Skip to content
PlanIndex Get alerts
Menu

Planning application

2024/0369/P

Flat A 43 Dartmouth Park Hill London NW5 1HU

Granted Camden Full applications

Proposal

Erection of a single storey ground floor rear extension and garden room outbuilding to the rear of the garden and replacement glazing to existing ground floor bay windows to front elevation.

As published by the council, reference 2024/0369/P

Timeline

Dates from the published record

  1. 21 Jun 2024

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2017/4373/T Granted

    43 Dartmouth Park Hill London NW5 1HU

    REAR GARDEN: 1 x Ash - Fell

    28 Mar 2018 0m away Trees
  • 2017/3021/P Withdrawn

    45 Flat Ground Floor Dartmouth Park Hill LONDON NW5 1HU

    Erection of single-storey, rear and side-return extension to existing ground floor flat; including installation of rooflights.

    2 Aug 2017 6m away Full applications
  • 2020/3476/T Granted

    39 Dartmouth Park Hill London NW5 1HU

    REAR GARDEN: 1 x Mature Ash - Reduce crown back to previous most recent reduction/pollard points whilst retaining a suitable amount of furnishing growth to ensure crown continuity.

    8 Sep 2020 11m away Trees
  • 2020/2343/P Granted

    39 Dartmouth Park Hill London NW5 1HU

    Erection of rear dormer window.

    21 Aug 2020 11m away Full applications
  • 2024/1346/P Granted

    37 Dartmouth Park Hill London NW5 1HU

    Provision of roof terrace at rear at first floor level with installation of associated railings, garden access stairs, and privacy screening.

    1 Jul 2024 16m away Full applications
  • 2010/5497/T Granted

    12 Dartmouth Park Road London NW5 1SX

    REAR GARDEN: 1 x Ash - Reduce to previous points.

    17 Nov 2010 21m away Trees

In Camden

  • 2026/0743/P Granted

    34-42 Middlesex House Cleveland Street London W1T 4JE

    Details pursuant to Condition 6 (Living Roof) of planning permission 2024/2020/P granted on 12/09/2024 "(Minor refurbishment and rooftop works including: upgraded entrance and reception area; new cycle storage and associated end of trip facilities; new/replaced rooftop plant and plant enclosures; creation of a rooftop amenity area with pavilion structure; hard and soft rooftop landscaping; and all associated and ancillary works)."

    25 Feb 2026 Full applications
  • 2026/3202/P Awaiting decision

    Flat 1 94 Goldhurst Terrace London NW6 3HS

    Erection of a single storey rear extension.

    30 Jul 2026 Full applications
  • 2026/0335/P Granted

    216A West End Lane London NW6 1UX

    Conversion of 1 x 7 bedroom flat (C3) and 1 x 2 bedroom flat (C3) to 1 x 7 bedroom House in Multiple Occupation (Sui-generis) and 1 x 1 bedroom flat (C3) and installation of four rooflights

    28 Jan 2026 Full applications
  • 2026/3229/P Awaiting decision

    52 Neal Street London WC2H 9PA

    Alterations to the shopfront and installation of awnings.

    29 Jul 2026 Full applications
  • 2026/2160/P Granted

    120 College Place London NW1 0DJ

    Erection of a rear roof extension, formation of a rear roof terrace and installation of 2x rooflights to front roof slope, and associated works.

    28 May 2026 Full applications