Skip to content
PlanIndex Get alerts
Menu

Planning application

Adjacent to 9 Lamble Street/Lamble Street Pram Sheds/Barrington Close Boiler House & Garages London NW5

Granted Camden 2014/4193/P Full applications

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Development of 5 new residential units on 3 sites in Lamble Street and Barrington Close comprising 2 x 4 bed houses and 3 x 3 bed houses.

As published by the council, reference 2014/4193/P

Application record

Reference
2014/4193/P
Category
Full applications
Status
Final Decision
Decision
Granted Subject to a Section 106 Legal Agreement
Decided
31 Mar 2015

Site history

Applications at this address on the Camden register

This site has had 4 applications since 2015: 4 approved, 0 refused.

  • 2016/0475/P Granted

    Adjacent to 9 Lamble Street/Lamble Street Pram Sheds/Barrington Close Boiler House & Garages London NW5

    Details of windows, green roof, tree protection, education infrastructure, public open space, energy assessment, highways improvements and construction management plan required by conditions 3, 5, 7, 13, 14, 15, 16 and 17 of planning permission 2014/4193/P dated 31/03/2015 for 5 new residential units on 3 sites in Lamble Street and Barrington Close comprising 2 x 4 bed houses and 3 x 3 bed houses.

    Decided 9 Aug 2017 Full applications
  • 2016/0405/P Granted

    Adjacent to 9 Lamble Street/Lamble Street Pram Sheds/Barrington Close Boiler House & Garages London NW5

    Removal of condition 12 (Code for Sustainable Homes Assessment) on planning permission 2014/4193/P dated 31/03/2015 for Development of 5 new residential units on 3 sites in Lamble Street and Barrington Close comprising 2 x 4 bed houses and 3 x 3 bed houses.

    Decided 5 May 2016 Full applications
  • 2015/2850/P Granted

    Adjacent to 9 Lamble Street/Lamble Street Pram Sheds/Barrington Close Boiler House & Garages London NW5

    Variation of condition 2 (approved plans) of planning permission 2014/4193/P dated 31/03/2015 (for the development of 5 new residential units on 3 sites in Lamble Street and Barrington Close comprising 2 x 4 bed houses and 3 x 3 bed houses) namely, amendments to the fenestration on sites 1, 2 &3; swapping of balcony floors on site 3; enclosure of roof terrace and increase in height of dwellinghouse at site 2.

    Decided 5 May 2016 Full applications

Timeline

Dates from the published record

  1. 31 Mar 2015

    Decision issued: Granted Subject to a Section 106 Legal Agreement

  2. 22 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

3 later applications on the register refer to this one:

  • 2016/0475/P Granted

    Adjacent to 9 Lamble Street/Lamble Street Pram Sheds/Barrington Close Boiler House & Garages London NW5

    Details of windows, green roof, tree protection, education infrastructure, public open space, energy assessment, highways improvements and construction management plan required by conditions 3, 5, 7, 13, 14, 15, 16 and 17 of planning permission 2014/4193/P dated 31/03/2015 for 5 new residential units on 3 sites in Lamble Street and Barrington Close comprising 2 x 4 bed houses and 3 x 3 bed houses.

    Decided 9 Aug 2017 Full applications
  • 2016/0405/P Granted

    Adjacent to 9 Lamble Street/Lamble Street Pram Sheds/Barrington Close Boiler House & Garages London NW5

    Removal of condition 12 (Code for Sustainable Homes Assessment) on planning permission 2014/4193/P dated 31/03/2015 for Development of 5 new residential units on 3 sites in Lamble Street and Barrington Close comprising 2 x 4 bed houses and 3 x 3 bed houses.

    Decided 5 May 2016 Full applications
  • 2015/2850/P Granted

    Adjacent to 9 Lamble Street/Lamble Street Pram Sheds/Barrington Close Boiler House & Garages London NW5

    Variation of condition 2 (approved plans) of planning permission 2014/4193/P dated 31/03/2015 (for the development of 5 new residential units on 3 sites in Lamble Street and Barrington Close comprising 2 x 4 bed houses and 3 x 3 bed houses) namely, amendments to the fenestration on sites 1, 2 &3; swapping of balcony floors on site 3; enclosure of roof terrace and increase in height of dwellinghouse at site 2.

    Decided 5 May 2016 Full applications

What this grant of permission means

Camden granted permission on 31 March 2015, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Adjacent to 9 Lamble Street/Lamble Street Pram Sheds/Barrington Close Boiler House & Garages London NW5

    2016/0405/P 0m away

    Removal of condition 12 (Code for Sustainable Homes Assessment) on planning permission 2014/4193/P dated 31/03/2015 for Development of 5 new residential units on 3 sites in Lamble Street and Barrington Close comprising 2 x 4 bed houses and 3 x 3 bed houses.

    Granted Full applications
  • Adjacent to 9 Lamble Street/Lamble Street Pram Sheds/Barrington Close Boiler House & Garages London NW5

    2016/0475/P 0m away

    Details of windows, green roof, tree protection, education infrastructure, public open space, energy assessment, highways improvements and construction management plan required by conditions 3, 5, 7, 13, 14, 15, 16 and 17 of planning permission 2014/4193/P dated 31/03/2015 for 5 new residential units on 3 sites in Lamble Street and Barrington Close comprising 2 x 4 bed houses and 3 x 3 bed houses.

    Granted Full applications Windows or glazing Trees
  • 50 Lamble Street Gospel Oak London

    2022/4017/P Submitted 19 Sep 2022 23m away

    Erection of a two storey dwellinghouse.

    Withdrawn Full applications 26 docs
    Domestic
  • 16-39 Lamble Street London NW5 4AS

    2013/3010/P 29m away

    Installation of handrail on roof of residential flats (Class C3)

    Granted Full applications New dwelling
  • 1-9 Lamble Street London NW5 4AH

    2015/3706/P 48m away

    Replacement or refurbishment of existing windows; replacement of rooflights; replacement of existing mesh infill to rear; installation of new roof edge protection barrier.

    Granted Full applications Extension Loft or dormer +2
  • 11 Elaine Grove London NW5 4QG

    2021/3365/P 48m away

    Erection of a single storey infill extension at ground floor level to the to the rear, flank elevation.

    Granted Full applications Extension
    Small domestic

In Camden

  • 2026/2516/P Withdrawn

    31 Loveridge Road London Camden NW6 2DU

    Amalgamation of the existing three self-contained one-bedroom flats into a single-family dwelling house; demolition and replacement of existing outrigger; erection of a single-storey rear wrap-around extension; erection of a rear dormer extension; creation of a roof terrace above outrigger; replacement of existing windows with timber double glazed units; installation of rooflights to front roofslope; and installation of an air source heat pump in rear garden.

    16 Jun 2026 Full applications
  • 2026/3830/P Awaiting decision

    Euston Tower 286 Euston Road London NW1 3DP

    Deed of variation to allow more flexibility with Affordable housing payments for redevelopment of Euston Tower comprising retention of parts of the existing building (including central core, basement and foundations) and erection of a new building incorporating these retained elements, to provide a 32-storey mixed-use building providing offices and research and development floorspace (Class E(g)) and office, retail, café and restaurant space (Class E) and Enterprise Space (Class E/F) at ground and first floors, and associated external terraces; public realm enhancements, including new landscaping and provision of new publicly accessible steps and ramp; short and long stay cycle storage; servicing; refuse storage; plant and other ancillary and associated work.

    4 Sep 2026 Full applications
  • 2026/3282/P Granted

    5 Berkley Road London NW1 8XX

    Installation of 1no. above ground gas riser from the basement flat to the meter box at first floor (retrospective)

    31 Jul 2026 Full applications
  • 2026/0483/P Granted

    100 Avenue Road London NW3 3HF

    Discharge of details for condition 47 (surface water run off details) of planning permission 2026/0404/P granted on 19/06/2026 for " Variation of conditions (2 plan numbers); 8 (quantum of commercial space); 13 (commercial windows); 15 (Wind Microclimate); 19 (commercial windows); 24 (Air quality); 34 (development quantum); 40 (Circular Economy); 44 (designing out crime); 45 (Fire Strategy); 46 (SuDS); 48 (Community facility removed), 48 (wheelchair units), 49 (TfL health and safety) to planning permission ref. 2025/0852/P (for demolition of building and provision of a mixed-use residential-led development) to secure alterations to the external appearance; internal residential and commercial space layouts; omission of community floorspace and increased affordable housing provision; cycle and car parking; hard and soft landscaping, and other associated amendments”

    9 Feb 2026 Full applications
  • 2026/2697/P Awaiting decision

    Flat 1, 73 Eton Avenue London NW3 3EU

    Replacement of existing defective rear lean-to conservatory with a new slimline powder-coated aluminium framed conservatory with clear double glazing, on the exact same footprint as existing.

    3 Sep 2026 Full applications