Skip to content
PlanIndex Get alerts
Menu

Planning application

Institute Of Education 20 Bedford Way London WC1H 0AL

Granted Camden 2019/6386/P Full applications

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Minor alterations and refurbishment works to selected areas, including Cores A, B and C and alterations to the existing plant enclosure on the roof and the installation of a new chiller unit within this enclosure.

As published by the council, reference 2019/6386/P

Application record

Reference
2019/6386/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
2 Mar 2020
Postcode
WC1H 0AL

Site history

Applications at this address on the Camden register

This site has had 42 applications since 2012: 36 approved, 2 refused.

  • 2026/3533/P Awaiting decision

    Institute Of Education 20 Bedford Way London WC1H 0AL

    Variation of condition 2 (approved plans) of planning permission 2024/3198/P dated 02/10/2024 (for: Upgrading of the existing Bloomsbury District Heat network through the installation of roof mounted air source heat pumps and supporting equipment within an acoustic enclosure, and associated external works.) NAMELY, the reconfiguration of plant, amendment of the steelwork structure distributing the load of the new plant areas through the existing building, and the amendment of the louvred plant screens to satisfy the opposing requirements of ventilation to plant and sound attenuation.

    Submitted 18 Aug 2026 Amendments
  • 2026/3505/L Awaiting decision

    Institute Of Education 20 Bedford Way London WC1H 0AL

    Variation of condition 2 (approved plans) of Listed Building Consent 2024/3245/L dated 02/10/2024 (for: Upgrading of the existing Bloomsbury District Heat network through the installation of roof mounted air source heat pumps and supporting equipment within an acoustic enclosure, and associated external works.) NAMELY, the reconfiguration of plant, amendment of the steelwork structure distributing the load of the new plant areas through the existing building, and the amendment of the louvred plant screens to satisfy the opposing requirements of ventilation to plant and sound attenuation.

    Submitted 14 Aug 2026 Heritage and listed buildings
  • 2024/3644/L Granted

    Institute of Education 20 Bedford Way London WC1H 0AL

    Internal works comprising reconfiguration and refurbishment of Levels 5-9 Core A nib and wing, Level 6 wing A Lawton Room, Level 1 plantroom, Level 4 Room 426, Level 5 Zone C and Levels 1, 3 and 4 foyers; replacement mezzanine levels to selected rooms at Levels 2 and 3 in Core C and Levels 4 and 5; creation of new plant room at Level 8 wing A; new post room to Level 4; installation of platform lifts at Level 3 and 4 foyers; installation of fixed furniture and security gates in foyers; replacement of doors to the IALs building at Levels 4-9; infill of Level 1 drama hall window; replacement of existing halls signage with new digital signage at Levels 1-9 Cores A and B, Level 3 and 4 Zone B and Level 5 Zone C; and other associated internal works. External works comprising a new extended entrance at Bedford Way; a reconfigured entrance at Thornhaugh Mews; alterations to roof plant enclosure and new chiller unit; repairs and installation of insulation to external Levels 6-9 terraces; installation of secondary glazing to selected panels; new louvres at Level 8 wing A; smoke ventilation panels along Bedford Way elevation; refurbishment and repairs to Level 4 and 10 roof; new external gate at Level 5 wing A; replacement rooflights at Level 4; external beacons at Level 6 and 10 roof; and other associated external works

    Decided 22 Oct 2024 Heritage and listed buildings
  • 2024/3607/P Granted

    Institute of Education 20 Bedford Way London WC1H 0AL

    Installation of new extended entrance at Bedford Way; a reconfigured entrance at Thornhaugh Mews; alterations to roof plant enclosure and new chiller unit; repairs and installation of insulation to external Levels 6-9 terraces; installation of secondary glazing to selected panels; new louvres at Level 8 wing A; smoke ventilation panels along Bedford Way elevation; refurbishment and repairs to Level 4 and 10 roof; new external gate at Level 5 wing A; replacement rooflights at Level 4; external beacons at Level 6 and 10 roof; and other associated external works.

    Decided 22 Oct 2024 Full applications
  • 2024/3245/L Granted

    Institute Of Education 20 Bedford Way London WC1H 0AL

    Upgrading of the existing Bloomsbury District Heat network through the installation of roof mounted air source heat pumps and supporting equipment within an acoustic enclosure, and associated external and internal works

    Decided 2 Oct 2024 Heritage and listed buildings
  • 2024/3198/P Granted

    Institute Of Education 20 Bedford Way London WC1H 0AL

    Upgrading of the existing Bloomsbury District Heat network through the installation of roof mounted air source heat pumps and supporting equipment within an acoustic enclosure, and associated external works

    Decided 2 Oct 2024 Full applications
  • 2021/6235/P Granted

    Institute Of Education 20 Bedford Way London WC1H 0AL

    Refurbishment and reconfiguration of selected areas comprising: a new extended entrance at Bedford Way, a reconfigured entrance at Thornhaugh Mews; and other associated works.

    Decided 2 Mar 2022 Full applications
  • 2021/6242/L Granted

    Institute Of Education 20 Bedford Way London WC1H 0AL

    Refurbishment and reconfiguration of selected areas comprising: a new extended entrance at Bedford Way, a reconfigured entrance at Thornhaugh Mews; insertion of a new platform lift at Level 3 and a platform lift serving Level 3 and 4; refurbishment of the foyers at Levels 1, 3 and 4 including the installation of fixed furniture and security gates; replacement of doors to the IALS building at Levels 4-9; and other associated works.

    Decided 2 Mar 2022 Heritage and listed buildings
  • 2020/1787/L Granted

    Institute Of Education 20 Bedford Way London WC1H 0AL

    Refurbishment of the lifts within the Cores B and C including the upgrade of landing indicators, evacuations intercoms, landing stations, fire control switches, landing doors, service stations, header/overgate panels and other associated works.

    Decided 5 Aug 2020 Heritage and listed buildings
  • 2020/1567/L Granted

    Institute Of Education 20 Bedford Way London WC1H 0AL

    Refurbishment and reconfiguration of selected areas of the Institute of Education comprising: repairs and installation of insulation to the external terraces; creation of a new plant room at Level 8 Wing A and installation of new louvres to serve this plant room; refurbishment and repairs to the lobby roof on level 4 and the roof at Level 10; installation of new external gate at Level 5 of Wing A; and associated works.

    Decided 15 Jun 2020 Heritage and listed buildings

Timeline

Dates from the published record

  1. 2 Mar 2020

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

What this grant of permission means

Camden granted permission on 2 March 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • University Of London Institute Of Education 20 Bedford Way London WC1H 0AL

    2022/4077/P Submitted 22 Sep 2022 0m away

    Details of external noise levels required by condition 4 of planning permission 2020/1520/P approved 15/06/2020 for the refurbishment and reconfiguration of selected areas of the Institute of Education comprising: repairs and installation of insulation to the external terraces; creation of a new plant room at Level 8 Wing A and installation of new louvres to serve this plant room; refurbishment and repairs to the lobby roof on level 4 and the roof at Level 10; installation of new external gate at Level 5 of Wing A; and associated works.

    Granted Full applications 5 docs
  • Institute of Education 20 Bedford Way London WC1H 0AL

    2024/3644/L 0m away

    Internal works comprising reconfiguration and refurbishment of Levels 5-9 Core A nib and wing, Level 6 wing A Lawton Room, Level 1 plantroom, Level 4 Room 426, Level 5 Zone C and Levels 1, 3 and 4 foyers; replacement mezzanine levels to selected rooms at Levels 2 and 3 in Core C and Levels 4 and 5; creation of new plant room at Level 8 wing A; new post room to Level 4; installation of platform lifts at Level 3 and 4 foyers; installation of fixed furniture and security gates in foyers; replacement of doors to the IALs building at Levels 4-9; infill of Level 1 drama hall window; replacement of existing halls signage with new digital signage at Levels 1-9 Cores A and B, Level 3 and 4 Zone B and Level 5 Zone C; and other associated internal works. External works comprising a new extended entrance at Bedford Way; a reconfigured entrance at Thornhaugh Mews; alterations to roof plant enclosure and new chiller unit; repairs and installation of insulation to external Levels 6-9 terraces; installation of secondary glazing to selected panels; new louvres at Level 8 wing A; smoke ventilation panels along Bedford Way elevation; refurbishment and repairs to Level 4 and 10 roof; new external gate at Level 5 wing A; replacement rooflights at Level 4; external beacons at Level 6 and 10 roof; and other associated external works

    Granted Heritage and listed buildings Extension Loft or dormer +1
  • Institute of Education 20 Bedford Way London WC1H 0AL

    2014/1033/A 0m away

    Display of 1x non illuminated fascia sign on the west elevation, 2 x acrylic panels signs on east elevation and 3 x free standing signs within flowerbed on west side.

    Granted
  • University Of London Institute Of Education 20 Bedford Way London Camden WC1H 0AL

    2022/1998/L 0m away

    The Discharge of Condition 6 a) (Sample Panel) (ref: 2021/6242/L granted 02/03/2022) For: Refurbishment and reconfiguration of selected areas within the IoE, No. 20 Bedford Way.

    Granted Heritage and listed buildings
  • Institute of Education 20 Bedford Way London WC1H 0AL

    2014/1034/L 0m away

    Display of 1x non illuminated fascia sign on the west elevation, 2 x acrylic panels signs on east elevation and 3 x free standing signs within flowerbed on west side.

    Granted Heritage and listed buildings
  • 20 Bedford Way London WC1H 0AL

    2010/5549/L 0m away

    Internal works at 2nd floor level to create a new mezzanine level and associated internal alterations.

    Granted Heritage and listed buildings

In Camden

  • 2026/2516/P Withdrawn

    31 Loveridge Road London Camden NW6 2DU

    Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.

    16 Jun 2026 Full applications
  • 2026/3830/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    4 Sep 2026 Full applications
  • 2026/3282/P Granted

    5 Berkley Road London NW1 8XX

    Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)

    31 Jul 2026 Full applications
  • 2026/0483/P Granted

    100 Avenue Road London NW3 3HF

    Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”

    9 Feb 2026 Full applications
  • 2026/2697/P Awaiting decision

    Flat 1, 73 Eton Avenue London NW3 3EU

    Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.

    3 Sep 2026 Full applications