Skip to content
PlanIndex Get alerts
Menu

Planning application

Shop And Premises At Basement And Ground Floor 46 Birchington Road London NW6 4LJ

Granted Camden 2016/0654/P Full applications

Relates to 2014/5696/P

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Details of waste storage and removal required by condition 8 of planning permission granted on 23/12/2014 (reference: 2014/5696/P for the change of use of ground floor and basement from shop (Class A1) to restaurant (Class A3) including extract duct to roof at rear.)

As published by the council, reference 2016/0654/P

Application record

Reference
2016/0654/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
10 Jan 2017
Postcode
NW6 4LJ

Site history

Applications at this address on the Camden register

This site has had 4 applications since 2016: 2 approved, 1 refused.

  • 2016/0653/A Granted

    Shop And Premises At Basement And Ground Floor 46 Birchington Road London NW6 4LJ

    Display of internally illuminated fascia sign.

    Decided 21 Mar 2017
  • 2016/5627/P Refused

    Shop and Premises at Basement and Ground Floor 46 Birchington Road London NW6 4LJ

    Erection of timber enclosure and decking to forecourt of restaurant (Class A3) [retrospective].

    Decided 13 Jan 2017 Full applications
  • 2016/0652/P Withdrawn

    Shop And Premises At Basement And Ground Floor 46 Birchington Road London NW6 4LJ

    Erection of timber enclosure and decking to forecourt to restaurant (Class A3). [Retrospective]

    Decided 20 Oct 2016 Full applications

Timeline

Dates from the published record

  1. 10 Jan 2017

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2014/5696/P Granted

    Ground and basement floors 46 Birchington Road London NW6 4LJ

    Change of use of ground floor and basement from shop (Class A1) to restaurant (Class A3) including extract duct to roof at rear.

    Decided 23 Dec 2014 Full applications

What this grant of permission means

Camden granted permission on 10 January 2017, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Camden

  • 2026/3898/P Awaiting decision

    98 Marchmont Street London WC1N 1AG

    Installation of a new kitchen extraction and ventilation system to the rear of the premises, including associated external ductwork, extraction plant and ancillary equipment.

    16 Sep 2026 Full applications
  • 2026/2709/P Awaiting decision

    166A Camden Street London NW1 9PT

    Change of use from Use Class E to C3 Residential, demolition of existing store and office space, and erection of a three-bedroom dwellinghouse.

    16 Sep 2026 Full applications
  • 2026/3994/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 23 (LUL Subculture) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    15 Sep 2026 Full applications
  • 2026/3993/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Details to discharge Condition 22 (LUL Infrastructure) of planning reference 2023/5240/P dated 26/01/26 for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, caf?? and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    15 Sep 2026 Full applications
  • 2026/3861/P Awaiting decision

    Beaumont Court 1-45 College Grove London NW1 0RW

    Installation of condensors and minor alterations to elevations at lower floors.

    15 Sep 2026 Full applications