Planning application
10-11 King's Mews London WC1N 2HZ
Works: New dwelling
Relates to 2017/4543/P
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Details pursuant to conditions 5 (mechanical ventilation), 6 (NO2 scrubbing system), 8 (sound insulation) and 11 (photovoltaic cells) of planning permission ref. 2017/4543/P dated 16/10/2018 for: Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
As published by the council, reference 2018/5030/P
Application record
- Reference
- 2018/5030/P
- Category
- Full applications
- Status
- Final Decision
- Decision
- Granted
- Decided
- 6 Mar 2019
- Postcode
- WC1N 2HZ
Site history
Applications at this address on the Camden register
This site has had 6 applications since 2018: 6 approved, 0 refused.
-
2018/5690/P Granted
10-11 King's Mews London WC1N 2HZ
Variation of conditions 2(drawing numbers) and 14 (sustainability) of permission ref: 2017/4543/P dated 16/10/2018 for (Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats); CHANGES include installation of external lighting and revised sustainability report
-
2018/5009/P Granted
10-11 King's Mews London WC1N 2HZ
Details pursuant to condition 3 (facing materials) of planning permission ref. 2017/4543/P dated 16/10/2018 for: Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
-
2018/5011/P Granted
10-11 King's Mews London WC1N 2HZ
Details pursuant to condition 10 (Refuse) of planning permission ref. 2017/4543/P dated 16/10/2018 for: Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
-
2018/5046/P Granted
10-11 King's Mews London WC1N 2HZ
Details pursuant to condition 13 (Green Roof) of planning permission ref. 2017/4543/P dated 16/10/2018 for: Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
-
2017/4543/P Granted
10-11 King's Mews LONDON WC1N 2HZ
Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
Timeline
Dates from the published record
-
6 Mar 2019
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
2017/4543/P Granted
10-11 King's Mews LONDON WC1N 2HZ
Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
What this grant of permission means
Camden granted permission on 6 March 2019, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
10-11 King's Mews London WC1N 2HZ
Details pursuant to condition 13 (Green Roof) of planning permission ref. 2017/4543/P dated 16/10/2018 for: Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
Granted Full applications New dwelling -
10-11 King's Mews London WC1N 2HZ
Variation of conditions 2(drawing numbers) and 14 (sustainability) of permission ref: 2017/4543/P dated 16/10/2018 for (Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats); CHANGES include installation of external lighting and revised sustainability report
Granted Full applications New dwelling -
10-11 King's Mews London WC1N 2HZ
Details pursuant to condition 10 (Refuse) of planning permission ref. 2017/4543/P dated 16/10/2018 for: Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
Granted Full applications New dwelling -
10-11 King's Mews London WC1N 2HZ
Details pursuant to condition 3 (facing materials) of planning permission ref. 2017/4543/P dated 16/10/2018 for: Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
Granted Full applications New dwelling -
10-11 King's Mews LONDON WC1N 2HZ
Erection of three storey plus basement building to provide 1 x1 bed, 2 x 2 bed and 2 x 3 bed flats
Granted Full applications New dwelling -
10-11 Kings Mews LONDON WC1N 2ES
Details of conditions 3 (Facing materials), 4 (entrances, balustrading & fenestration), and 7 (cycle storage) of planning permission granted on 17th June 2014 (Ref 2012/6315/P) for Partial demolition of rear office extension at lower ground and ground floors and the erection of a new single family dwelling house fronting King's Mews.
Granted Full applications Extension Demolition +1Domestic
Other full applications
In Camden
-
2026/2516/P Withdrawn
31 Loveridge Road London Camden NW6 2DU
Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.
-
2026/3830/P Awaiting decision
Euston Tower 286 Euston Road London NW1 3DP
Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.
-
2026/3282/P Granted
5 Berkley Road London NW1 8XX
Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)
-
2026/0483/P Granted
100 Avenue Road London NW3 3HF
Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”
-
2026/2697/P Awaiting decision
Flat 1, 73 Eton Avenue London NW3 3EU
Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.