Planning application
124 Holborn London EC1N 2QX
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Display of internally illuminated lettering ATM surround.
As published by the council, reference 2017/3886/A
Application record
- Reference
- 2017/3886/A
- Status
- Final Decision
- Decision
- Granted
- Decided
- 22 Aug 2017
- Postcode
- EC1N 2QX
Timeline
Dates from the published record
-
22 Aug 2017
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What this grant of permission means
Camden granted permission on 22 August 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Camden's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Sir Christopher Hatton PH 4 Leather Lane London EC1N 7RA
Installation of replacement external lanterns over the entrances, external lanterns and heaters to columns, a replacement amenity board and general refurbishment of the front facade.
Granted Full applications -
120 Holborn London EC1N 2TD
Variation of condition 3 (approved plans) of planning permission 2014/2782/P dated 20/08/2015 (for change of use of part-basement from office and retail to leisure centre and light industrial) namely to remove reference to a swimming pool.
Withdrawn Full applications -
1 Leather Lane London EC1N 2TD
Display of 1 x internally illuminated fascia sign and 1 x internally illuminated projecting sign in association with ground floor commercial unit.
Granted -
121 Holborn London EC1N 2TD
Use of basement as a table tennis centre with ancillary cafe (Class D2) and installation of extract duct to rear courtyard.
Granted Full applications -
120 Holborn London Camden EC1N 2TD
91% historically approved · decision due ~16 Oct
Extensions and alterations including: removal of rooftop plant and the addition of an additional storey on the west side (adjacent to Leather Lane) and the retention of 10 storeys, with rooftop plant and terraces atop on the east side (Holborn/Hatton Garden). Facade renewal (replacement of stone cladding with metal cladding and replacement window (bays), provision of new balconies on Holborn Circus elevation. Reconfigurations to provide extended commercial and retail floorspace (Class E) on the ground floor and to re-provide affordable jewellery workspace and competitive socialising (sui generis)/Class E space on the lower ground floor. Reconfiguration of entrances and servicing arrangements, new hard and soft landscaping, provision of cycle parking and other ancillary works.
Awaiting decision Full applications Extension Windows or glazing 89 docs -
Footway adjacent to 120 Holborn London EC1
Details of the treatment of highway surface pursuant to Condition 4 of permission dated 03/07/2009 (2009/2105/P) for installation on footway of 3 cycle hire docking stations including a registration/payment terminal and maximum of 40 docking points for bicycles, in connection with the Transport for London Cycle Hire Scheme
Withdrawn Full applications