Planning application

HS2 Melton Street LU Sub Station Compound Land to the South of Euston Station London NW1 2BT

Granted Camden 2021/4406/HS2

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for approval under Schedule 17 of High Speed Rail (London - West Midlands) Act 2017 of lorry routes to and from the Melton Street LU Substation associated with the construction, excavation and above ground construction of the replacement London Underground Traction Substation and Vent Shaft. Main works activities include: capping beam, propping and excavation of the piled box; RC structures; headhouse fit out and envelope; Mechanical, Electrical, Plumbing and Heating (MEPH) and associated enabling works. Incorporating lorry routes via: Transport for London Road Network (TLRN), Melton Street, Cardington Street, Albany Street, Osnaburgh Terrace, Osnaburgh Street and Great Portland Street.

As published by the council, reference 2021/4406/HS2

Application record

Reference
2021/4406/HS2
Status
Final Decision
Decision
Approval
Decided
5 Nov 2021
Postcode
NW1 2BT

Site history

Applications at this address on the Camden register

This site has had 2 applications since 2020: 2 approved, 0 refused.

  • 2020/3350/HS2 Granted

    HS2 Melton Street LU Sub Station Compound Land to the South of Euston Station London NW1 2BT

    Application for approval under Schedule 17 of High Speed Rail (London - West Midlands) Act 2017 of lorry routes to and from the Melton Street LU Sub Station associated with works for HS2. Main works activities include: demolition, site clearance, construction of a shaft, construction of a utility tunnel, the provision of an adit, site investigations, piling of the proposed sub-station and other associated enabling works. Incorporating lorry routes via: Transport for London Road Network (TLRN), Melton Street, Cardington Street, Albany Street, Osnaburgh Terrace, Osnaburgh Street and Great Portland Street.

    Decided 21 Sep 2020

Timeline

Dates from the published record

  1. 5 Nov 2021

    Decision issued: Approval

  2. 22 Jul 2026

    Added to PlanIndex

What this grant of permission means

Camden granted permission on 5 November 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Camden's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • HS2 Melton Street Satellite Compound Land to the south of Euston Station London NW1 2BT

    2020/1321/HS2 0m away

    Application for approval under Schedule 17 of High Speed Rail (London - West Midlands) Act 2017 of lorry routes to and from the Melton Street Satellite Compound associated with works for HS2. Main works activities include: Demolition, site clearance, ground investigations, utility works/diversions, and other associated enabling works. Incorporating lorry routes via: - Transport for London Road Network (TLRN) - Melton Street - Cardington Street

    Granted Demolition
  • HS2 Euston Station Site Cardington Street London NW1 2BX

    2020/2355/HS2 0m away

    Application for approval under Schedule 17 of High Speed Rail (London - West Midlands) Act 2017 of lorry routes to and from the Euston Station Main Works - Early Works Worksite associated with works for HS2. Main works activities include: logistics, enabling works, piling and surveying works. Incorporating lorry routes via: Transport for London Road Network (TLRN), Melton Street, Cardington Street, Albany Street, Osnaburgh Terrace, Osnaburgh Street and Great Portland Street.

    Granted
  • HS2 Melton Street LU Sub Station Compound Land to the South of Euston Station London NW1 2BT

    2020/3350/HS2 0m away

    Application for approval under Schedule 17 of High Speed Rail (London - West Midlands) Act 2017 of lorry routes to and from the Melton Street LU Sub Station associated with works for HS2. Main works activities include: demolition, site clearance, construction of a shaft, construction of a utility tunnel, the provision of an adit, site investigations, piling of the proposed sub-station and other associated enabling works. Incorporating lorry routes via: Transport for London Road Network (TLRN), Melton Street, Cardington Street, Albany Street, Osnaburgh Terrace, Osnaburgh Street and Great Portland Street.

    Granted Demolition
  • Pavements of Stephenson Way and Melton Street, and around Euston Square Gardens, NW1

    2022/1039/A 0m away

    Temporary display of 22 x hoarding advertisements on Stephenson Way, Melton Street, around the current and interim car park at Euston Square Gardens (part retrospective) in conjunction with HS2/Euston Station until end of works at HS2 Euston Station until 31/03/2025.

    Granted
  • 14-15 Melton Street London NW1 2EA

    2018/3030/HS2 36m away

    Heritage Agreement Method Statement for the Recording of 14-15 Melton Street, London NW1

    Granted
  • Walkden House 10 Melton Street London NW1 2EJ

    2012/2222/P 38m away

    Mixed use office (Class B1) and residential (Class C3) redevelopment of the site following demolition of existing building. Offices to comprise 6 storey building including basement with roof terraces to Melton Street and Stephenson Way and main entrance to Melton Street. Residential to comprise 18 units in 5 storey building with lower ground floor facing Euston Street with entrances on Melton Street and Stephenson Way.

    Granted Full applications Demolition
    Major scheme