritage and listed buildings applications in our guide
Nearby applications
Within 500 metres
-
2019/5613/P Withdrawn
o/s 12 Northington Street London WC1N 2NW
Creation of dropped kerb to support off 2 x off-street parking following removal of 2 x cycle stands and 1 x tree
-
2024/0210/T Granted
9 Northington Street London WC1N 2JF
REAR GARDEN: 1 x Ash (T1) - Fell to ground level and treat stump to prevent growth.
-
2024/1056/P Granted
9 Northington Street London WC1N 2ES
Change of use from office (Class E) to residential (Class C3) to form 4x, 2-bedroom units, including associated external alterations including secondary glazing, and the replacement of a window with French doors to the rear and 4x ASHP at roof level.
-
2024/5208/L Awaiting decision
22 Great James Street London WC1N 3ES
Demolition of the existing two storey rear extension and erection of a replacement extension, erection of a single-storey rear extension and the internal refurbishment of the existing building, replacement of the single-glazed timber sash windows with double-glazed timber sash windows.
-
2024/4688/P Awaiting decision
22 Great James Street London WC1N 3ES
Change of use from offices (Class E) to dwelling house (Class C3), demolition of the existing two storey rear extension and erection of a replacement extension, erection of a single-storey extension and alteration to the existing hard landscaping to the rear.
-
2012/3343/P Granted
16 Great James Street London WC1N 3DP
Excavation to extend basement level at rear, beneath ground floor extension and external alterations at main roof including replacement of water tank enclosure, all for existing offices (Class B1)
Other heritage and listed buildings applications
In Camden
-
2026/3248/L Awaiting decision
15 Eton Villas London NW3 4SG
Single storey rear extension, internal reconfigurations, installation of double-glazed windows and doors, new air-conditioning units, landscaping to rear garden and erection of outbuilding amongst other alterations to the property.
-
2026/3213/L Awaiting decision
51, 53, 55, 57 Lamb's Conduit Street London Camden WC1N 3NB
Installation of gas infrastructure including an external gas riser, associated pipework, and internal alterations comprising the relocation of gas meters and associated connections
-
2026/2318/L Granted
90 Frognal London NW3 6XB
Structural strengthening of underground vault and underpinning of northern side of ground-floor boot room.
-
2026/2136/L Granted
45 Downshire Hill London NW3 1NU
Proposed repair and replacement of front elevation windows with matching single glazed timber sash units. Replacement modern French doors in slim-profile double glazing. Rear windows retained, and repaired as required.
-
2026/2122/L Granted
6 Royal College Street London NW1 0TH
Various internal and external changes, including replacement and alteration to timber windows, adjustments to internal layout, installation of fire-rated doors and emergency lighting, relocation and rearrangement of bathroom and kitchen (retrospective).