Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Tapestry Building 1 Canal Reach London N1C 4AZ

Granted Camden 2016/6059/P Full applications

Relates to 2014/4605/P

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Approval on details for condition 2 (F) 'finishes to be applied to the ground floor facade of the energy centre including any public art display and its relevant technologies and/or media to be installed if relevant' in connection to Reserved matters approval 2014/4605/P in connection with the erection of a ten to fifteen storey building within development T1.

As published by the council, reference 2016/6059/P

Application record

Reference
2016/6059/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
22 Dec 2016
Postcode
N1C 4AZ

Timeline

Dates from the published record

  1. 22 Dec 2016

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2014/4605/P Granted

    Building T1 King's Cross Central York Way London N1C

    Amendments to details of Reserved Matters granted on 22/03/2013 (ref: 2013/0405/P) for reserved matters in connection with the erection of a ten to fifteen storey building within development Zone T1 for uses comprising a 415 space multi-storey car park, a multi-use games area (MUGA), residential development totalling 129 units (95 private ownership, 22 affordable rent and 12 shared ownership), retail/café/bar uses (Classes A1-A4) together with associated ground floor terrace area and incorporating existing energy centre constructed under 2009/0415/P; and submission of associated details in compliance with conditions 6, 7, 9, 10, 12, 14, 16-24, 26, 27, 28, 31, 33-36, 39, 42, 42A, 43-46, 48, 49, 50, 50A, 51, 60, 61 and 64-67 of outline planning permission granted 22/12/2006 (ref 2004/2307/P) for a comprehensive, mixed-use development of former railway lands within the King's Cross Opportunity Area. Amendments relate to revision of the western façade to include enclosed glazed balconies; revised eastern facade balconies and windows; various amendments to floor plan layouts including roof plans; plant areas; multi-storey car park and some residential units; reconfiguration of waste storage and strategy arrangements; and increase of cycle spaces.

    Decided 10 Sep 2014 Full applications

What this grant of permission means

Camden granted permission on 22 December 2016, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Unit 1, Building T1 Canal Reach London N1C 4AZ

    2017/3237/P 0m away

    Temporary change of use for 2 years from flexible Class A1-A5 use to Class D2 use for use as rehearsal / workshop / meeting space

    Granted Full applications
  • Building T1 1 Canal Reach King's Cross London N1C 4AZ

    2020/0979/P 36m away

    Non-material amendment to development approved under permission 2013/0405/P dated 22/03/2013 (Reserved matters in connection with the erection of a ten to fifteen storey building within development Zone T1 for uses comprising a 418 space multi-storey car park, a multi-use games area (MUGA), residential development totalling 129 units (95 private ownership, 22 affordable rent and 12 shared ownership), retail/café/bar uses (Classes A1-A4), namely to change the approved cladding on the northern elevation, from the approved GRC (glass fibre reinforced concrete) to a bronze anodised finish.

    Granted Full applications New dwelling
    Major scheme
  • Plot S5, King's Cross Central Canal Reach London N1

    2015/1003/P 36m away

    Variation of Condition 2 attached to planning permission dated 15/01/2015 ref: 2014/7852/P to extend the hours of operation of the cafe from1000hrs to 1600hrs Wednesdays to Fridays and 1100hrs to 1600hrs every first Sunday of the month to 0800hrs to 2000hrs Mondays to Sundays.

    Granted Full applications
  • King's Cross Central Plot S5 Canal Reach London N1C 4AB

    2014/7946/P 36m away

    Erection of a two storey temporary structure to accommodate an office and welfare facility (Class B1), including a viewing platform at roof level and associated hard and soft landscaping and storage for a period of five years.

    Granted Full applications
  • Skip Garden Plot S5, King's Cross Central Canal Reach London N1

    2014/7852/P 36m away

    Erection of temporary structures in connection with use as an educational allotment garden (Class D1) and a cafe (Class A3) for a period of five years

    Granted Full applications
  • Buildings T2-T3 Development Zone T King's Cross Central London N1C 4BD

    2019/1850/P 37m away

    Details of all external materials and finishes and all windows and doors required by conditions 2a and 2b of reserved matters application reference 2016/3195/P dated 23/01/2017, as amended by 2019/0182/P dated 26/03/2019, (Reserved matters relating to Plots T2-T4 within Development Zone T for erection of two buildings, T2 (part 9, part 10 storeys) and T3 (part 10, part 12 storeys), for use as offices (Class B1) on upper floors, a primary health care centre in T2 (Class D1) at ground floor and flexible commercial/office/leisure units to ground and first floors (A1-A4/B1/D2) and a fuel cell to the south west corner of T2. Associated cycle and car parking, refuse store, storage and plant areas provided. Public realm works to the western side of Canal Reach).

    Granted Full applications Windows or glazing

In Camden

  • 2026/2516/P Withdrawn

    31 Loveridge Road London Camden NW6 2DU

    Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.

    16 Jun 2026 Full applications
  • 2026/3830/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    4 Sep 2026 Full applications
  • 2026/3282/P Granted

    5 Berkley Road London NW1 8XX

    Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)

    31 Jul 2026 Full applications
  • 2026/0483/P Granted

    100 Avenue Road London NW3 3HF

    Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”

    9 Feb 2026 Full applications
  • 2026/2697/P Awaiting decision

    Flat 1, 73 Eton Avenue London NW3 3EU

    Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.

    3 Sep 2026 Full applications