Skip to content
PlanIndex Get alerts
Menu

Planning application

Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

Granted Camden 2017/1410/P Full applications

Relates to 2013/4678/P

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details pursuant to part Condition 21 (Phase 1 - Telecoms impact) of planning permission 2013/4678/P, dated 16/05/2014 for hybrid application for phased redevelopment of site.

As published by the council, reference 2017/1410/P

Application record

Reference
2017/1410/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
21 Jan 2020
Postcode
NW6 4DP

Site history

Applications at this address on the Camden register

This site has had 34 applications since 2012: 30 approved, 0 refused.

  • 2021/3078/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Details pursuant to part Condition 21 (Phase 1 - Telecoms impact part 3) of planning permission 2013/4678/P, dated 16/05/2014 for hybrid application for phased redevelopment of site.

    Decided 17 Sep 2021 Full applications
  • 2019/4890/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Discharge of Condition 94 (BREEAM Certification) granted under planning reference 2013/4678/P dated16/05/14 for hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters). Full details provided for Phase 1 comprising: up to 141 residential units (including up to 66 affordable units) in a 14 storey tower and 6 storey block, with 522.5 sq m of retail floorspace (Class A1) and 398.9 sq m of flexible commercial floorspace (Classes A1-A5 and B1) at ground floor and associated space for parking, plant, servicing, ancillary storage and energy centre at basement level. Phase 1 includes open space and landscaping, alterations to existing highway layout and creation of new access routes, following demolition of the Belsize Road car park building. Phase 2 to comprise up to 2,500 sq m of community and health uses (Class D1) and up to 126sqm of office space (Class B1) in a two storey building following demolition of existing high level walkways. Phase 3 to comprise up to 85 residential flats in 6/7 storey blocks and 15 mews houses (including up to 48 affordable units), up to 120sqm of office space (Class B1) and up to 645sqm of flexible commercial floorspace (Classes A1-A5) and associated ancillary space for parking, plant and servicing in basement. Phases 2 and 3 include open space, landscaping, alterations to existing highway layout and new access routes. Phase 3 to follow demolition of the Abbey Community Centre and Hinstock and Emminster blocks including Belsize Priory Health and Medical centre, residential and commercial units and site-wide walkways.

    Decided 14 Feb 2020 Full applications
  • 2015/7205/P Withdrawn

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Submission of details in respect to Phase 3 of Outline Planning Permission 2013/4678/P, dated 16 May 2014, as amended by 2015/1501/P for demolition of the Abbey Community Centre, Hinstock and Emminster block and Belsize Health and Medical Centre, residential and commercial units and side walkways. Submission relates to Phase 3 of the development and will comprise up to 85 new residential flats in 6/7 storey blocks alongside 15 mews houses (including up to 48 affordable units), up to 345.5sqm of office space (Class B1) and up to 335.9sqm of flexible commercial floorspace (Classes A1-A5) and associated ancillary space for parking, plant and servicing in basement with minor alterations to existing highway layout and new access routes. (Submission relates to the discharge of Reserved Matters under Condition 3 together with the discharge of Conditions 3, 27, 28, 29, 30, 31, 32, 33, 36, 37,46, 52, 57, 58, 59, 61, 63, 66, 81 and 82).

    Decided 18 Sep 2019 Full applications
  • 2017/1201/P Withdrawn

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Details pursuant to Condtion 60 (CHP) of planning permission 2013/4678/P dated 16/05/14 for hybrid application for phased redevelopment of site.

    Decided 8 Apr 2019 Full applications
  • 2018/3962/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Details of community safety in relation to condition 23 (Phase 1) of planning permission 2013/4678/P dated 16/05/2014 for hybrid application for phased redevelopment of site.

    Decided 21 Dec 2018 Full applications
  • 2018/3963/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Details of reporting and management of significant additional contamination in relation to condition 88 (Phase 1) of planning permission 2013/4678/P dated 16/05/2014 for hybrid application for phased redevelopment of site.

    Decided 5 Oct 2018 Full applications
  • 2018/1522/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Details of green roof in relation to condition 18 (Phase 1) and details of level plans in relation to condition 80 (Phases 2 and 3) of planning permission 2013/4678/P dated 16/05/2014 for hybrid application for phased redevelopment of site. (Note - section 73 application currently live).

    Decided 1 Aug 2018 Full applications
  • 2017/2523/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Variation of conditions 6, 10, 20, 26, 93 and 94 relating to Phase 1 of planning permission, 2013/4678/P (for comprehensive redevelopment of site) granted on 16/05/14. The amendments are namely; - changing glazed brickwork at residential entrances from green to red, - changing design of metal balustrades, privacy screens and soffits - Elevational amendments - Changing railway boundary from timber to brick with railings - Additional photo-voltaic panels - Addition of brick vents - Changing the trigger for conditions 93 & 94.

    Decided 12 Apr 2018 Full applications
  • 2017/5551/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Details of brickwork, mortar joints and bronze metal cladding finish required by condition 26 parts (a), (b), (c) & (d) for Phase 1 of planning permission 2013/4678/P dated 16/05/2014 for hybrid application for phased redevelopment of site.

    Decided 22 Feb 2018 Full applications
  • 2017/0780/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Details pursuant to Condition 71 (slab levels for Phase 1) of planning permission ref 2013/4678/P (dated 16/05/2014) for phased redevelopment of site.

    Decided 18 Jul 2017 Full applications

Timeline

Dates from the published record

  1. 21 Jan 2020

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2013/4678/P Granted

    Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    Hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters). Full details provided for Phase 1 comprising: up to 141 residential units (including up to 66 affordable units) in a 14 storey tower and 6 storey block, with 522.5 sq m of retail floorspace (Class A1) and 398.9 sq m of flexible commercial floorspace (Classes A1-A5 and B1) at ground floor and associated space for parking, plant, servicing, ancillary storage and energy centre at basement level. Phase 1 includes open space and landscaping, alterations to existing highway layout and creation of new access routes, following demolition of the Belsize Road car park building. Phase 2 to comprise up to 2,500 sq m of community and health uses (Class D1) and up to 126sqm of office space (Class B1) in a two storey building following demolition of existing high level walkways. Phase 3 to comprise up to 85 residential flats in 6/7 storey blocks and 15 mews houses (including up to 48 affordable units), up to 120sqm of office space (Class B1) and up to 645sqm of flexible commercial floorspace (Classes A1-A5) and associated ancillary space for parking, plant and servicing in basement. Phases 2 and 3 include open space, landscaping, alterations to existing highway layout and new access routes. Phase 3 to follow demolition of the Abbey Community Centre and Hinstock and Emminster blocks including Belsize Priory Health and Medical centre, residential and commercial units and site-wide walkways.

    Decided 16 May 2014 Full applications

What this grant of permission means

Camden granted permission on 21 January 2020, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land surrounding Snowman House and Casterbridge Belsize Road London NW6 4DP

    2020/5649/P Submitted 3 Dec 2020 0m away

    Details required by condition 6 (Air Quality Monitoring) of planning permission reference 2020/2486/P dated 27/11/20 (for construction of a new health and community centre, relocation of existing residential car park, along with landscaping, associated access, demolition of link bridge between Phases 2 and 3, and cycle parking).

    Granted Full applications Demolition 10 docs
  • Land located at the junction of Abbey Road and Belsize Road, including the Abbey Road Co-op Housing Estate and Belsize Road multi-storey car park.

    2012/5648/P 0m away

    Amendments to conditions 9 (matters reserved), 15 (residential privacy), 18 (refuse and recycling, 19i (play strategy), 20 (open space strategy), 21 (protection of trees), 23 (slab levels), 33 (servicing management plan), 34 (cycle parking), 35i & 35ii (public realm improvements), 40 (environmental improvements), 42 (level plans), 43 (car club bays), 45 (acoustic report), 47 (drainage & SUDs), 52 (biodiversity strategy), 54 (ducting and ventilation), 57 (contamination assessment), 58 (site investigation and submission of a remediation scheme), 61 (local wind environment), 62 (telecoms impact), 66 (KX working), 67 (archaeology), 69 (piling method statement), 70 (community safety), 71 (open space contribution), 72 (education) and 73 (Legal agreement) of planning permission dated 12/07/2012, ref 2012/0096/P (Outline application for phased redevelopment of site). Amendments relate to timing of submission of relevant details in order to allow enabling works of demolition.

    Granted Full applications Demolition Trees
  • Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    2017/2523/P 0m away

    Variation of conditions 6, 10, 20, 26, 93 and 94 relating to Phase 1 of planning permission, 2013/4678/P (for comprehensive redevelopment of site) granted on 16/05/14. The amendments are namely; - changing glazed brickwork at residential entrances from green to red, - changing design of metal balustrades, privacy screens and soffits - Elevational amendments - Changing railway boundary from timber to brick with railings - Additional photo-voltaic panels - Addition of brick vents - Changing the trigger for conditions 93 & 94.

    Granted Full applications Windows or glazing
  • Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    2013/4678/P 0m away

    Hybrid application for phased redevelopment of site, comprising detailed application for Phase 1 and outline application for layout and access only for Phases 2 and 3 (scale, appearance and landscaping are reserved matters). Full details provided for Phase 1 comprising: up to 141 residential units (including up to 66 affordable units) in a 14 storey tower and 6 storey block, with 522.5 sq m of retail floorspace (Class A1) and 398.9 sq m of flexible commercial floorspace (Classes A1-A5 and B1) at ground floor and associated space for parking, plant, servicing, ancillary storage and energy centre at basement level. Phase 1 includes open space and landscaping, alterations to existing highway layout and creation of new access routes, following demolition of the Belsize Road car park building. Phase 2 to comprise up to 2,500 sq m of community and health uses (Class D1) and up to 126sqm of office space (Class B1) in a two storey building following demolition of existing high level walkways. Phase 3 to comprise up to 85 residential flats in 6/7 storey blocks and 15 mews houses (including up to 48 affordable units), up to 120sqm of office space (Class B1) and up to 645sqm of flexible commercial floorspace (Classes A1-A5) and associated ancillary space for parking, plant and servicing in basement. Phases 2 and 3 include open space, landscaping, alterations to existing highway layout and new access routes. Phase 3 to follow demolition of the Abbey Community Centre and Hinstock and Emminster blocks including Belsize Priory Health and Medical centre, residential and commercial units and site-wide walkways.

    Granted Full applications New dwelling Demolition
  • Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    2015/4699/P 0m away

    Details pursuant to Condition 18 (Green roof specifications) of planning permission 2013/4678/P (for comprehensive redevelopment of site) granted on 16/05/14.

    Granted Full applications
  • Abbey Co-op housing sites at Casterbridge Snowman Emminster & Hinstock and Abbey Co-op Community Centre and Belsize Road car-park Abbey Road London NW6 4DP

    2015/3878/P 0m away

    Details pursuant to Condition 26 (a) and (b) (Phase 1 Sample Panels) of planning permission 2013/4678/P (for comprehensive phased redevelopment of site) granted on 16/05/2014

    Granted Full applications

In Camden

  • 2026/2516/P Withdrawn

    31 Loveridge Road London Camden NW6 2DU

    Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.

    16 Jun 2026 Full applications
  • 2026/3830/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    4 Sep 2026 Full applications
  • 2026/3282/P Granted

    5 Berkley Road London NW1 8XX

    Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)

    31 Jul 2026 Full applications
  • 2026/0483/P Granted

    100 Avenue Road London NW3 3HF

    Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”

    9 Feb 2026 Full applications
  • 2026/2697/P Awaiting decision

    Flat 1, 73 Eton Avenue London NW3 3EU

    Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.

    3 Sep 2026 Full applications