Planning application
Congress House 23-28 Great Russell Street London WC1B 3LN
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Display of replaced brass finish lettering to two plinths.
As published by the council, reference 2017/3467/A
Application record
- Reference
- 2017/3467/A
- Status
- Final Decision
- Decision
- Granted
- Decided
- 16 Aug 2017
- Postcode
- WC1B 3LN
Site history
Applications at this address on the Camden register
This site has had 11 applications since 2015: 11 approved, 0 refused.
-
2018/2907/L Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Reconfiguration of toilets and kitchen area on the 5th Floor.
-
2017/3468/L Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Alterations to display 5 internally applied vinyl signs and replacement of existing brass finish lettering to two plinths.
-
2017/2859/L Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Discharge of Condition 5a) Glass screen details (ref:2016/3882/L) granted 15/12/2017 for the refurbishment of the Southside Offices of Congress House.
-
2017/2302/L Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Refurbishment of the Congress Centre lower ground break out space and the cloakroom and toilet areas along with the refurbishment of a sixth floor tenant office space
-
2017/0903/L Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Details of historic fabric (condition 4), Bainbridge House entrance details (condition 5b) and coloured glazing system (condition 5c) required by conditions of permission granted on 15/12/2016 (ref: 2016/3882/L for the alterations to Bainbridge Street entrance area including installation of glazed screen; refurbishment of reception area and offices at ground, second, third, fourth, fifth and sixth floor levels including removal of some internal partitions; rearrangement at basement level to provide facilities and servicing; other external alterations.)
-
2016/3273/P Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Various alterations along Bainbridge Street and Dyott Street elevations including refurbishment of entrance area and installation of glazed screen along Dyott Street; replacement of plant at roof level
-
2016/3882/L Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Alterations to Bainbridge Street entrance area including installation of glazed screen; refurbishment of reception area and offices at ground, second, third, fourth, fifth and sixth floor levels including removal of some internal partitions; rearrangement at basement level to provide facilities and servicing; other external alterations
-
2016/4039/L Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Internal alterations to office space at third and fourth floor levels including removal of partition walls
-
2015/2268/L Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Removal of the glass over-cladding to the Conference Hall roof, installed in 1996, to reveal the original glazed hexagonal roof. Removal of black metal mesh to Council Chamber glazing on West side. Installation of a lightweight ETFE canopy over the courtyard to protect the original Conference Hall roof and Jacob Epstein sculpture from further deterioration. Refurbishment of 6th floor balconies. Replacing the existing bronze balustrades to the Dyott Street balconies to incorporate bronze framed laminated toughened glass panels.
-
2014/7630/P Granted
Congress House 23-28 Great Russell Street London WC1B 3LN
Removal of the glass over-cladding to the Conference Hall roof, installed in 1996, to reveal the original glazed hexagonal roof. Removal of black metal mesh to Council Chamber glazing on West side. Installation of a lightweight ETFE canopy over the courtyard to protect the original Conference Hall roof and Jacob Epstein sculpture from further deterioration. Refurbishment of 6th floor balconies. Replacing the existing bronze balustrades to the Dyott Street balconies to incorporate bronze framed laminated toughened glass panels, following an incident involving the failure of an original glazed panel falling to street level.
Timeline
Dates from the published record
-
16 Aug 2017
Decision issued: Granted
-
22 Jul 2026
Added to PlanIndex
What this grant of permission means
Camden granted permission on 16 August 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Camden's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
Congress House 23-28 Great Russell Street London WC1B 3LS
Use of the building as a mixed institution use (Sui Generis).
Granted Full applications -
23-28 CONGRESS HOUSE GREAT RUSSELL STREET LONDON WC1B 3LS
Alterations to the tiled plinth on East side of main entrance, with mosaic tile facing to be refurbished. Replacement of glass block lighting feature and brass plaque with brass clad plinth.
Granted Full applications -
Congress House 23-28 Great Russell Street London WC1B 3LN
Removal of the glass over-cladding to the Conference Hall roof, installed in 1996, to reveal the original glazed hexagonal roof. Removal of black metal mesh to Council Chamber glazing on West side. Installation of a lightweight ETFE canopy over the courtyard to protect the original Conference Hall roof and Jacob Epstein sculpture from further deterioration. Refurbishment of 6th floor balconies. Replacing the existing bronze balustrades to the Dyott Street balconies to incorporate bronze framed laminated toughened glass panels, following an incident involving the failure of an original glazed panel falling to street level.
Granted Full applications Windows or glazing -
Ground & Fourth Floors Congress House 23 Great Russell Street London WC1B 3LS
Internal alterations to include installation of security gates and new ceiling lighting to replace existing at ground floor, and installation of new glazed partition and new door opening in existing wall to provide access from adjacent lift lobby in fourth floor office, all in connection with existing ground and fourth floor offices.
Granted Heritage and listed buildings Windows or glazing -
Congress House 23-28 Great Russell Street London WC1B 3LS
Installation of an electric vehicle charging point
Granted Heritage and listed buildings -
Ground Floor Congress House 23-28 Great Russell Street London WC1B 3LS
Installation of air conditioning units within the external courtyard on western façade of Congress House and internal alterations all in connection with existing ground floor level offices (Class B1).
Granted Heritage and listed buildings