Skip to content
PlanIndex Get alerts
Menu

Planning application

The Sutton Estate Barnsbury London N1

Granted Camden 2022/4595/P Full applications

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Hybrid planning application seeking detailed permission for Phase 1a, 1b and 3a and outline planning permission for all future phases 1c, 2a, 2b and 3b comprising: In full, demolition of existing buildings and undertaking of groundworks and the erection of 427 residential units (Use Class C3) within seven buildings of 3, 7, 9, 11, 12 and 13 storeys comprising 148 x 1 bed, 203 x 2 bed, 58 x 3 bed, 13 x 4 bed and 5 x 5 bed over 50672sq.m floorspace in phases 1a, 1b and 3a; hard and soft landscaping works including public open space and new public realm, access and highway formation and alterations, car and cycle provision with associated ancillary works.Outline planning permission (all matters reserved) for the demolition of all remaining buildings, undertaking of ground works and the construction of a phased redevelopment of new buildings of up to 9 storeys and incorporating up to 76100sq.m to include up to 523 residential units (Use Class C3), up to 1500sq.m of replacement retail and town centre floorspace (Use Class E), and 1275sq.m of replacement community use floorspace including community centre and nursery (Use Class F2), within phases 1c, 2a, 2b and 3b, hard and soft landscaping, new public open space, access and highway formation and alterations, new pedestrian means of access, car and cycle parking provision and ancillary works.

As published by the council, reference 2022/4595/P

Application record

Reference
2022/4595/P
Category
Full applications
Status
Final Decision
Decision
Granted As published: No objection
Decided
22 Dec 2022

Timeline

Dates from the published record

  1. 22 Dec 2022

    Decision issued: No objection

  2. 22 Jul 2026

    Added to PlanIndex

What this grant of permission means

Camden granted permission on 22 December 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Camden

  • 2026/3898/P Awaiting decision

    98 Marchmont Street London WC1N 1AG

    Installation of a new kitchen extraction and ventilation system to the rear of the premises, including associated external ductwork, extraction plant and ancillary equipment.

    Received 16 Sep, published by the council 17 Sep 2026 Full applications
  • 2026/2709/P Awaiting decision

    166A Camden Street London NW1 9PT

    Change of use from Use Class E to C3 Residential, demolition of existing store and office space, and erection of a three-bedroom dwellinghouse.

    Received 16 Sep, published by the council 17 Sep 2026 Full applications
  • 2026/3994/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 23 (LUL Subculture) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 2026/3993/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 22 (LUL Infrastructure) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications
  • 2026/3861/P Awaiting decision

    Beaumont Court 1-45 College Grove London NW1 0RW

    Installation of condensors and minor alterations to elevations at lower floors.

    Received 15 Sep, published by the council 17 Sep 2026 Full applications