Planning application
2021/3601/P
University College London Central Building Malet Place London WC1E 6BT
Proposal
Temporary installation of plant equipment and ductwork, scaffolding and associated external works (retrospective).
As published by the council, reference 2021/3601/P
Timeline
Dates from the published record
-
6 Sep 2021
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2016/4628/P Granted
University College London Malet Place London WC1E 6BT
Installation of 1 no. mounted pole antenna on the roof of the Roberts Building.
-
2011/2204/P Granted
Foster Court Malet Place London WC1E 7JG
Amendment to relocate the screen wall at North end of Foster Courtyard to planning permission dated 03/11/2009 (ref. 2009/3608/P) for various alterations including new condenser compound and associated screening to internal courtyard at ground floor level.
-
2026/2803/P Awaiting decision
Foster Court Gower Street London WC1E 6BT
Installation of an external condenser unit on the ground floor rear elevation and associated works
-
2022/3979/P Granted
UCL Medawar Building Gower Street London WC1E 6BT
Amendments to planning permission ref: 2020/1445/P granted 13/05/2020 (for the installation of new condenser to the roof adjacent to the 4th floor tower, new intake and exhaust grilles to the 4th floor external façade, and the alteration of the fire escape from the 4th floor tower onto the adjacent roof), namely involving relocation of condenser, replacement of redundant fan with glazing panel, and reconfiguration of fire door widths
-
2020/1445/P Granted
UCL Medawar Building Gower Street London WC1E 6BT
Installation of new condenser to the roof adjacent to the 4th floor tower, new intake and exhaust grilles to the 4th floor external façade, and the alteration of the fire escape from the 4th floor tower onto the adjacent roof.
-
2021/3194/P Granted
Medawar Building Gower Street London WC1E 6BT
Erection of two secure cycle docking facilities to create 24 bicycle spaces.
Other full applications applications
In Camden
-
2026/0743/P Granted
34-42 Middlesex House Cleveland Street London W1T 4JE
Details pursuant to Condition 6 (Living Roof) of planning permission 2024/2020/P granted on 12/09/2024 "(Minor refurbishment and rooftop works including: upgraded entrance and reception area; new cycle storage and associated end of trip facilities; new/replaced rooftop plant and plant enclosures; creation of a rooftop amenity area with pavilion structure; hard and soft rooftop landscaping; and all associated and ancillary works)."
-
2026/3202/P Awaiting decision
Flat 1 94 Goldhurst Terrace London NW6 3HS
Erection of a single storey rear extension.
-
2026/0335/P Granted
216A West End Lane London NW6 1UX
Conversion of 1 x 7 bedroom flat (C3) and 1 x 2 bedroom flat (C3) to 1 x 7 bedroom House in Multiple Occupation (Sui-generis) and 1 x 1 bedroom flat (C3) and installation of four rooflights
-
2026/3229/P Awaiting decision
52 Neal Street London WC2H 9PA
Alterations to the shopfront and installation of awnings.
-
2026/2160/P Granted
120 College Place London NW1 0DJ
Erection of a rear roof extension, formation of a rear roof terrace and installation of 2x rooflights to front roof slope, and associated works.