Planning application
12 Village Close London NW3 5AH
Works: Extension Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of rear single storey extension. Garage conversion involving the replacement of the garage door with new windows. Replacement front/rear windows and alterations to the external cladding.
As published by the council, reference 2017/6576/P
Application record
- Reference
- 2017/6576/P
- Category
- Full applications
- Status
- Final Decision
- Decision
- Granted
- Decided
- 22 Jan 2018
- Postcode
- NW3 5AH
Timeline
Dates from the published record
-
22 Jan 2018
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What this grant of permission means
Camden granted permission on 22 January 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
10 Village Close London NW3 5AH
Installation of rooflight to flat roof of front vestibule of dwellinghouse (C3)
Granted Full applications Loft or dormerDomestic -
14 Village Close London NW3 5AH
(TPO Ref: 23H) FRONT GARDEN: 1 x Horse Chestnut - Crown thin by 30%, crown reduce by 20% and reshape accordingly.
Granted Trees -
14 Village Close Belsize Lane London NW3 5AH
(TPO REF: 23H-T74) FRONT GARDEN: 1 x Horse chestnut (T1) - Reduce crown back to previous cuts, (1.5m - 2m off).
Granted Trees 4 docs -
9 Village Close Belsize Lane London NW3 5AH
DD 5 Day Notice REAR GARDEN: 1 x Silver Birch (T1) - Fell to ground level.
Granted Trees -
9 Village Close Belsize Lane London NW3 5AH
REAR GARDEN: 1 x Walnut (Juglans nigra) T1) - Reduce crown by 30%, (3.5m) to suitable growth points. Reduce lateral spread on outbound side by up to 4m - 5m to restore balance. Reduce lateral spread on inbound side by (up to 2m).
Granted Trees -
16 Village Close Belsize Lane London NW3 5AH
Erection of single storey first floor extension over existing ground floor side extension and installation of new front door and replacement window at ground floor
Granted Full applications Extension Windows or glazingSmall domestic
Other full applications
In Camden
-
2026/3898/P Awaiting decision
98 Marchmont Street London WC1N 1AG
Installation of a new kitchen extraction and ventilation system to the rear of the premises, including associated external ductwork, extraction plant and ancillary equipment.
-
2026/2709/P Awaiting decision
166A Camden Street London NW1 9PT
Change of use from Use Class E to C3 Residential, demolition of existing store and office space, and erection of a three-bedroom dwellinghouse.
-
2026/3994/P Awaiting decision
Euston Tower 286 Euston Road London NW1 3DP
Details to discharge Condition 23 (LUL Subculture) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.
-
2026/3993/P Awaiting decision
Euston Tower 286 Euston Road London NW1 3DP
Details to discharge Condition 22 (LUL Infrastructure) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.
-
2026/3861/P Awaiting decision
Beaumont Court 1-45 College Grove London NW1 0RW
Installation of condensors and minor alterations to elevations at lower floors.