Skip to content
PlanIndex Get alerts
Menu

Planning application

6 Howitt Road London NW3 4LL

Granted Camden 2021/0120/P Full applications

Works: Loft or dormer Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of front and rear rooflights and glazed timber front door at basement level.

As published by the council, reference 2021/0120/P

Application record

Reference
2021/0120/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
9 Jun 2021
Postcode
NW3 4LL

Timeline

Dates from the published record

  1. 9 Jun 2021

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

What this grant of permission means

Camden granted permission on 9 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 8 Howitt Road London NW3 4LL

    2010/3945/P 8m away

    Details pursuant to condition 2 (details of the biodiverse green roof including species, planting density, substrate) of planning permission 2008/2231/P dated 12/08/2008 for additions and alterations including excavation of basement, rear lightwell and erection of two storey (basement and ground floor) rear extension ,following demolition of original ground floor extension to create additional residential floor space to ground floor flat.

    Granted Full applications Extension Demolition
  • Flat D 1 Howitt Road London NW3 4LT

    2010/6295/P 29m away

    Erection of dormer to the upper rear roof slope and two rooflights to front roof slope of existing residential flat (Class C3)

    Granted Full applications Loft or dormer
  • 3 Howitt Road London NW3 4LT

    2012/0758/P 29m away

    Erection of dormer window in rear upper roofslope in connection with existing dwellinghouse (Class C3).

    Granted Full applications Loft or dormer Windows or glazing
    Domestic
  • 3 Glenloch Road London NW3 4BX

    2020/4097/T 29m away

    REAR GARDEN: 1 x Hazel - 30% overall reduction

    Granted Trees
  • 3 Glenloch Road London NW3 4BX

    2016/6160/T 29m away

    REAR GARDEN: 1 x Hazel - 30% overall reduction

    Granted Trees
  • 3 Glenloch Road London NW3 4BX

    2023/3270/T 29m away

    REAR GARDEN: 1 x Hazel - Reduce back to previous points.

    Granted Trees

In Camden

  • 2026/3898/P Awaiting decision

    98 Marchmont Street London WC1N 1AG

    Installation of a new kitchen extraction and ventilation system to the rear of the premises, including associated external ductwork, extraction plant and ancillary equipment.

    16 Sep 2026 Full applications
  • 2026/2709/P Awaiting decision

    166A Camden Street London NW1 9PT

    Change of use from Use Class E to C3 Residential, demolition of existing store and office space, and erection of a three-bedroom dwellinghouse.

    16 Sep 2026 Full applications
  • 2026/3994/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 23 (LUL Subculture) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    15 Sep 2026 Full applications
  • 2026/3993/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 22 (LUL Infrastructure) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    15 Sep 2026 Full applications
  • 2026/3861/P Awaiting decision

    Beaumont Court 1-45 College Grove London NW1 0RW

    Installation of condensors and minor alterations to elevations at lower floors.

    15 Sep 2026 Full applications