Skip to content
PlanIndex Get alerts
Menu

Planning application

Junction of Abbey Road and Belsize Road London NW6 4DP

Granted Camden 2019/0696/P Full applications

Relates to 2016/4578/P, 2013/4678/P, 2017/2523/P

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Variation of conditions 4 (Implementation of Phase 2), 5 (Implementation of Phase 3), 14 (play space) and 60 (CHP) of application reference 2013/4678/P dated 16/05/14 as amended by 2016/4578/P and 2017/2523/P for hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters). Variation namely to change the trigger for providing the playspace to until February 2022 and to amend the type of CHP.

As published by the council, reference 2019/0696/P

Application record

Reference
2019/0696/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
9 Dec 2020
Postcode
NW6 4DP

Site history

Applications at this address on the Camden register

This site has had 3 applications since 2020: 3 approved, 0 refused.

  • 2022/1706/P Granted

    Junction of Abbey Road and Belsize Road London NW6 4DP

    Details pursuant to Condition 14 (Play Spaces) granted under reference 2013/4678/P dated 16/05/14 as varied by reference 2019/0696/P dated 09/12/20 for hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters).

    Decided 15 Sep 2022 Full applications
  • 2019/5184/P Granted

    Junction of Abbey Road and Belsize Road London NW6 4DP

    Discharge of Conditions 12 (Car Park Management Plan), 78 (Residential Travel Plan) and 79 (Workplace Travel Plan) granted under reference 2013/4678/P dated 16/05/14 for Hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters). Full details provided for Phase 1 comprising: up to 141 residential units (including up to 66 affordable units) in a 14 storey tower and 6 storey block, with 522.5 sq m of retail floorspace (Class A1) and 398.9 sq m of flexible commercial floorspace (Classes A1-A5 and B1) at ground floor and associated space for parking, plant, servicing, ancillary storage and energy centre at basement level. Phase 1 includes open space and landscaping, alterations to existing highway layout and creation of new access routes, following demolition of the Belsize Road car park building. Phase 2 to comprise up to 2,500 sq m of community and health uses (Class D1) and up to 126sqm of office space (Class B1) in a two storey building following demolition of existing high level walkways. Phase 3 to comprise up to 85 residential flats in 6/7 storey blocks and 15 mews houses (including up to 48 affordable units), up to 120sqm of office space (Class B1) and up to 645sqm of flexible commercial floorspace (Classes A1-A5) and associated ancillary space for parking, plant and servicing in basement. Phases 2 and 3 include open space, landscaping, alterations to existing highway layout and new access routes. Phase 3 to follow demolition of the Abbey Community Centre and Hinstock and Emminster blocks including Belsize Priory Health and Medical centre, residential and commercial units and site-wide walkways.

    Decided 7 Aug 2020 Full applications

Timeline

Dates from the published record

  1. 9 Dec 2020

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2016/4578/P Granted

    Abbey Co-Op Housing Sites at Casterbridge, Snowman Emminster and Hinstock and Abbey Co-Op Community Centre and Belsize Road Car Park, Abbey Road London NW6 4DP

    Variations to Conditions 6 (Phase 1:Approved drawings), 11 (Phase 1: Refuse and recycling) and 81 (Plant areas) of planning permission 2013/4678/P (for comprehensive redevelopment of site) granted on 16/05/14, as amended by permissions 2015/1636/P granted on 08/06/2015 (amendments to Condition 31 quantum of Phase 3 housing), 2015/1958/p granted on 17/06/2015 (amendments to Condition 75 car capping) and 2015/5417/P granted on 10/11/2015 (amendments to condition 74 car parking); to include amendments relating to altering substation and refuse store locations, installation of plant at 12th floor and minor alterations to elevations at ground and upper floors and rear boundary wall.

    Decided 11 May 2017 Full applications
  • 2013/4678/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters). Full details provided for Phase 1 comprising: up to 141 residential units (including up to 66 affordable units) in a 14 storey tower and 6 storey block, with 522.5 sq m of retail floorspace (Class A1) and 398.9 sq m of flexible commercial floorspace (Classes A1-A5 and B1) at ground floor and associated space for parking, plant, servicing, ancillary storage and energy centre at basement level. Phase 1 includes open space and landscaping, alterations to existing highway layout and creation of new access routes, following demolition of the Belsize Road car park building. Phase 2 to comprise up to 2,500 sq m of community and health uses (Class D1) and up to 126sqm of office space (Class B1) in a two storey building following demolition of existing high level walkways. Phase 3 to comprise up to 85 residential flats in 6/7 storey blocks and 15 mews houses (including up to 48 affordable units), up to 120sqm of office space (Class B1) and up to 645sqm of flexible commercial floorspace (Classes A1-A5) and associated ancillary space for parking, plant and servicing in basement. Phases 2 and 3 include open space, landscaping, alterations to existing highway layout and new access routes. Phase 3 to follow demolition of the Abbey Community Centre and Hinstock and Emminster blocks including Belsize Priory Health and Medical centre, residential and commercial units and site-wide walkways.

    Decided 16 May 2014 Full applications
  • 2017/2523/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Variation of conditions 6, 10, 20, 26, 93 and 94 relating to Phase 1 of planning permission, 2013/4678/P (for comprehensive redevelopment of site) granted on 16/05/14. The amendments are namely; - changing glazed brickwork at residential entrances from green to red, - changing design of metal balustrades, privacy screens and soffits - Elevational amendments - Changing railway boundary from timber to brick with railings - Additional photo-voltaic panels - Addition of brick vents - Changing the trigger for conditions 93 & 94.

    Decided 12 Apr 2018 Full applications

1 later application on the register refers to this one:

  • 2022/1706/P Granted

    Junction of Abbey Road and Belsize Road London NW6 4DP

    Details pursuant to Condition 14 (Play Spaces) granted under reference 2013/4678/P dated 16/05/14 as varied by reference 2019/0696/P dated 09/12/20 for hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters).

    Decided 15 Sep 2022 Full applications

What this grant of permission means

Camden granted permission on 9 December 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Junction of Abbey Road and Belsize Road London NW6 4DP

    2022/1706/P 0m away

    Details pursuant to Condition 14 (Play Spaces) granted under reference 2013/4678/P dated 16/05/14 as varied by reference 2019/0696/P dated 09/12/20 for hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters).

    Granted Full applications
  • Abbey Estate 3 Abbey Road London NW6 4DX

    2025/2414/P 0m away

    91% historically approved

    Non-material amendments to planning permission 2022/2542/P dated 03/03/2023 (for Demolition and redevelopment of Emminster and Hinstock blocks including Belsize Priory Health Centre, Abbey Community Centre, public house and commercial units to provide new residential accommodation (Use Class C3) and ground floor commercial space (Use Class E) to be used as flexible commercial units, across three buildings ranging from 4 to 11 storeys, along with car and bicycle parking, landscaping and all necessary ancillary and enabling works), namely: to vary security certificate condition and amend design of elements such as: access routes; cycle storage; plant rooms and equipment; windows; boundaries, and; landscaping.

    Awaiting decision Full applications Demolition Windows or glazing
  • Abbey Estate 3 Abbey Road London NW6 4DX

    2024/0323/P Submitted 29 Jan 2024 0m away

    Details required to partially discharge condition 14 (point C) (archaeology) of planning permission 2022/2542/P dated 03/03/2023 for the demolition of and redevelopment of Emminster and Hinstock blocks to provide new residential accommodation and ground floor commercial space across three buildings ranging from 4 to 11 storeys.

    Granted Full applications Demolition 4 docs
  • Abbey Estate 3 Abbey Road London NW6 4DX

    2024/0753/P Submitted 26 Feb 2024 0m away

    Details required by condition 3 (detailed drawings/samples) of planning permission 2022/2542/P dated 03/03/2023 (Demolition of and redevelopment of Emminster and Hinstock blocks to provide new residential accommodation and ground floor commercial space across three buildings ranging from 4 to 11 storeys).

    Granted Full applications Demolition 25 docs
  • Junction of Abbey Road and Belsize Road London NW6 4DP

    2019/5184/P 0m away

    Discharge of Conditions 12 (Car Park Management Plan), 78 (Residential Travel Plan) and 79 (Workplace Travel Plan) granted under reference 2013/4678/P dated 16/05/14 for Hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters). Full details provided for Phase 1 comprising: up to 141 residential units (including up to 66 affordable units) in a 14 storey tower and 6 storey block, with 522.5 sq m of retail floorspace (Class A1) and 398.9 sq m of flexible commercial floorspace (Classes A1-A5 and B1) at ground floor and associated space for parking, plant, servicing, ancillary storage and energy centre at basement level. Phase 1 includes open space and landscaping, alterations to existing highway layout and creation of new access routes, following demolition of the Belsize Road car park building. Phase 2 to comprise up to 2,500 sq m of community and health uses (Class D1) and up to 126sqm of office space (Class B1) in a two storey building following demolition of existing high level walkways. Phase 3 to comprise up to 85 residential flats in 6/7 storey blocks and 15 mews houses (including up to 48 affordable units), up to 120sqm of office space (Class B1) and up to 645sqm of flexible commercial floorspace (Classes A1-A5) and associated ancillary space for parking, plant and servicing in basement. Phases 2 and 3 include open space, landscaping, alterations to existing highway layout and new access routes. Phase 3 to follow demolition of the Abbey Community Centre and Hinstock and Emminster blocks including Belsize Priory Health and Medical centre, residential and commercial units and site-wide walkways.

    Granted Full applications New dwelling Demolition
  • Abbey Estate Phase 3 (Emminster & Hinstock and Abbey Co-op Community Centre) Abbey Road London Camden NW6 4DX

    2025/3537/P Submitted 22 Sep 2025 0m away

    91% historically approved · decision due ~17 Nov

    Variation to conditions 2 and 27 of planning permission ref. 2022/2542/P (Demolition and redevelopment of Emminster and Hinstock blocks including Belsize Priory Health Centre, Abbey Community Centre, public house and commercial units to provide new residential accommodation (Use Class C3) and ground floor commercial space (Use Class E) to be used as flexible commercial units, across three buildings ranging from 4 to 11 storeys, along with car and bicycle parking, landscaping and all necessary ancillary and enabling works); namely to amend the affordable housing types.

    Awaiting decision Full applications Demolition 1 doc

In Camden

  • 2026/2516/P Withdrawn

    31 Loveridge Road London Camden NW6 2DU

    Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.

    16 Jun 2026 Full applications
  • 2026/3830/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    4 Sep 2026 Full applications
  • 2026/3282/P Granted

    5 Berkley Road London NW1 8XX

    Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)

    31 Jul 2026 Full applications
  • 2026/0483/P Granted

    100 Avenue Road London NW3 3HF

    Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”

    9 Feb 2026 Full applications
  • 2026/2697/P Awaiting decision

    Flat 1, 73 Eton Avenue London NW3 3EU

    Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.

    3 Sep 2026 Full applications