Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

Granted Camden 2023/2662/P Full applications

Relates to 2018/5774/P, 2016/6088/P, 2022/3378/P

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of condition 2 (Approved Plans) and deletion of conditions 48 (Post Construction Viability Assessment) and 49 (Affordable Units) of development granted under reference 2016/6088/P dated 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019 and 2022/3378/P dated 10 March 2023 for the Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 41 residential units (Use Class C3) including 7 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site. Namely to make the following changes: - Change the tenure mix to 100% affordable housing - Amendments to the layout of the first - third floors of Building A to include a new entrance door at the northern end of the corridor to facilitate the amalgamation of two 2 x bedroom units into one 4 x bedroom unit at each floor - Amendments to the layout of the fourth floor of Building A to remove an entrance door and the inclusion of a new opening in the party wall to facilitate the amalgamation of two 3 x bedroom units into one 6 x bedroom unit - Amendments to the layout of ground and first floors of Building C to amalgamate two 3 x bedroom units into one 6 x bedroom unit - Change in the overall unit number from 41 to 36. This would result in total of 36 units to be provided across three buildings, comprising 1x studio, 19x one-bed, 8x two-bed, 3x three-bed, 3x four-bed and 2x six-bed.

As published by the council, reference 2023/2662/P

Application record

Reference
2023/2662/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
1 Aug 2023
Postcode
N19 5DQ

Site history

Applications at this address on the Camden register

This site has had 28 applications since 2011: 28 approved, 0 refused.

  • 2023/5438/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Variation of condition 2 (Approved Plans) and condition 7 (Landscaping) of development granted under reference 2016/6088/P dated 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 20 November 2023 for the "Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 41 residential units (Use Class C3) including 7 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site." Namely to make the following changes: - Construction of an ASHP at roof level of Building B including its relocation and visual screening - Installation of vertical shading structures externally to the windows at the east facing windows of Building A (Apartment A2) at ground floor level - Installation of privacy screening to the northern end of the balconies of Building D - Reduction in the number of rooflight to Building B and C - Relocation of the substation approximately 1m east from the approved location - Reduction in height of the Building C rear garden wall to 2.4 comprising a brick wall to 1.9m with an additional 0.5m privacy barrier above - Amendment to the parapet detail of the Building A roof to match the as built detail.

    Decided 13 Mar 2024 Amendments
  • 2023/3746/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to conditions 38 (Parking Management Plan), 39 (Servicing Management Plan), 41 (Travel Plan and Associated Monitoring Fee) and 44 (Public Realm Management Plan) of planning permission reference 2016/6088/P granted on 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 1 August 2023 for the Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 36 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site.

    Decided 17 Oct 2023 Full applications
  • 2023/3464/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to condition 47 (Community Facility Management Plan) of planning permission reference 2016/6088/P granted on 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 1 August 2023 for the Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 36 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site.

    Decided 7 Sep 2023 Full applications
  • 2023/2906/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to condition 10 (Evidence of installation - SuDS) of planning permission reference 2016/6088/P granted on 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019 and 2022/3378/P dated 10 March 2023 for the Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 41 residential units (Use Class C3) including 7 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site.

    Decided 20 Jul 2023 Full applications
  • 2021/6133/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to Condition 9 (SUDS) of planning permission reference 2016/6088/P dated 30/06/17 as varied by planning reference 2018/5774/P dated 29/03/19 for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 31 residential units (Use Class C3) with associated public open space, landscaping, cycle storage, plant and disabled parking.

    Decided 16 Jun 2023 Full applications
  • 2022/2899/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to conditions 13 (Living Roof) & 15 (External Lighting) of planning permission reference 2016/6088/P dated 30/06/17, as varied by planning permission reference 2018/5774/P dated 29/03/19, for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities and 31 residential units with associated public open space, landscaping, cycle storage, plant and disabled parking.

    Decided 23 May 2023 Full applications
  • 2022/3378/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Variation of Condition 2 (Approved Plans) of development granted under reference 2016/6088/P dated 30/06/17 as varied by reference 2018/5774/P dated 29/03/19 for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 31 residential units (Use Class C3) with associated public open space, landscaping, cycle storage, plant and disabled parking namely following: Amendments to Block A: 1) Conversion of selected windows to sliding doors at the eastern and western elevation to the 4th floor penthouse units of Block A 2) Provision of a guardrail on top of the parapet wall to these external spaces to ensure they meet relevant British safety standards for external amenity spaces. 3) Allocation of these space as 'private amenity' as Condition 6 of the planning permission currently restricts access. Amendments to Block B: Conversion of one first floor window on eastern elevation to maintenance door to facilitate maintenance access only to roof, and conversion of one double hung first floor window on the eastern elevation to a larger single opening window.

    Decided 10 Mar 2023 Full applications
  • 2022/2399/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to Condition 18 (Tree Planting/Replacing Specification), Condition 28 (Cycle Parking Spaces) and Condition 37 (Landscape Management Plan) of planning permission reference 2016/6088/P dated 30/06/17 as varied by planning reference 2018/5774/P dated 29/03/19 for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 31 residential units (Use Class C3) with associated public open space, landscaping, cycle storage, plant and disabled parking.

    Decided 16 Jan 2023 Full applications
  • 2022/2401/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to Condition 12 (Photo Voltaic Cells) of planning permission reference 2016/6088/P dated 30/06/17 as varied by planning reference 2018/5774/P dated 29/03/19 for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 31 residential units (Use Class C3) with associated public open space, landscaping, cycle storage, plant and disabled parking.

    Decided 12 Dec 2022 Full applications
  • 2022/2402/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to Condition 3c (Detailed Drawings & Samples) of planning permission reference 2016/6088/P dated 30/06/17 as varied by planning reference 2018/5774/P dated 29/03/19 for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 31 residential units (Use Class C3) with associated public open space, landscaping, cycle storage, plant and disabled parking.

    Decided 2 Sep 2022 Full applications

Timeline

Dates from the published record

  1. 1 Aug 2023

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2018/5774/P Granted

    Highgate Newtown Community Centre Unit A, B, C, D & E 25 Bertram Street London N19 5DQ

    Variation of development granted under reference 2016/6088/P dated 30/06/17 for 'Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 31 residential units (Use Class C3) with associated public open space, landscaping, cycle storage, plant and disabled parking.' Namely to make the following changes: - Amend the height/bulk and massing, elevations - Increase the number of residential units from 31 to 41 - Include 7 affordable units (intermediate) as opposed to none - Reduce the area of the community facilities, to result in a smaller increase above the existing floorspace - Remove most of the basement - Include the existing right of way on the western side of the site.

    Decided 29 Mar 2019 Full applications
  • 2016/6088/P Granted

    Highgate Newtown Community Centre Unit A, B, C, D & E 25 Bertram Street London N19 5DQ

    Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People’s Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 31 residential units (Use Class C3) with associated public open space, landscaping, cycle storage, plant and disabled parking.

    Decided 30 Jun 2017 Full applications
  • 2022/3378/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Variation of Condition 2 (Approved Plans) of development granted under reference 2016/6088/P dated 30/06/17 as varied by reference 2018/5774/P dated 29/03/19 for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 31 residential units (Use Class C3) with associated public open space, landscaping, cycle storage, plant and disabled parking namely following: Amendments to Block A: 1) Conversion of selected windows to sliding doors at the eastern and western elevation to the 4th floor penthouse units of Block A 2) Provision of a guardrail on top of the parapet wall to these external spaces to ensure they meet relevant British safety standards for external amenity spaces. 3) Allocation of these space as 'private amenity' as Condition 6 of the planning permission currently restricts access. Amendments to Block B: Conversion of one first floor window on eastern elevation to maintenance door to facilitate maintenance access only to roof, and conversion of one double hung first floor window on the eastern elevation to a larger single opening window.

    Decided 10 Mar 2023 Full applications

5 later applications on the register refer to this one:

  • 2024/0038/P Granted

    Youth Club 25 Bertram Street London N19 5DQ

    Details pursuant to Condition 21 (Land Contamination - Remediation Strategy) of planning permission reference 2016/6088/P dated 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 20 November 2023 for the "Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 41 residential units (Use Class C3) including 7 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site."

    Decided 7 Feb 2024 Reserved matters
  • 2023/5438/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Variation of condition 2 (Approved Plans) and condition 7 (Landscaping) of development granted under reference 2016/6088/P dated 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 20 November 2023 for the "Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 41 residential units (Use Class C3) including 7 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site." Namely to make the following changes: - Construction of an ASHP at roof level of Building B including its relocation and visual screening - Installation of vertical shading structures externally to the windows at the east facing windows of Building A (Apartment A2) at ground floor level - Installation of privacy screening to the northern end of the balconies of Building D - Reduction in the number of rooflight to Building B and C - Relocation of the substation approximately 1m east from the approved location - Reduction in height of the Building C rear garden wall to 2.4 comprising a brick wall to 1.9m with an additional 0.5m privacy barrier above - Amendment to the parapet detail of the Building A roof to match the as built detail.

    Decided 13 Mar 2024 Amendments
  • 2023/4750/P Granted

    Youth Club 25 Bertram Street London N19 5DQ

    Details pursuant to conditions 25 (Sound Proofing) and 27 (Internal Noise Levels - Sound Proofing) of planning permission reference 2016/6088/P granted on 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 1 August 2023 for the "Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 36 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site".

    Decided 20 Nov 2023 Full applications
  • 2023/3746/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to conditions 38 (Parking Management Plan), 39 (Servicing Management Plan), 41 (Travel Plan and Associated Monitoring Fee) and 44 (Public Realm Management Plan) of planning permission reference 2016/6088/P granted on 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 1 August 2023 for the Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 36 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site.

    Decided 17 Oct 2023 Full applications
  • 2023/3464/P Granted

    Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    Details pursuant to condition 47 (Community Facility Management Plan) of planning permission reference 2016/6088/P granted on 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 1 August 2023 for the Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 36 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site.

    Decided 7 Sep 2023 Full applications

What this grant of permission means

Camden granted permission on 1 August 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    2021/0384/P 0m away

    Details pursuant to condition 45 (Energy and Sustainability Plan) of planning permission reference 2016/6088/P dated 30/06/17 (as varied by reference 2018/5774/P dated 29/03/19 and reference 2020/1684/P dated 15/07/20) for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities and 31 residential units.

    Granted Full applications
  • Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    2023/5438/P Submitted 22 Dec 2023 0m away

    Variation of condition 2 (Approved Plans) and condition 7 (Landscaping) of development granted under reference 2016/6088/P dated 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 20 November 2023 for the "Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 41 residential units (Use Class C3) including 7 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site." Namely to make the following changes: - Construction of an ASHP at roof level of Building B including its relocation and visual screening - Installation of vertical shading structures externally to the windows at the east facing windows of Building A (Apartment A2) at ground floor level - Installation of privacy screening to the northern end of the balconies of Building D - Reduction in the number of rooflight to Building B and C - Relocation of the substation approximately 1m east from the approved location - Reduction in height of the Building C rear garden wall to 2.4 comprising a brick wall to 1.9m with an additional 0.5m privacy barrier above - Amendment to the parapet detail of the Building A roof to match the as built detail.

    Granted Amendments Loft or dormer Windows or glazing 16 docs
  • Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    2013/1018/P 0m away

    Replacement of existing garage doors with timber framed windows and timber louvres to courtyard elevation, installation of widened door and removal of vent pipe to west elevation of youth centre (Class D1).

    Granted Full applications Windows or glazing
  • Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    2021/6203/P 0m away

    Details pursuant to Condition 7 (Proposed Earthworks, Biodiversity & Open Space Management) of planning permission reference 2016/6088/P dated 30/06/17 as varied by planning reference 2018/5774/P dated 29/03/19 for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 31 residential units (Use Class C3) with associated public open space, landscaping, cycle storage, plant and disabled parking.

    Granted Full applications
  • Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    2021/2619/P 0m away

    Details pursuant to Condition 13 (Green Roof) of planning permission reference 2016/6088/P dated 30/06/17 (as varied by reference 2018/5774/P dated 29/03/19 and reference 2020/1684/P dated 15/07/20) for redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities and 31 residential units.

    Granted Full applications
  • Highgate New Town Community Centre 25 Bertram Street London N19 5DQ

    2023/3746/P 0m away

    Details pursuant to conditions 38 (Parking Management Plan), 39 (Servicing Management Plan), 41 (Travel Plan and Associated Monitoring Fee) and 44 (Public Realm Management Plan) of planning permission reference 2016/6088/P granted on 30 June 2017 as varied by reference 2018/5774/P dated 29 March 2019, 2022/3378/P dated 10 March 2023, and 2023/2662/P dated 1 August 2023 for the Redevelopment of the existing Highgate Newtown Community Centre and Fresh Youth Academy and the change of use of the People's Mission Gospel Hall to provide replacement community facilities (Use Class D1) and 36 affordable units (intermediate) with associated public open space, landscaping, cycle storage, plant, disabled parking, and inclusion of the existing right of way on the western side of the site.

    Granted Full applications

In Camden

  • 2026/2516/P Withdrawn

    31 Loveridge Road London Camden NW6 2DU

    Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.

    16 Jun 2026 Full applications
  • 2026/3830/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    4 Sep 2026 Full applications
  • 2026/3282/P Granted

    5 Berkley Road London NW1 8XX

    Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)

    31 Jul 2026 Full applications
  • 2026/0483/P Granted

    100 Avenue Road London NW3 3HF

    Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”

    9 Feb 2026 Full applications
  • 2026/2697/P Awaiting decision

    Flat 1, 73 Eton Avenue London NW3 3EU

    Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.