Skip to content
PlanIndex Get alerts
Menu

Planning application

200 Kilburn High Road London NW6 4JD

Granted Camden 2017/4811/P Full applications

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of replacement shopfront, external ventilation extract duct within first floor rear void and 2 air-conditioning units on fourth floor flat roof, in association with the change of use of ground floor unit from citizens advice bureau (Class A2) to shop, internet cafe and sandwich bar (Class A1) (retrospective).

As published by the council, reference 2017/4811/P

Application record

Reference
2017/4811/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
14 Jan 2021
Postcode
NW6 4JD

Site history

Applications at this address on the Camden register

This site has had 6 applications since 2014: 3 approved, 1 refused.

  • 2015/2328/P Granted

    200 Kilburn High Road London NW6 4JD

    Erection of a part two, part three storey rear extension and external alterations to create 2 x 1 bedroom flats, 1 x 2 bedroom & 1 x Studios.

    Decided 22 Sep 2015 Full applications
  • 2015/0427/P Granted

    200 Kilburn High Road London NW6 4JD

    Change of use from (B1) offices on the 1st, 2nd and 3rd floor to 4 studio flats (C3).

    Decided 25 Mar 2015 Full applications
  • 2014/7294/P Withdrawn

    200 Kilburn High Road London NW6 4JD

    Change of use from Office (B1) to Residential (C3) providing 4 studio flats.

    Decided 28 Jan 2015 Full applications
  • 2014/5291/P Withdrawn

    200 Kilburn High Road London NW6 4JD

    Change of use from offices (Class B1) to provide 4 studio flats (Class C3) at 1st, 2nd and 3rd floor levels.

    Decided 26 Sep 2014 Full applications
  • 2014/2071/P Refused

    200 Kilburn High Road London NW6 4JD

    Change of use from offices (Class B1) to provide 4 studio flats (Class C3) at 1st, 2nd and 3rd floor levels.

    Decided 9 Jun 2014 Full applications

Timeline

Dates from the published record

  1. 14 Jan 2021

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

What this grant of permission means

Camden granted permission on 14 January 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Camden

  • 2026/3898/P Awaiting decision

    98 Marchmont Street London WC1N 1AG

    Installation of a new kitchen extraction and ventilation system to the rear of the premises, including associated external ductwork, extraction plant and ancillary equipment.

    16 Sep 2026 Full applications
  • 2026/2709/P Awaiting decision

    166A Camden Street London NW1 9PT

    Change of use from Use Class E to C3 Residential, demolition of existing store and office space, and erection of a three-bedroom dwellinghouse.

    16 Sep 2026 Full applications
  • 2026/3994/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 23 (LUL Subculture) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    15 Sep 2026 Full applications
  • 2026/3993/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 22 (LUL Infrastructure) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    15 Sep 2026 Full applications
  • 2026/3861/P Awaiting decision

    Beaumont Court 1-45 College Grove London NW1 0RW

    Installation of condensors and minor alterations to elevations at lower floors.

    15 Sep 2026 Full applications