Skip to content
PlanIndex Get alerts
Menu

Planning application

12-16 Laystall Street London EC1R 4PF

Granted Camden 2014/1312/P Full applications

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Installation of double doors at ground floor level to office building

As published by the council, reference 2014/1312/P

Application record

Reference
2014/1312/P
Category
Full applications
Status
Final Decision
Decision
Granted
Decided
21 May 2014
Postcode
EC1R 4PF

Site history

Applications at this address on the Camden register

This site has had 5 applications since 2014: 5 approved, 0 refused.

  • 2020/3491/P Granted

    12-16 Laystall Street London EC1R 4PF

    Non-material amendments to planning permission ref: 2019/3077/P dated 09/08/2019 for 'Alterations at front elevation to include replacement windows, doors and ground floor frontage to office building (Use B1a)'; namely to alter the windows and doors on the front facade.

    Decided 26 Nov 2020 Amendments
  • 2020/1095/P Granted

    12-16 Laystall Street London EC1R 4PF

    Details of condition 4 (samples and manufacturers details of slip panelling and windows) of planning permission 2019/3077/P dated 09/08/2019 for 'Alterations at front elevation to include replacement windows, doors and ground floor frontage to office building'.

    Decided 20 May 2020 Full applications
  • 2019/3077/P Granted

    12-16 Laystall Street London EC1R 4PF

    Alterations at front elevation to include replacement windows, doors and ground floor frontage to office building (Use B1a)

    Decided 9 Aug 2019 Full applications
  • 2014/2066/A Granted

    12-16 Laystall Street London EC1R 4PF

    Installation of 2 externally illuminated fascia signs.

    Decided 28 Apr 2014

Timeline

Dates from the published record

  1. 21 May 2014

    Decision issued: Granted

  2. 22 Jul 2026

    Added to PlanIndex

What this grant of permission means

Camden granted permission on 21 May 2014, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • 12-16 Laystall Street London EC1R 4PF

    2014/2066/A 50 yards away

    Installation of 2 externally illuminated fascia signs.

    Granted
  • 12-16 Laystall Street London EC1R 4PF

    2020/3491/P Submitted 5 Aug 2020 50 yards away

    Non-material amendments to planning permission ref: 2019/3077/P dated 09/08/2019 for 'Alterations at front elevation to include replacement windows, doors and ground floor frontage to office building (Use B1a)'; namely to alter the windows and doors on the front facade.

    Granted Amendments Windows or glazing 7 docs
  • 12-16 Laystall Street London EC1R 4PF

    2020/1095/P 50 yards away

    Details of condition 4 (samples and manufacturers details of slip panelling and windows) of planning permission 2019/3077/P dated 09/08/2019 for 'Alterations at front elevation to include replacement windows, doors and ground floor frontage to office building'.

    Granted Full applications Windows or glazing
  • 12-16 Laystall Street London EC1R 4PF

    2019/3077/P Submitted 14 Jun 2019 50 yards away

    Alterations at front elevation to include replacement windows, doors and ground floor frontage to office building (Use B1a)

    Granted Full applications Windows or glazing 5 docs
  • 13-19 Vine Hill London EC1R 5DX

    2012/1253/A 50 yards away

    Display of internally illuminated projecting sign and externally illuminated steel lettering.

    Granted
  • 13-19 Vine Hill London EC1R 5DX

    2012/1252/P 50 yards away

    Alterations involving the relocation of entrance door & panels, and installation of roller shutter at ground floor level in connection with existing office use (Class B1).

    Granted Full applications

In Camden

  • 2026/0369/P Granted

    Railway embankment and land west of 49 Adelaide Road London NW3 3QB

    Installation of a new DNO (Distribution Network Operator) cabinet and erection secure access gate to Adelaide Road, erection of staircase to railway embankment, associated works.

    Received 17 Jul, published by the council 24 Jul 2026 Full applications
  • 2026/3694/P Granted

    19 Charterhouse Street London EC1N 6RA

    Details pursuant to condition 19 (external lighting) of planning permission 2025/1683/P, granted subject to a legal agreement on 05/06/2026, for remodelling, refurbishment and extensions (including 3 additional storeys) of the existing building to provide Use Class E (commercial, retail/restaurant and jewellery workspace) and associated landscaping and facade works.

    Received 27 Aug, published by the council 5 Sep 2026 Full applications
  • 2026/3904/P Granted

    14 Templewood Avenue London NW3 7XA

    Details pursuant to Condition 5 (Tree protection measures) of planning permission 2026/2315/P dated 10/08/2026 for "Erection of an orangery/outbuilding in the rear garden."

    Received 9 Sep, published by the council 11 Sep 2026 Full applications
  • 2025/2002/P Granted

    11 Doughty Street London WC1N 2PL

    Change of use from office (Class E) to residential to form a single-family dwelling (Class C3); associated internal and external alterations

    Received 9 May, published by the council 22 Jul 2026 Full applications
  • 2026/3551/P Granted

    19 Charterhouse Street London EC1N 6RA

    Details pursuant to condition 21 (Details of gates/barriers onto Charterhouse Street) of planning permission 2025/1683/P, granted subject to a legal agreement on 05/06/2026, for remodelling, refurbishment and extensions (including 3 additional storeys) of the existing building to provide Use Class E (commercial, retail/restaurant and jewellery workspace) and associated landscaping and facade works.

    Received 19 Aug, published by the council 22 Aug 2026 Full applications