Proposal
Use of basement and ground floor as a restaurant (Class E)
As published by the council, reference 2021/5995/P
Timeline
Dates from the published record
-
9 Feb 2022
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2015/5476/P Decided
23 Rathbone Place London W1T 1HZ
Change of use from retail (Class A1) to restaurant and cafe use (Calss A3) for a period of 2 years.
-
2022/2227/P Granted
23 Rathbone Place London City Of Westminster W1T 1HZ
Erecting of extractions and ventilation duct system and 2 no. AC condensers at rear elevation and louvre to the front elevation fronting Gresse Street.
-
2019/6065/P Withdrawn
23 Rathbone Place London W1T 1HZ
Prior approval for change of use of ground floor premises from retail (Class A1) to cafe/restaurant (Class A3)
-
2022/4201/P Granted
23 Rathbone Place London W1T 1HZ
Amendment to approved 2022/2227/P dated 23/09/2022 (for: Erecting of extractions and ventilation duct system and 2 no. AC condensers at rear elevation and louvre to the front elevation fronting Gresse Street.) CHANGES are: to change the shape of the extraction duct on the rear elevation from rectangular to circular.
-
2020/3062/P Granted
Tudor House 35 Gresse Street London W1T 1QY
Alteration to the existing fenestration treatment including replacement of the existing windows and door to the front elevation, replacement of the window with door, installation of metal deck for a raised platform within the rear lightwell and installation of louvres first to fourth floors to the rear elevation.
-
2021/1200/A Granted
Tudor House 35 Gresse Street London W1T 1QY
Display of two non-illuminated entrance signs
Other full applications applications
In Camden
-
2026/0743/P Granted
34-42 Middlesex House Cleveland Street London W1T 4JE
Details pursuant to Condition 6 (Living Roof) of planning permission 2024/2020/P granted on 12/09/2024 "(Minor refurbishment and rooftop works including: upgraded entrance and reception area; new cycle storage and associated end of trip facilities; new/replaced rooftop plant and plant enclosures; creation of a rooftop amenity area with pavilion structure; hard and soft rooftop landscaping; and all associated and ancillary works)."
-
2026/3202/P Awaiting decision
Flat 1 94 Goldhurst Terrace London NW6 3HS
Erection of a single storey rear extension.
-
2026/0335/P Granted
216A West End Lane London NW6 1UX
Conversion of 1 x 7 bedroom flat (C3) and 1 x 2 bedroom flat (C3) to 1 x 7 bedroom House in Multiple Occupation (Sui-generis) and 1 x 1 bedroom flat (C3) and installation of four rooflights
-
2026/3229/P Awaiting decision
52 Neal Street London WC2H 9PA
Alterations to the shopfront and installation of awnings.
-
2026/2160/P Granted
120 College Place London NW1 0DJ
Erection of a rear roof extension, formation of a rear roof terrace and installation of 2x rooflights to front roof slope, and associated works.